What a fence bid should include

The short answer

A complete fence bid gives the length, height, material and style, the number and width of gates, and how the posts are set, including their size, spacing and depth. It also says who confirms the property line, who calls to mark buried utilities and whether the old fence comes out. If your bid covers most of that, you're in good shape, and the property line is the one item to settle in writing first.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Install 6 ft privacy fence per layout”

    Ask for this in writingAsk for the total linear feet, a drawing of the layout and the material and grade by name, attached to the bid.

  • “Posts set as needed”

    Ask for this in writingAsk for the post size, spacing and depth, and whether they're set in concrete.

  • “Fence along property line”

    Ask for this in writingAsk who confirms the line and how far inside it the fence will sit, in writing.

  • “Gate included”

    Ask for this in writingAsk how many gates, how wide, which way they swing and which hardware.

  • “Remove old fence if applicable”

    Ask for this in writingAsk for a clear yes or no, and whether the old concrete around the posts gets dug out and hauled away.

A payment plan tied to finished work

Most fence jobs are short, so a simple schedule works well. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state). If special materials need to be ordered, ask to pay for them when they're delivered to your property, and test the plan with our payment schedule checker.

StageShare
Deposit at signing10%
Materials delivered to your property30%
All posts set (and inspected, if required)30%
Panels, gates and hardware installed, old fence hauled awayBalance
Check your own payment schedule →

Comparing two or three bids

  • Make sure each bid prices the same total linear feet. Contractors who measure differently can make prices look further apart than they are.
  • Line up post size, spacing and depth. A lower bid sometimes has fewer or shallower posts.
  • Compare the material grade, not just the material. Two bids that both say cedar can use very different boards.
  • Count the gates in each bid and check their width and hardware.
  • See which bids include removal, haul-off, the permit and stain, and add those costs to the bids that leave them out. Then run a free bid check on the one you like best.

Questions to ask before you sign

  1. 1How will you confirm the property line, and how far inside it will the fence sit?
  2. 2How deep will the posts go, and will they be set in concrete?
  3. 3How far apart will the posts be?
  4. 4Who handles the permit and any HOA approval?
  5. 5Is removing and hauling away the old fence included?
  6. 6How will you handle the slope along the fence line?
  7. 7What does your warranty cover if a post leans or a gate sags?

Permits

Many cities and counties require a permit for fences over a certain height, in front yards or around pools, and HOAs often have their own approval. Check with your city or county building department and your HOA, and have your licensed contractor pull any permit (see who's responsible for permits).

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

Who's responsible for knowing where the property line is?

Usually it's the homeowner, unless the contract says otherwise. If you're not sure where the line is, a survey settles it. Ask the bid to say who confirms the line and how far inside it the fence will go.

How deep should fence posts be set?

It depends on the fence height, your soil, the wind and how deep the ground freezes where you live. What matters in the bid is that the depth is written down, so every contractor is pricing the same work.

Should a fence quote include removing the old fence?

Not always, so check. Removal means pulling the old posts and their concrete, which takes real time. Ask for a clear yes or no and whether haul-off is in the price.

Do I need to talk to my neighbor before a new fence goes in?

Rules vary by place, and some areas have rules about shared fences. Even where it isn't required, a friendly heads-up helps. If the fence will sit right on the shared line, get your neighbor's agreement in writing before work starts.

Why is my new fence leaning already?

Common causes are shallow posts, posts without enough concrete, soft ground or wind pushing on a solid privacy fence. Check your warranty and contact the contractor in writing with photos. Here's what to do if a contractor won't fix mistakes.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.