The short answer
A complete plumbing bid says exactly which lines, fixtures or water heater are covered, what pipe material is used, and whether lines are replaced or only repaired. It also covers who patches the walls, the permit and pressure test, and a set rate for anything found once walls are open. That last part is where most plumbing bills grow, so it's worth getting in writing.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Repipe house”
Ask for this in writingAsk which lines are covered (supply, drains or both), the pipe material and sizes, and how many fixtures are reconnected.
“Replace water heater”
Ask for this in writingAsk for the type, fuel, capacity, model and any expansion tank, pan, venting or straps that are included.
“Additional work at time and material”
Ask for this in writingAsk for the hourly rate, a markup on materials if any, and a promise to get your written okay before going past a set amount.
“Patch as needed”
Ask for this in writingAsk whether patching includes texture and paint, or only closing the hole, and which openings are covered.
A payment plan tied to finished work
Smaller plumbing jobs are often paid in one go when the work is done and tested. For a repipe or bigger job, tie payments to stages you can see, keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance until the final inspection and patching are done. You can run your schedule through the payment schedule checker.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| New lines run and pressure tested | 35% |
| Rough-in inspection passed | 20% |
| Fixtures set, water on and no leaks | 20% |
| Walls patched and final inspection passed | Balance |
Comparing two or three bids
- Line up the same scope first: which lines, which fixtures and whether drains are included, since one bid may be twice the work of another.
- Compare pipe material and replace-or-repair side by side, because those choices explain most price gaps.
- Check whether each bid includes patching and paint; leaving it out can make a bid look cheaper than the finished job will be.
- Compare the hourly rate or unit prices for surprises, as they'll matter if walls hold anything unexpected.
- When you've picked a favorite, run a free bid check on it before you sign.
Questions to ask before you sign
- 1Which lines and fixtures does this price cover, and are drains included?
- 2What pipe material and sizes will you use, and why?
- 3Are you replacing the lines or repairing them?
- 4Who patches and paints the walls after?
- 5Will you pressure test the new lines and schedule the inspection?
- 6What's your rate for anything you find once walls are open, and will you ask me first?
- 7How long will the water be off each day?
- 8What's your labor warranty, and who registers any equipment?
Permits
Repiping, moving drains, sewer line work and water heater replacement commonly need a plumbing permit, so check with your city or county building department. The licensed plumber should pull it and schedule the inspection; see who's responsible for permits.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should a plumbing quote include drywall repair?
It should say either way. Some plumbers patch and paint, some only close the opening, and some leave it to you. Ask before you sign so you can budget for it if needed.
Is a flat price or time and materials better for plumbing?
A flat price is easier to compare, and time and materials can be fair when nobody knows what's behind the wall. If part of the job is time and materials, ask for the rate, a cap and your written okay before going past it.
What should a water heater replacement quote include?
The type, fuel, capacity and model, plus venting, gas or electrical hookup and any expansion tank, pan or straps your area requires. It should also cover removal of the old tank, the permit and the warranty.
Why are my repipe quotes so different?
Pipe material, how many fixtures are reconnected, whether drains are included and who patches walls can all change the price. Line the bids up item by item, and see our guide to why contractor bids vary.
What if the final plumbing bill is higher than the estimate?
Ask for an itemized invoice that shows each added charge and when you approved it. Our page on a final bill higher than the estimate walks through what to ask.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.