The short answer
A good flooring bid lists the square footage for each room plus a waste allowance, and names the exact product by brand, line, thickness or wear layer and color. It also prices or caps subfloor prep and leveling, includes a moisture test where it matters, and says who handles removal, trim, transitions and moving furniture. Those lines are what make two flooring quotes comparable.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Install LVP throughout main floor, approx. 900 sq ft”
Ask for this in writingAsk for square footage by room, the waste allowance, and the exact product by brand, line, wear layer and color.
“Floor prep as needed”
Ask for this in writingAsk for a unit price for leveling and subfloor repair, a cap, and a written okay from you before going past it.
“Remove existing flooring”
Ask for this in writingAsk whether haul-off is included, what's under the current floor, and whether older materials will be tested before removal.
“Trim and transitions included”
Ask for this in writingAsk which rooms get new baseboard or shoe molding, how many transitions, and whether stair nosing is part of it.
A payment plan tied to finished work
Flooring jobs are shorter, but the same idea holds: pay as you can see the work done. Keep the deposit modest, or your state's limit, if lower, and if the deposit buys the material, ask to pay that part when it's delivered, with a receipt. See our deposit limits by state page.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Material delivered to your home and checked | 30% |
| Old floor removed and subfloor prepped | 20% |
| Flooring installed in all rooms | 30% |
| Trim, transitions and walkthrough done | Balance |
Comparing two or three bids
- Check that every bid uses about the same square footage and waste allowance, since a low count can make a quote look cheaper.
- Compare the exact products, including wear layer or thickness, not just the type of flooring.
- Line up how each bid handles leveling and subfloor repair, because that's where flooring totals usually grow.
- See which bids include removal, baseboard, transitions, stairs and moving furniture, and which charge extra.
- Put the quotes side by side in our bid comparison spreadsheet, or run a free bid check.
Questions to ask before you sign
- 1What square footage and waste allowance did you use for each room?
- 2What exact product is this, including the wear layer or thickness?
- 3How will you check and price floor leveling once the old floor is up?
- 4Will you do a moisture test before installing over concrete?
- 5Which underlayment are you using, and does the manufacturer require it?
- 6Is removal, haul-off and moving furniture included?
- 7How are stairs priced, and are transitions and baseboard included?
- 8What's your labor warranty, separate from the product warranty?
Permits
Replacing floor coverings often doesn't need a permit, but repairing or replacing structural subfloor or joists may, and some condo or HOA buildings have their own rules for sound underlayment. Check with your city or county building department, and if a permit is needed, have the licensed contractor pull it.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should a flooring quote include subfloor leveling?
It should at least say how leveling is priced. Many quotes include a little and charge for more, so ask for a unit price and a cap. That way the total doesn't change without your okay.
How much waste should a flooring bid include?
It depends on the product, the room shapes and the layout pattern. The bid should show the waste allowance so you can compare it across quotes and ask why one is higher.
Is removing old flooring included in a flooring quote?
Not always. The quote should list removal and haul-off as included or not. In older homes, ask about testing old vinyl or adhesive before it's removed.
Why is one flooring quote so much cheaper?
Often it uses less square footage, a thinner product or leaves out prep, trim or stairs. Compare line by line. Here's more on whether a contractor quote is fair.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.