The short answer
A complete deck bid names the size, height and plan the price is based on, the footings, how the deck attaches to your house, and the exact lumber or composite boards. It also says who pulls the permit, whether the old deck comes out, and whether stain or sealer is included. If your bid covers most of that, you're in good shape, and the rest is a few questions.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Build new deck per customer specs”
Ask for this in writingAsk for a drawing or written spec with the size, height, number of stairs and railing type, so the price is tied to something you can both point to.
“Composite decking”
Ask for this in writingAsk for the product line and color, plus the square footage, written into the bid so you get the boards you picked.
“Footings as required”
Ask for this in writingAsk for the number, size and depth of the footings, and a price per extra footing if the inspector asks for more.
“Attach to house”
Ask for this in writingAsk how: a bolted or lagged ledger with flashing, or a freestanding deck on its own posts. Get the method written into the scope.
“Stain optional”
Ask for this in writingAsk whether staining is in this price, which product they'll use, and when they'll come back to do it.
A payment plan tied to finished work
A deck goes up in clear steps, so it's easy to pay as each one is done. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance until the final inspection. You can test any schedule with the payment schedule checker.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Footing holes dug and passed inspection | 20% |
| Framing and ledger done (framing inspection, if required) | 30% |
| Decking, railings and stairs installed | 30% |
| Final inspection passed and punch list done | Balance |
Comparing two or three bids
- Line up the footings first. Their number, size and depth often explain a big gap between two deck bids.
- Check that each bid uses the same decking line and color, or you're comparing two different decks.
- Compare how each bid attaches the deck. A ledger-attached deck and a freestanding deck are different jobs with different prices.
- See which bids include old deck removal, permit fees and stain, and add those costs to any bid that leaves them out.
- Put the warranties side by side, both the builder's workmanship warranty and the decking maker's.
- Line them up in our bid comparison spreadsheet, or run a free bid check on each one.
Questions to ask before you sign
- 1Will you attach the deck to the house or build it freestanding, and why?
- 2How many footings will there be, and how deep will they go?
- 3What lumber grade will you use for the posts, beams and joists?
- 4How far apart will the joists be for the boards I picked?
- 5Who pulls the permit, and which inspections will there be?
- 6What railing height and style are you planning?
- 7Is removing and hauling away the old deck in this price?
- 8What does your workmanship warranty cover, and for how long?
Permits
Many cities and counties require a permit for a new deck, especially one attached to the house or raised off the ground, and they often inspect the footings and framing. Check with your city or county building department, and have your licensed contractor pull the permit (here's who's responsible for permits).
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should a deck quote include the permit?
It should say who pulls the permit and whether the fee is in the price. Usually the licensed contractor pulls it and schedules the inspections. If the bid doesn't mention it, ask for a line that covers both.
What's a ledger board, and why does the bid need to mention it?
The ledger is the board that connects a deck to your house. It should be bolted or lagged into the house framing and flashed so water can't get behind it. A bid that just says "attach to house" leaves out the part that matters most, so ask how it'll be done.
Why are composite deck bids so different from each other?
Composite lines can differ in look, heat and warranty, and the joists under them often need closer spacing. Two bids that both say "composite" may be pricing different boards and different framing. Ask each contractor for the product line and joist spacing.
Should a deck bid include stain or sealer?
Not always, so check. New treated lumber often needs time to dry before it takes stain, which means a second visit. Ask whether that visit is included, which product they'll use and when.
Can a contractor reuse my old deck's frame?
Sometimes, if the framing, footings and ledger are sound. Ask the contractor to write down what they checked, and get a price for replacing any soft joists they find. If the bid assumes the frame is fine, ask what happens if it isn't.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.