My contractor went out of business in the middle of my job

The short answer

Your odds: Depends on the facts

Sometimes. When a contracting company closes in the middle of your job, your claim against it can be hard to collect, but closing does not erase it. Your most realistic sources of money are often the contractor's bond, a state recovery fund, a credit card dispute, or the owner personally if they took part in wrongdoing or moved assets to dodge debts.

Steps to take
7
Laws and cases cited
20
Last checked

What to know

  • A company going out of business does not cancel what it owes you, but collecting from an empty company is hard.
  • Owners are usually shielded by their company, except in limited cases such as their own deceptive conduct or moving assets to escape debts.
  • Bonds and state recovery funds are often the most realistic source of money, and many require a court judgment first.
  • Act quickly, because bond, fund and card dispute deadlines keep running after the company closes.
On this page
  1. Do you have a case?
  2. Where the money can come from
  3. State recovery funds
  4. Can you go after the owner personally?
  5. Your state's rules, with sources
  6. What to gather
  7. What to do, step by step
  8. When to talk to a lawyer now
  9. Common follow-up questions
  10. Laws and cases on this page

The law, in detailTap a topic to open it.

Do you have a case?

If the company took your money and stopped work because it shut down, it very likely breached your contract. Closing a business is not a legal excuse for leaving your job unfinished. The hard part is usually not proving the claim. It is finding someone, or something, that can pay.

Start by figuring out what actually happened. Did the company file bankruptcy, simply stop operating, or close and reopen under a new name? Each one points to a different path. If there is a bankruptcy filing, an automatic stay generally stops lawsuits and collection against whoever filed[1], so read what to do when your contractor files bankruptcy before you take any collection step.

  • Look up the company's status with your state's business registry
  • Check the contractor's license, bond and insurance status with the licensing board
  • Search federal bankruptcy court records for both the company name and the owner's name
  • Note whether the same people are now working under a different business name

Where the money can come from

The bond. Many states require contractors to carry a surety bond that homeowners can claim against. In Oregon, for example, a residential general contractor must carry a $25,000 bond and a residential specialty contractor a $20,000 bond, and homeowners can be paid from it only after a timely board complaint and, if that doesn't settle it, a court judgment the contractor doesn't pay[2][3]. In California, every active contractor license must have a $25,000 bond on file[4], and if the license was revoked, you have up to two years from the license's original expiration date to act on the bond[5]. Bonds are limited and shared among claimants, so a contractor who leaves many jobs unfinished can use one up quickly. File early.

Your credit card. If you paid by credit card, you can dispute a charge in writing for work or materials not delivered as agreed, but the letter must reach the card issuer within 60 days after it sent the statement showing the charge[6]. After that window, you may still be able to withhold any unpaid part of the charge from the card issuer for bad or unfinished work, if you first tried in good faith to resolve it with the contractor[7].

State recovery funds

Several states run funds that pay homeowners when a licensed or registered contractor will not or cannot. That makes them a natural fit when a company closes. Most require a court judgment first, proof that you tried to collect, and a claim filed within a set time. Caps are usually per claim and per contractor, so many victims of the same company may share a limited amount.

These are examples, not a full list. Pick your state below to see whether it has a fund, what it pays and where to apply.

  • Arizona: the Residential Contractors' Recovery Fund can pay eligible owners who live in the home[8], up to $30,000 in actual damages after a judgment and a bond claim[9].
  • Connecticut: the Home Improvement Guaranty Fund can pay up to $25,000 toward an unpaid judgment against a registered contractor, and you must apply within two years after the judgment[10].
  • Maryland: the Home Improvement Guaranty Fund can pay up to $30,000 per claimant for one licensed contractor, never more than you paid, and you must file within 3 years after you discovered, or should have discovered, the loss[11].
  • Minnesota: the Contractor Recovery Fund can pay an owner up to $100,000 per licensee, limited to actual out-of-pocket loss, with a final judgment for things like failure of performance[12].
  • Washington: the Homeowner Recovery Fund can pay up to $25,000, depending on available funds, after a judgment and an attempt to collect from the bond, and you must apply within 90 days after the court case ends[13].

Can you go after the owner personally?

Usually the company, not the owner, owes you. That is the point of an LLC or corporation. But there are exceptions. In Washington, a roofing company took a payment, tore off part of a house, never finished and went bankrupt. The state Supreme Court held its president personally liable under the state Consumer Protection Act because he personally took part in the unfair conduct, without piercing the corporate veil[14].

