The short answer
A good painting bid lists exactly which rooms or surfaces get painted, names the paint brand, product line and sheen, and says how many coats. It also spells out the prep, like scraping, sanding, patching, caulking and primer, and covers lead-safe practices for homes built before 1978. Prep and coats are where painting bids differ most, so those lines matter more than the total.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Paint interior of home, 2 coats”
Ask for this in writingAsk which rooms and surfaces are included, like ceilings, trim and doors, and the paint product and sheen for each.
“Prep as needed”
Ask for this in writingAsk for the prep steps in writing: washing, scraping, sanding, patching, caulking and priming, and where each applies.
“Premium paint”
Ask for this in writingAsk for the brand and product line by name, so you can check it and compare it with the other bids.
“Repair minor wood rot”
Ask for this in writingAsk what minor means, a price per foot or per hour for anything more, and that you'll see it and okay it first.
A payment plan tied to finished work
For a painting job, pay as stages are finished, not on a calendar. Keep the deposit modest, or your state's limit, if lower, and ask for a receipt if it pays for paint. Hold the final payment until the walkthrough and touch-ups are done, and test the schedule with our payment schedule checker.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Paint and materials delivered | 20% |
| Prep and priming finished and checked | 25% |
| All finish coats applied | 30% |
| Walkthrough and touch-ups done | Balance |
Comparing two or three bids
- Line up the surfaces each bid covers, because one may include ceilings, trim or doors and another may not.
- Compare paint by brand and product line, not just by price per gallon or the word premium.
- Check that each bid lists the same number of coats and the same prep steps.
- For exteriors, compare how each handles wood rot and whether repairs are priced up front.
- Use our bid comparison spreadsheet to line them up, or run a free bid check.
Questions to ask before you sign
- 1Which surfaces are included, and is anything left out?
- 2Which paint brand, line and sheen will you use on each surface?
- 3How many coats, and does primer count as one?
- 4What prep will you do before painting?
- 5Is your firm EPA RRP certified, and how will you handle lead-safe work?
- 6What happens if you find rotted wood, and how is it priced?
- 7How many colors are included, and what if I change one?
- 8What does your warranty cover, and for how long?
Permits
Painting usually doesn't need a building permit, though repairing structural wood or replacing siding may, and some HOAs or historic districts ask for color approval. Check with your city or county building department, and if a permit is needed, have the licensed contractor pull it.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should a painting estimate include the number of coats?
Yes, it should. The number of coats is one of the biggest differences between bids. Ask for it for each surface and whether primer counts as a coat.
Does a house painting quote include the paint?
Usually, but not always. The quote should say who supplies the paint and name the brand and product line. If you're buying it, ask how much they'll need.
What prep should a painting bid include?
It depends on the surface, but most bids should list washing, scraping, sanding, patching, caulking and spot-priming where needed. If a bid just says prep, ask for the steps in writing.
What should I do if the paint starts peeling after the job?
Check the warranty in your contract and send the painter photos and a written request to fix it. Here's more on what to do if a contractor won't honor a warranty.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.