The short answer
Your odds: Often a good claimOften, yes, you have real options. A written warranty is a promise you can enforce like any other part of your contract, and many states also imply a promise that repair and remodel work will be done in a good and workmanlike way. The key condition is timing: you usually must give written notice of the problem and act before the warranty period and your state's filing deadline run out.
What to know
- A contractor's written warranty is an enforceable promise, not a courtesy.
- Read the warranty first, because in some states its written terms replace the broader implied promise of good work.
- Warranties on products like shingles or windows may be enforced against the manufacturer under federal law.
- Many states require written notice and a chance to inspect or repair before you sue.
- Deadlines are strict, so put every warranty request in writing and keep proof it was received.
On this page
The law, in detailTap a topic to open it.
Do you have a case?
A warranty claim usually comes down to four things. First, there was a warranty: a written one in your contract or on a separate certificate, or a promise the law implies. Second, the problem is covered: it is the kind of defect the warranty describes, and it showed up during the warranty period. Third, you told the contractor about it, ideally in writing, and gave a fair chance to fix it if the warranty or your state's law requires that. Fourth, the contractor refused, ignored you, or made repairs that did not work.
Read the exclusions closely. Many warranties leave out damage from misuse, normal wear, settling, storms or work done by someone else. A contractor who points to a real exclusion may be right. A contractor who simply stops answering, or calls an obvious workmanship failure normal wear, usually is not. If the contractor is ignoring you altogether, our page on a contractor who won't fix mistakes covers the same ground from another angle.
If you have a solid claim, the usual goal is one of two outcomes: the contractor makes proper repairs, or you get the reasonable cost of having another licensed contractor do them.
The legal claims that usually apply
Breach of express warranty. The written warranty is part of your deal, so refusing to honor it is a breach of contract. You can usually recover the reasonable cost to fix what the warranty covers.
Breach of implied warranty. Many states read a promise of good and workmanlike work into repair and remodel contracts even when nothing is written. In Texas, for example, the state's Supreme Court held that when someone is hired to repair or modify existing property, the law implies a promise that the work will be done in a good and workmanlike manner, and consumers can sue for breach of it under the Texas Deceptive Trade Practices Act[1]. Other states handle implied warranties in their own ways. For a newly built home, some states set the warranty by statute. In New York, when a builder sells a new home, the law adds a warranty of one year for poor workmanship, two years for plumbing, electrical, heating, cooling and ventilation systems, and six years for material defects, and you must give the builder written notice no later than 30 days after the warranty period ends[2]. That law does not cover ordinary remodeling, and a builder can replace it with a written limited warranty that meets the statute's standards.
Product warranties. If a product installed in your home fails, such as windows, shingles or an appliance, the federal Magnuson-Moss Warranty Act lets you sue the warrantor for damages, and a court may award attorney fees if you win[3]. It covers the product, not the contractor's labor by itself, and some written warranties require you to use the maker's dispute program first.
Consumer protection laws. In some states, refusing to honor a warranty can also be an unfair or deceptive practice. The Texas Deceptive Trade Practices Act lets a consumer who wins recover economic damages, court costs and reasonable attorney fees, with up to three times damages for knowing conduct, and generally requires written notice at least 60 days before suing[4]. Massachusetts requires a written demand at least 30 days before suing under its consumer protection law and awards reasonable attorney fees to a consumer who wins[5].
What courts have said
Texas shows why the warranty's exact wording matters. A homeowner hired a company to repair a foundation under a contract with a written lifetime warranty. The Texas Supreme Court held that the implied warranty of good and workmanlike repair only fills gaps, so when the contract itself describes how the work will be done or its quality, the written terms control[6]. The homeowner there recovered nothing, because the jury found no breach of the written warranty and the other claim was filed too late.
Massachusetts shows that a warranty fight can be more than a contract case. An owner hired a roofer to reshingle a duplex, the roof proved defective, and the roofer offered only minor fixes. The state's highest court held that consumer protection relief is available in addition to contract and warranty claims, and that a material breach of warranty could support that claim with an award of attorney fees[7]. The owner rented the property out and did not get double or triple damages, because the breach was negligent rather than willful.
These cases come from specific states. Courts elsewhere may reach different results, so treat them as examples of how judges think about warranties, not as rules for your state.
How it works in your state
Several states make you give the contractor written notice and a chance to inspect or repair before you can sue over construction defects. In Florida, you must serve a written notice of claim at least 60 days before filing a defect suit, and the contractor then has 45 days to respond[8]. In Texas, you must send written notice by certified mail at least 60 days before suing, and the contractor gets a chance to inspect and make a settlement offer[9]. Our page on notice-and-repair laws explains how these rules work and where they apply.
Licensing boards can also help. In Arizona, a complaint that a contractor failed to work in a professional and workmanlike manner can trigger an investigation by the Registrar of Contractors, which can suspend or revoke a license[10]. Board discipline is not the same as getting paid, but a complaint sometimes prompts a contractor to respond to a stalled warranty claim.
Pick your state below to see your licensing board, any homeowner recovery fund and your small claims limit.