Courts can also set the company aside and hold the owner responsible, called piercing the corporate veil, when the owner and company are not really separate and letting the owner hide behind it would be unfair. A leading California case lists what courts look for, but the claimant there lost, and veil piercing is hard to win[15]. See suing the contractor personally.

If the owner moved company money or equipment to relatives or a new company to dodge debts, a fraudulent transfer claim may undo it. Florida's version lets a creditor undo a transfer made with intent to hinder, delay or defraud creditors, and courts look for warning signs such as transfers to insiders or transfers made after a lawsuit was threatened[16]. Most states have a similar law, with different deadlines.

A new company is not automatically liable for the old one's debts. Courts recognize exceptions, such as a buyer that is a 'mere continuation' of the seller or assets moved to escape debts[17]. But in a case about a family business continued after the owner died, the Illinois Supreme Court held that running the same kind of business under the same name was not enough[18]. If your contractor reopened, read what to do when a contractor reopens under a new name.

Your state's rules, with sources

Pick your state to see the rules that matter here, each linked to its official source.

What to gather

Tick things off as you collect them. Your list stays on this device only.

0 of 8 gathered

What to do, step by step

  1. 1

    Confirm what happened to the company

    Check your state's business registry, the licensing board and federal bankruptcy records. If there is a bankruptcy filing, stop collection efforts and follow the bankruptcy rules instead.

  2. 2

    Dispute card charges right away

    If you paid by credit card, send a written billing-error dispute to the address your card issuer lists. The 60-day clock does not stop because the company closed.

  3. 3

    Send a written demand

    If no bankruptcy was filed, send a demand to the company's last address, its registered agent and the owner. OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name.

  4. 4

    File a bond claim and a licensing complaint

    Ask the licensing board for the bond information and file a complaint. Our guide to a claim against a contractor's bond explains how.

  5. 5

    Finish the job and track every cost

    Hire a new contractor with a written, itemized scope, and keep every bid and invoice. Those numbers become your damages.

  6. 6

    Get a judgment

    Most recovery funds need a court judgment. Small claims court may be enough for smaller losses. Name the company, and the individual who dealt with you where the facts support it.

  7. 7

    Apply to your state's recovery fund

    Once you have a judgment and have tried to collect, apply to the fund before its deadline. See how recovery funds work.

When to talk to a lawyer now

  • You think the owner moved money or equipment to a new company or to relatives
  • Your loss is larger than your small claims limit and the bond is small
  • A subcontractor or supplier the company did not pay has filed or threatened a lien on your home
  • You learn that the company or the owner has filed bankruptcy
Find a lawyer in your state

Turn this into a plan you can act on

We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.

Hiring someone new to finish the job? Check their bid for free before you sign.

Common follow-up questions

Can I sue a company that no longer exists?

Often, yes. In many states a closed company can still be sued, and a judgment against it is what most recovery funds need, even if the company itself has no money. The rules for suing a dissolved company vary by state.

Will the licensing board make the owner pay?

Boards can discipline a license and some can order restitution, but a board order is not the same as getting paid. Use a complaint alongside a bond or fund claim, not instead of one.

What if the contractor had no bond?

Then a recovery fund, a card dispute or a claim against the owner personally becomes more important. Some states have no recovery fund at all, so check the state panel below.

Do the company's unpaid subcontractors become my problem?

They can, because in many states unpaid subcontractors and suppliers can file liens even if you paid the contractor. Utah and Michigan have laws that protect owners who paid their contractor, under certain conditions[19][20]. See liens after you paid your contractor.

How long do I have to act?

It depends on the path. Washington's fund requires an application within 90 days after the court case ends[13], while Connecticut's allows two years after the judgment[10]. Check your state's deadlines today.

Laws and cases on this page

Each one was read on its source and checked on November 19, 2026.

  1. 1

    Statute · Federal

    Bankruptcy Code, 11 U.S.C. § 362(a) (automatic stay)

    What it says

    Once a contractor files bankruptcy, an automatic stay generally stops you from starting or continuing a lawsuit against them or trying to collect a debt that arose before the filing. You can ask the bankruptcy court to lift the stay for cause.

