Skip to content
OwnersBack

Bid checklists

What a windows and siding bid should include

The short answer

A complete windows or siding bid names the exact product, lists every opening with its size, and says how each window is installed and flashed. It also covers the barrier behind the siding, trim and caulking, lead-safe work on older homes, and both warranties. With those in writing, you can compare bids line by line and know what you're getting.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Install 14 replacement windows”

    Ask for this in writingAsk for a list of each opening with its room, size, style, glass package and whether it's an insert or full-frame install.

  • “Energy-efficient glass”

    Ask for this in writingAsk for the glass package and its energy ratings for each window, written into the bid.

  • “Repair rot as needed”

    Ask for this in writingAsk for a price per opening or per foot of framing, and photos before any repair is added to the bill.

  • “Wrap house and install new siding”

    Ask for this in writingAsk for the siding product, thickness, color, the type of house wrap, taped seams and the trim pieces by name.

  • “Lifetime warranty”

    Ask for this in writingAsk whose warranty it is, whether labor is covered, for how many years, and whether it transfers if you sell.

A payment plan tied to finished work

Windows are usually custom-made, so part of the price often goes toward the order, and it's fair to ask for proof that it was placed. Keep the deposit modest, or your state's limit, if lower (our deposit limits page has more), and pay the rest as openings and walls are finished. Hold the balance until the final walkthrough, and test the plan with the payment schedule checker.

StageShare
Deposit at signing10%
Windows delivered and checked for size and damage30%
Windows installed, flashed and trimmed25%
House wrap, siding and trim installed25%
Final walkthrough, punch list and cleanup doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Line up the window count and sizes first; if two bids list a different number of openings, sort that out before comparing price.
  • Compare the same glass package and frame material, since a higher-rated glass or a different frame can explain most of a price gap.
  • Check whether each bid is an insert or a full-frame install, because those are different jobs with different results.
  • Look at how each bid handles rot and trim, as those are the lines that most often grow once the old windows come out.
  • Read our guide to why contractor bids vary, then run a free bid check on the bid you like best.

Questions to ask before you sign

  1. 1Is this an insert or a full-frame install, and why do you recommend it for my house?
  2. 2Can I see a list of every window with its size, style and glass package?
  3. 3How will each window be flashed, and what do you do if you find rot?
  4. 4What happens to the trim inside and out?
  5. 5Is your firm lead-safe certified, and how will you contain dust?
  6. 6What's the lead time on the windows, and when do you place the order?
  7. 7Who registers the manufacturer warranty, and what does your labor warranty cover?
  8. 8For siding, will the old siding come off, and what goes behind the new siding?

Permits

Changing the size of a window opening, structural repairs or a full re-siding often need a permit, and some areas require one for any window replacement, so check with your city or county building department. The licensed contractor should pull it and schedule any inspection; see who's responsible for permits.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

Should a window quote list the size of each window?

Yes, a clear quote lists every opening with its size and style. It lets you check that nothing was missed and that the windows will fit. If your quote only gives a total count, ask for the list before you sign.

What's the difference between insert and full-frame window replacement?

An insert sits inside the old frame, so it's faster and leaves the inside trim alone, but the glass gets a little smaller. A full-frame install removes the old frame, which lets the crew see and fix rot and flash the opening fresh. The bid should say which one you're getting.

Does my window contractor need to be lead-safe certified?

If your home was built before 1978, work that disturbs painted surfaces, like removing old windows, generally calls for a lead-safe certified firm. Ask for the firm's certification and how they'll contain dust. If you're not sure of your home's age, ask the contractor to treat it as older until you know.

Should a siding bid include house wrap?

A good siding bid names the water barrier that goes behind the siding and how its seams and openings are sealed. Siding sheds most rain, but the barrier is what handles the water that gets past it. If it isn't listed, ask what goes behind the new siding.

Why are my window bids so far apart?

Different glass, frame material, install method and trim work can each change the price a lot. Line the bids up item by item, and ask each contractor what's driving their number.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.

Window and siding bid checklist: what it should include | OwnersBack