Mistakes that hurt your case
Most lost warranty claims are lost on paperwork and timing, not on the defect itself. Watch for these:
- Reporting the problem only by phone, with no written record.
- Hiring someone else to fix it before the original contractor had the chance that the warranty or your state's law requires.
- Letting the warranty period or your filing deadline pass while you wait on promised repairs. See how long you have to sue.
- Ignoring a written repair or settlement offer in a state where turning down a reasonable offer can limit what you recover.
- Throwing out the contract, the warranty certificate or the product labels.
Your state's rules, with sources
Pick your state to see the rules that matter here, each linked to its official source.
What to gather
Tick things off as you collect them. Your list stays on this device only.
What to do, step by step
- 1
Read the warranty and contract
Find what is covered, for how long, how you must make a claim, and any exclusions or required dispute program. Write down every deadline.
- 2
Send a written warranty claim
Describe each defect, where it is and when you noticed it, and ask for repair by a specific date. Send it in a way you can prove, such as certified mail with return receipt.
- 3
Follow your state's notice rules
If your state has a notice-and-repair law, follow its steps and timelines before you file anything, and allow the inspection it requires.
- 4
Get independent repair estimates
Have one or two other licensed contractors inspect and give written estimates. For serious or hidden defects, consider an expert's written report.
- 5
Send a final demand letter
If the contractor still refuses, send a demand letter with the repair cost and a firm deadline. OwnersBack Dispute Prep can organize your records into a dated timeline, an evidence index and a demand letter you send in your own name.
- 6
File complaints and product claims
File a complaint with your state licensing board, and make a written claim with the manufacturer for any failed product.
- 7
Sue if you need to
If the repair cost fits your state's limit, small claims court is often the fastest route. Larger claims usually belong in regular civil court.
When to talk to a lawyer now
- The defect is structural, lets water in, or could make the home unsafe.
- Your warranty period or filing deadline is close.
- The contractor made a written settlement offer and you are not sure whether to accept it.
- The repair cost is well above your state's small claims limit.
- The contractor says the warranty is void because of something you did.
Turn this into a plan you can act on
We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.
Hiring someone new to finish the job? Check their bid for free before you sign.
Common follow-up questions
Does the warranty still count if the contractor's company closed?
A warranty is the company's promise, so if the company is gone, collecting gets harder. You may still have options against a bond, a homeowner recovery fund in some states, or the manufacturer for product defects. See our page on a contractor who went out of business.
What if my contractor never gave me a written warranty?
Many states imply a promise that work will be done in a good and workmanlike manner, even with nothing in writing. Texas, for example, recognizes this for repair and remodel work[1]. How long it lasts and what it covers vary by state.
Can the contractor void my warranty because I hired someone else to fix it?
Some warranties say outside repairs end coverage, and some state laws require you to give the contractor a chance to repair first. Unless it is a true emergency, send written notice and allow a reasonable chance to repair before you bring in someone else. If you had to act fast, document why.
Is a lifetime warranty really for life?
It depends on the wording. Many lifetime warranties have conditions or a narrow definition of what is covered. The Texas Supreme Court held that when a contract spells out the quality of the work, those written terms control over the broader implied warranty[6].
Who do I go after if the shingles or windows themselves are defective?
The manufacturer usually warrants the product, and the contractor warrants the installation. Under the federal Magnuson-Moss Warranty Act, you can sue the product's warrantor when a covered product fails[3]. Ask both in writing and let their answers guide your next step.
Laws and cases on this page
Each one was read on its source and checked on November 19, 2026.
- 1
Court decision · TX · Supreme Court of Texas
Melody Home Manufacturing Co. v. Barnes, 741 S.W.2d 349 (Tex. 1987)
What it says
The Texas Supreme Court held that when someone is hired to repair or modify existing property, the law implies a promise that the work will be done in a 'good and workmanlike manner,' and consumers can sue for breach of it under the Texas Deceptive Trade Practices Act. It defined good and workmanlike as the quality of work of someone with the needed knowledge, training or experience, done in a way people able to judge such work would consider proficient.
Keep in mind: Texas case decided under the Texas Deceptive Trade Practices Act. The opinion said this warranty may not be waived or disclaimed, but in Gonzales v. Southwest Olshan Foundation Repair Co. (2013) the Texas Supreme Court held it can be superseded when the contract itself spells out how the work will be done or its quality. Other states may differ.
- 2
Statute · NY
N.Y. Gen. Bus. Law § 777-a
What it says
When a builder sells a new home in New York, the law adds a warranty to the sale: one year for poor workmanship, two years for plumbing, electrical, heating, cooling and ventilation systems, and six years for material defects. You must give the builder written notice of the claim no later than 30 days after the warranty period ends and let them inspect and repair.
Keep in mind: This covers the sale of a new home by a builder, not ordinary remodeling. Under § 777-b a builder can replace this implied warranty with a written limited warranty that meets the statute's standards, so read your purchase contract.
- 3
Statute · Federal
Magnuson-Moss Warranty Act, 15 U.S.C. § 2310(d)
What it says
If a product with a written or implied warranty fails, such as windows, shingles or an appliance installed in your home, you can sue the warrantor for damages, and if you win the court may award your costs including attorney fees based on actual time spent.