    Keep in mind: The stay protects the debtor who filed. Whether it reaches a separate company, owner or bond depends on the facts, so check before you act.

  2. 2

    Statute · OR

    Or. Rev. Stat. § 701.081

    What it says

    In Oregon, a residential general contractor must carry a $25,000 surety bond, a residential specialty contractor $20,000, a residential limited contractor $15,000 and a residential developer $25,000. Locksmith, home inspector services, home services, home energy performance score and residential restoration contractors carry $15,000. A homeowner can be paid from that bond only through the Construction Contractors Board process in ORS 701.145, which requires a final court judgment if the dispute is not settled.

    Keep in mind: The bond is the most the surety will ever pay on all complaints combined, no matter how many years it is in force (ORS 701.068), so several claimants may have to share it. The board can require some contractors to carry a bond up to five times larger. The bond does not pay attorney fees, and costs plus interest paid from a residential bond are capped at $5,000 in total.

  3. 3

    Statute · OR

    Or. Rev. Stat. § 701.145

    What it says

    For work on a home, you file a complaint with Oregon's Construction Contractors Board, which tries to mediate the dispute. If you do not settle, you can be paid from the contractor's bond only by getting a final court judgment, or an arbitration award that a court has turned into a judgment. If the contractor does not pay that judgment, the board tells the bond company how much it must pay you (ORS 701.150).

    Keep in mind: You still must file the board complaint on time: first mail the contractor a notice by certified mail at least 30 days before filing (ORS 701.133), and for work on an existing home the board must receive the complaint within one year after the work was substantially completed (ORS 701.143). The board's payment order may not include attorney fees. The board itself says payout takes at least 60 days after it receives a certified copy of the judgment; that waiting period is not in the statute.

  4. 4

    Official guidance · CA

    CSLB, Bond Requirements (Cal. Bus. & Prof. Code § 7071.6)

    What it says

    Every active California contractor license must have a $25,000 contractor's bond on file, as required by Business and Professions Code section 7071.6. The licensing board says the bond is for consumers harmed by defective construction or other license law violations, and for workers who were not paid their wages.

    Keep in mind: The official California code site (leginfo.legislature.ca.gov) would not load when this was checked, so this entry relies on the licensing board's own page rather than the statute text. The $25,000 is the total bond amount; it is not a guarantee that every claim will be paid in full, and the bonding company decides claims. Unlicensed contractors have no bond.

  5. 5

    Official guidance · CA

    CSLB Fast Facts: A Guide to Contractor License Bonds

    What it says

    California's licensing board explains that if a licensed contractor broke state license laws on your home improvement or new single-family home and you were harmed, you may file a claim against the contractor's $25,000 license bond. If the license was revoked, you have up to two years from the license's original expiration date to act.

    Keep in mind: This is a board guide, not the statute. The bonding company investigates and decides whether to pay, and the bond is limited to $25,000. If the contractor posted a cashier's check instead of a surety bond, you generally need a court order to be paid from it.

  6. 6

    Statute · Federal

    Fair Credit Billing Act, 15 U.S.C. § 1666 (billing errors)

    What it says

    If you paid a contractor by credit card for work or materials that were not delivered as agreed, you can dispute the charge as a billing error in writing. Your letter must reach the card issuer, at the address it lists for billing errors, within 60 days after it sent the statement showing the charge. The issuer must acknowledge within 30 days and resolve it within two billing cycles, and no later than 90 days.

    Keep in mind: Applies to credit card and other open-end consumer credit accounts, not cash, checks or wire transfers. The 60 days count from when the statement was sent, and a note on the payment stub does not count unless the issuer agrees, so mail early and keep proof of delivery. Phone calls alone do not trigger these protections.

  7. 7

    Statute · Federal

    Fair Credit Billing Act, 15 U.S.C. § 1666i (claims and defenses against card issuer)

    What it says

    If a contractor you paid by credit card does bad or unfinished work, you may be able to refuse to pay the card issuer for that charge, raising the same complaints you have against the contractor. You must first make a good faith attempt to resolve it with the contractor.

    Keep in mind: The charge must be over $50 and made in your home state or within 100 miles of your mailing address (these two limits do not apply in some cases, such as when the card issuer itself sold or controls the seller). It does not cover tort claims, and you can only withhold up to the amount of that charge still unpaid when you first notify the issuer or contractor. It covers credit cards (open-end consumer credit), not debit cards.

