What a foundation repair bid should include

The short answer

A complete foundation repair bid rests on an engineer's evaluation, then spells out the method, how many piers or anchors go in, where they go and how deep. It also covers the cause, like drainage, plus permits, restoring what gets dug up and a warranty that says what it covers and whether it transfers. Getting a second opinion on structural work is a smart move, not an insult to anyone.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Install piers as needed to stabilize foundation”

    Ask for this in writingAsk for the number of piers, a drawing of where they go, the depth or load for each, and a price for any added pier you approve first.

  • “Lift home to maximum practical recovery”

    Ask for this in writingAsk for the lift goal in inches at each area, and floor readings before and after the work.

  • “Lifetime transferable warranty”

    Ask for this in writingAsk what movement counts as a claim, whether leaks are covered, how a transfer works and whether there's a fee.

  • “Restore work area”

    Ask for this in writingAsk exactly what gets put back, such as soil, sod, plants, concrete or interior floors, and what's excluded.

A payment plan tied to finished work

Foundation work is mostly hidden once it's done, so tie payments to steps you can see or an inspector or engineer signs off on. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance for the final inspection and restoration. The payment schedule checker can flag a plan that runs ahead of the work.

StageShare
Deposit at signing10%
Engineer's plan approved and permit issued15%
Piers or anchors installed, with the pier report40%
Lift complete, with before and after floor readings20%
Final inspection passed and site restoredBalance
Check your own payment schedule →

Comparing two or three bids

  • Start by checking that every bid is fixing the same problem; if the engineer's report and the bids disagree on the cause, ask about that first.
  • Line up the method, number of piers and their depth or load, since one bid with fewer piers isn't the same job.
  • Compare what each bid restores afterward, because one may include concrete and landscaping and another may leave it to you.
  • Read each warranty side by side for length, what counts as a claim and whether it transfers when you sell.
  • Before you pick one, run a free bid check so you know which questions to bring to each contractor.

Questions to ask before you sign

  1. 1Do you have a structural engineer's report or stamped plan for this repair?
  2. 2Which repair method are you using, and why is it right for my soil and house?
  3. 3How many piers or anchors go in, where, and how deep or to what load?
  4. 4Will I get a pier report and floor readings before and after?
  5. 5What's your price per added pier, and will you ask me before adding any?
  6. 6Will you test the plumbing before and after any lifting?
  7. 7What exactly will you restore when you're done?
  8. 8What does your warranty cover, how long is it, and does it transfer to a buyer?

Permits

Structural repairs like piers, wall anchors and underpinning commonly need a permit and an inspection, so check with your city or county building department. The licensed contractor should pull the permit and work from the engineer's plan; see who's responsible for permits.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

Do I need a structural engineer before foundation repair?

It's a smart step for most foundation work. An engineer has no stake in which repair you buy and can tell you what's moving and why. Some contractors include an engineer's report, so ask whether yours does and get a copy.

Why do foundation repair bids list such different numbers of piers?

Contractors may read the problem differently, use different methods or space piers differently. Ask each one for a drawing and the reason behind their count, and compare it to the engineer's plan. A bid with fewer piers is only cheaper if it fixes the same problem.

Should a foundation repair quote include drainage?

If water is part of the cause, the bid should either include drainage fixes or say who handles them. Ask the engineer and the contractor whether gutters, grading or downspouts need work. Otherwise the same water can keep working on the new repair.

Is a lifetime foundation warranty worth it?

It can be, if you know what it covers. Read whether it covers movement, leaks or both, how a claim works and whether it transfers when you sell. Get the warranty terms with the bid, not after the job.

What if structural problems show up after the work?

Start by writing down what you see and contacting the contractor under the warranty. Our page on structural and foundation defects walks through the next steps.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.