Bid checklists
What should your contractor's bid include?
Pick your project. Each checklist shows what a complete bid for that job spells out, the vague lines worth a question, a payment plan tied to finished work, and what to ask before you sign.
Run a free bid check
Upload one bid, or compare two or three. About a minute, no account.
23 checklists
Inside the house
Outside and the yard
- Roof replacementWhat a roof replacement bid should include
- Windows and sidingWhat a windows and siding bid should include
- DeckWhat a deck bid should include
- FenceWhat a fence bid should include
- Patio and paversWhat a patio or paver bid should include
- Concrete and drivewayWhat a concrete or driveway bid should include
- Retaining wallWhat a retaining wall bid should include
- Landscaping and irrigationWhat a landscaping or irrigation bid should include
- Pool and spaWhat a pool or spa bid should include
Systems and repairs
- HVAC replacementWhat an HVAC replacement bid should include
- PlumbingWhat a plumbing bid should include
- ElectricalWhat an electrical bid should include
- Solar panelsWhat a solar panel bid should include
- Foundation repairWhat a foundation repair bid should include
- Water and fire damageWhat a water or fire damage repair bid should include