Keep in mind: The Act covers consumer products, including products installed in a home, not the contractor's labor or services by themselves. If the written warranty requires you to use the warrantor's informal dispute program first, you generally must use it before suing (15 U.S.C. § 2310(a)(3)). A case in federal court needs at least $50,000 in controversy across all claims (and each claim at least $25); smaller claims go to state court. The court can deny fees if it finds them inappropriate.
- 4
Statute · TX
Tex. Bus. & Com. Code § 17.50 (Deceptive Trade Practices Act)
What it says
Under the Texas Deceptive Trade Practices Act, a consumer harmed by deceptive conduct can recover economic damages, and up to three times those damages plus mental anguish damages if the conduct was knowing. A consumer who wins is awarded court costs and reasonable attorney fees, and you generally must give written notice at least 60 days before suing.
Keep in mind: Texas only. The 60-day notice rule is in § 17.505, not § 17.50. For residential construction defects, Texas Property Code chapter 27 controls wherever it conflicts with the DTPA (§ 17.44(b)), and it has its own notice and inspection steps. The Act has exemptions (§ 17.49), for example for professional advice, so check that your claim fits; the large-contract exemptions do not apply to claims about your own residence.
- 5
Statute · MA
Mass. Gen. Laws ch. 93A, § 9
What it says
Under the Massachusetts consumer protection law, you must send a written demand for relief at least 30 days before suing over an unfair or deceptive practice. If you win you get your actual damages or $25, whichever is more, the court can award two to three times that amount for willful or knowing violations or a bad-faith refusal to settle, and you recover reasonable attorney fees.
Keep in mind: Massachusetts only. The 30-day demand is not required for a counterclaim or cross-claim, or if the contractor has no place of business and keeps no assets in Massachusetts. If the contractor makes a reasonable written settlement offer within 30 days and you reject it, your recovery can be limited to that offer and fees after the rejection may not be recovered.
- 6
Court decision · TX · Supreme Court of Texas
Gonzales v. Southwest Olshan Foundation Repair Co., 400 S.W.3d 52 (Tex. 2013)
What it says
A homeowner hired a company to repair the home's foundation under a contract with a written lifetime warranty. The Texas Supreme Court held that the implied warranty of good and workmanlike repair only fills gaps: when the contract itself describes how the work will be done or its quality, the written terms control instead.
Keep in mind: Texas case. The homeowner ended up recovering nothing because the jury found no breach of the express warranty and the remaining claim was filed too late. It shows why reading your written warranty and acting quickly matter. Other states may differ.
- 7
Court decision · MA · Massachusetts Supreme Judicial Court
Linthicum v. Archambault, 379 Mass. 381 (1979)
What it says
An owner hired a roofer to reshingle a duplex, the roof proved defective, and the roofer offered only minor fixes. The Massachusetts Supreme Judicial Court held that relief under the state's consumer protection law, Chapter 93A, is available in addition to ordinary contract and warranty claims, and that a material breach of warranty could support a 93A claim with an award of attorney fees.
Keep in mind: Massachusetts case. The owner rented out the property, so the court treated the owner as a business claimant under section 11 rather than a consumer under section 9. Because the breach was negligent, not willful, the owner did not get double or triple damages. Other states may differ.
- 8
Statute · FL
Fla. Stat. § 558.004
What it says
Before suing a Florida contractor over construction defects, you must serve a written notice of claim at least 60 days before filing, describing each defect and where it is. The contractor then has 45 days to respond, for example with an offer to repair or pay.
Keep in mind: Florida only, and only for construction defect claims. Larger condo or homeowner association claims have longer periods (120 days). If you sue without responding to a timely settlement offer, the court can pause your case.
- 9
Statute · TX
Tex. Prop. Code § 27.004
What it says
Under the Texas Residential Construction Liability Act, you must send the contractor written notice of the defects by certified mail, return receipt requested, at least 60 days before suing. The contractor gets a chance to inspect within 35 days and may make a written settlement offer within 60 days of your notice.
Keep in mind: Texas only, for residential construction defects. If you skip the notice or inspection steps, the case can be abated (paused). Notice is excused if you must sue sooner to beat the statute of limitations or are raising the defect as a counterclaim. If you reject a reasonable settlement offer, your recovery is capped at the value of the contractor's last offer plus costs and attorney fees incurred before you rejected it. The damages you can recover are limited to the items the statute lists, such as reasonable repair costs.
- 10
Statute · AZ
Ariz. Rev. Stat. § 32-1154
What it says
In Arizona, the Registrar of Contractors can suspend or revoke a license for abandoning a contract without legal excuse, for departing from plans or specifications in a material way without the owner's consent, and for materially violating building codes. A complaint that a contractor failed to work in a professional and workmanlike manner can trigger an investigation.
Keep in mind: This section is about license discipline by the state, not a private lawsuit for money. The Registrar can suspend or revoke a license and, for some violations, impose civil penalties. Deadlines for filing a complaint are not in this section, so check the Registrar's complaint rules (A.R.S. § 32-1155) before relying on it.
Read next
Legal information, not legal advice
This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.