  8. 8

    Statute · AZ

    Ariz. Rev. Stat. § 32-1132

    What it says

    Arizona's Residential Contractors' Recovery Fund can pay homeowners hurt by a licensed residential contractor's violation of the contractor licensing law. Eligible claimants include individual owners who occupy, or intend to occupy, the home as their primary residence, plus certain LLCs, revocable living trusts, associations and lessees.

    Keep in mind: Only claimants on the statute's list qualify, so rental or investment property owners who do not live there are generally left out. The contractor must have held a valid, active license on the date the contract was signed, the first payment was made or work began. Dollar caps are in a separate section (A.R.S. § 32-1136).

  9. 9

    Statute · AZ

    Ariz. Rev. Stat. § 32-1136

    What it says

    Arizona's recovery fund pays your actual damages, minus anything you recovered from other sources, up to $30,000. An action that may lead to a fund payment must be started no later than two years from the contractor's act that caused the injury or from the date of occupancy.

    Keep in mind: Only eligible claimants under A.R.S. § 32-1132 qualify. You need a final judgment against a residential contractor, written notice to the Registrar of Contractors when you start the case and at least 20 days before asking for payment, and you must first go after any contractor bond and show you know of no other assets to pay the judgment. A contractor's spouse cannot recover.

  10. 10

    Official guidance · CT

    Connecticut Home Improvement Guaranty Fund (Conn. Gen. Stat. ch. 400)

    What it says

    Connecticut's Home Improvement Guaranty Fund can pay a homeowner up to $25,000 toward an unpaid court judgment (or court-confirmed arbitration decision) against a home improvement contractor. The contractor must have been registered with the Department of Consumer Protection, and you must apply within two years after the judgment.

    Keep in mind: Connecticut only. The job must be on a residential property of six units or less, cost more than $200 and not be new home construction. For Superior or Federal Court judgments you must first try collecting with a marshal; small claims judgments skip that step.

  11. 11

    Statute · MD

    Md. Code, Bus. Reg. § 8-405

    What it says

    Maryland's Home Improvement Guaranty Fund can pay a homeowner for an actual loss caused by a licensed contractor, up to $30,000 per claimant for one contractor and never more than you paid that contractor. You must file within 3 years after you discovered, or should have discovered, the loss.

    Keep in mind: Maryland only, for licensed contractors. You must live in the home or own no more than three residences, and certain relatives, employees, officers and partners of the contractor cannot claim. The fund does not pay attorney fees, court costs, interest, consequential, personal injury or punitive damages. Total awards for one contractor are capped at $250,000 across all claimants unless the contractor repays the fund, and you may have to arbitrate first if your contract requires it.

  12. 12

    Statute · MN

    Minn. Stat. § 326B.89

    What it says

    Minnesota's Contractor Recovery Fund can pay an owner or lessee of a one-to-four family home who contracted directly with a licensed residential contractor or remodeler and holds a final judgment for fraud, deception, dishonest practices, conversion of funds or failure of performance. Payment is up to $100,000 per licensee for an owner, limited to actual out-of-pocket loss, and you must apply within two years after the judgment becomes final.

    Keep in mind: Minnesota only, for licensed residential contractors. Attorney fees, litigation costs and interest are not paid, and all owners together are capped at $550,000 per licensee.

  13. 13

    Official guidance · WA

    Washington Dept. of Labor & Industries, Homeowner Recovery Fund

    What it says

    Washington has a Homeowner Recovery Fund that can pay up to $25,000, depending on available funds and other factors, to homeowners who owned and lived in the home and used a registered contractor. You must first get a final court judgment against the contractor and try to collect from the bond, then apply within 90 days after the court case ends.

    Keep in mind: This is an agency handout. Payment is not guaranteed and depends on available funds; the contractor must have been registered with L&I.

  14. 14

    Court decision · WA · Washington Supreme Court

    Grayson v. Nordic Construction Co., 92 Wn.2d 548, 599 P.2d 1271 (1979)

    What it says

    A roofing company took a payment, tore off part of a house, never finished, and later went bankrupt. The Washington Supreme Court held the company's president personally liable because he took part in the company's unfair and deceptive conduct under the state Consumer Protection Act, even though the court did not pierce the corporate veil.

    Keep in mind: Washington Supreme Court case under Washington's Consumer Protection Act. The officer must have personally participated in or knowingly approved the wrongful conduct. Other states have different rules on officer liability.

  15. 15

    Court decision · CA · California Court of Appeal, First District

    Associated Vendors, Inc. v. Oakland Meat Co., 210 Cal. App. 2d 825 (1962)

    What it says

    A court can ignore a company's separate existence and hold the owner personally responsible ("piercing the corporate veil" or "alter ego") when the owner and the company are not really separate and letting the owner hide behind the company would be unfair. This is a leading California case that lists the two things a court looks for.

    Keep in mind: California Court of Appeal case about a meat business, not a construction job. In this case the court affirmed the trial court's refusal to disregard the corporation, so the alter ego claim lost; the case is cited for the test, not as a win. Veil piercing is hard to win and depends on many facts, such as mixing personal and company money or using the company as a shell. Other states use similar but not identical tests.

  16. 16

    Statute · FL

    Fla. Stat. § 726.105

    What it says

    Florida law lets a creditor (including a homeowner with a claim or judgment) undo a transfer made with intent to hinder, delay, or defraud creditors. Courts look at warning signs such as transfers to insiders like relatives, transfers made after the debtor was sued or threatened with suit, transfers of nearly all assets, and hidden assets.

    Keep in mind: Florida statute (part of Florida's Uniform Fraudulent Transfer Act). Deadlines are short: a claim based on actual intent generally must be brought within 4 years after the transfer or, if later, within 1 year after it was or reasonably could have been discovered (§ 726.110). Most states have a similar law, often called the Uniform Voidable Transactions Act, but section numbers, deadlines and details differ.

  17. 17

    Court decision · CA · Supreme Court of California

    Ray v. Alad Corp., 19 Cal. 3d 22 (1977)

    What it says

    Normally a company that buys another company's assets does not inherit its debts. The California Supreme Court restated the four traditional exceptions: the buyer agreed to take on the debts, the deal was really a merger, the buyer is a "mere continuation" of the seller, or the assets were moved to escape the seller's debts. In this case none of the four applied; the injured plaintiff won only under a new "product line" rule for a buyer that keeps making the seller's product line.

    Keep in mind: California Supreme Court case about a defective ladder (strict product liability), not a construction dispute. The product line rule is tied to a successor that keeps making the predecessor's products, so it is unlikely to help in a contractor dispute. The four traditional exceptions are widely used, but each state applies them its own way.

  18. 18

    Court decision · IL · Supreme Court of Illinois

    Vernon v. Schuster, 179 Ill. 2d 338, 688 N.E.2d 1172 (1997)

    What it says

    Homeowners who had paid a heating business for a boiler and warranty tried to hold the owner's son responsible after he took over the same business under the same name. The Illinois Supreme Court said no: the "mere continuation" rule looks at whether the same owners continue the same company, not just whether the same kind of business keeps running.

    Keep in mind: Illinois Supreme Court case involving sole proprietorships after the owner died, not a contractor who closed a company on purpose. It shows that simply reopening under a relative's name does not automatically make the new business liable; a fraud or fraudulent transfer claim may be needed instead. Other states may differ.

  19. 19

    Statute · UT

    Utah Code § 38-11-107 (with § 38-11-204(4))

    What it says

    In Utah, if you signed a written contract with a licensed contractor for work on your owner-occupied home and paid that contractor in full under the contract, subcontractors and suppliers who were not paid by the contractor generally cannot keep a lien on your home. They must look to the contractor or the state Residence Lien Recovery Fund instead.

    Keep in mind: Utah law only, for owner-occupied residences. Section 38-11-107 was last amended in 2012 and section 38-11-204 in 2017 per the official page. Most other states do not protect owners this way, and some have their own recovery funds with different rules.

  20. 20

    Statute · MI

    Mich. Comp. Laws § 570.1203

    What it says

    In Michigan, if you paid your contractor under the contract, a subcontractor's or supplier's construction lien does not attach to your home to the extent of what you paid. You raise this by filing an affidavit with proof of payment, and the unpaid subcontractor or supplier may instead seek payment from the Homeowner Construction Lien Recovery Fund.

    Keep in mind: Michigan only, for residential structures. You must not have colluded to get money from the fund and must cooperate in defending it. It protects you only for amounts you actually paid.

Legal information, not legal advice

This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.