The short answer
Your odds: Often a good claimOften, yes. A new roof that leaks usually points to an installation problem, a defective product, or both, and when the roofer's work is the cause, you can often hold the roofer responsible for fixing it or paying for the repair. Report the leak in writing right away, and read both the roofer's workmanship warranty and the shingle maker's warranty, because each has its own rules and deadlines.
What to know
- A leak in a new roof is often an installation defect, which falls on the roofer under your contract and any workmanship warranty.
- Shingles and other roofing products usually carry a separate manufacturer's warranty with its own claim process.
- Report the leak in writing quickly and stop further water damage, because delay can hurt both your claim and your house.
- Some states require written notice and a chance to inspect before you can sue.
On this page
- Do you have a case?
- Roofer's warranty or manufacturer's warranty?
- The legal claims that usually apply
- How it works in your state
- Mistakes that hurt your case
- Your state's rules, with sources
- What to gather
- What to do, step by step
- When to talk to a lawyer now
- Common follow-up questions
- Laws and cases on this page
The law, in detailTap a topic to open it.
Do you have a case?
A properly installed new roof should not leak. When it does, the cause is usually the installation (flashing, valleys, vents, nailing or underlayment), the product, or damage from something else, such as a storm or another trade working on the roof. You usually have a claim against the roofer if the leak traces back to the roofer's work, you reported it promptly, and the roofer did not fix it. A leak that shows up in the first heavy rain after the job is a classic sign of an installation problem, though only an inspection can confirm it.
Have the cause identified by someone independent, such as another licensed roofer or a home inspector, especially if the roofer blames the shingles, the weather or your gutters. Photos and video from the attic during rain are often the most convincing evidence you can collect.
- The roof is new, or was recently repaired by this roofer
- The leak traces to the installation, not a separate storm event
- You reported it in writing and gave the roofer a chance to fix it
- The roofer refused, failed to fix it, or the fix did not hold
Roofer's warranty or manufacturer's warranty?
Most new roofs come with two different promises. The roofer's workmanship warranty covers how the roof was installed. The manufacturer's product warranty covers the shingles or other materials. Many leaks are installation problems, and product warranties often exclude damage from improper installation, so the roofer is usually your first stop.
If the product itself failed, federal law lets you sue the warrantor of a consumer product with a written or implied warranty, such as shingles installed in your home, and the court may award attorney fees if you win[1]. That law covers products, not the roofer's labor by itself, and if the warranty requires an informal dispute program first, you generally must use it. Read what to do when a warranty is not honored.
Read every written warranty closely. The Texas Supreme Court held that when a contract spells out how work will be done or its quality, those written terms control instead of the implied warranty of good and workmanlike work. In that case, a homeowner with a lifetime warranty on foundation repairs recovered nothing, partly because a claim was filed too late[2].
The legal claims that usually apply
Breach of contract and breach of the implied warranty of workmanlike performance are the main claims against the roofer. In Texas, the law implies that repair or modification work will be done in a good and workmanlike manner, meaning the quality of someone with the needed knowledge, training or experience[3]. If your contract names specific materials or methods, such as a particular underlayment or flashing detail, failing to follow them is also a plain breach of contract, and your inspector can check for it.
Consumer protection laws can add leverage. In a Massachusetts case, an owner hired a roofer to reshingle a duplex, the roof proved defective, and the roofer offered only minor fixes. The state's highest court held that consumer protection relief is available on top of contract and warranty claims, and that a material breach of warranty could support an award of attorney fees. The owner rented out the property and was treated as a business, and because the breach was negligent rather than willful, there were no multiplied damages[4].
If you paid by credit card, you may be able to raise the defective roof against the card issuer for any unpaid part of the charge, after first trying in good faith to resolve it with the roofer[5]. If a roofer who came after a storm took your insurance money and did poor work, see storm-chaser roofers.
How it works in your state
Some states make you give written notice and a chance to inspect before suing. In Texas, the notice goes by certified mail at least 60 days before suing, and the contractor may inspect and make a settlement offer[6]. In Florida, you must serve a written notice of claim at least 60 days before filing, describing each defect and where it is[7].
Roofer licensing varies widely. Some states license roofers through the same board as other contractors, some register them separately, and some leave it to cities and counties. Colorado, for example, does not license roofers statewide, but it requires a written residential roofing contract that names the roofer's surety and liability insurer, while Kansas requires roofers to register with the state Attorney General. Pick your state below to see who licenses roofers, how to complain and whether a bond or recovery fund can help.
Mistakes that hurt your case
A leaking roof is an emergency for your house, not just your case. Protect the house first, but in a way that keeps your evidence.
- Letting water keep coming in instead of arranging a tarp or emergency patch, which can make the extra damage harder to recover
- Having another roofer tear off sections before the cause is photographed and documented
- Reporting the leak only by phone, with nothing in writing
- Skipping the claim steps or deadlines in the roofer's or manufacturer's warranty
- Climbing onto the roof yourself to take photos; leave that to a professional
Your state's rules, with sources
Pick your state to see the rules that matter here, each linked to its official source.
What to gather
Tick things off as you collect them. Your list stays on this device only.
What to do, step by step
- 1
Stop the water
Catch the water, move belongings, and have a professional tarp or patch the area if needed. Keep every receipt.
- 2
Document the leak
Photograph and video the leak, stains and attic during rain, with dates. Note each time it leaks and the weather that day.
- 3
Notify the roofer in writing
Email and mail a written report that asks for an inspection and repair by a set date, following any steps your warranty or your state's notice law requires.
- 4
File a manufacturer warranty claim if the product may be at fault
If the shingles or materials look defective, follow the manufacturer's claim process and keep copies of everything you send.
- 5
Get an independent inspection
Have another licensed roofer or inspector identify the cause in writing and price the repair, including interior damage.
- 6
Send a demand
Demand the repair or its cost by a firm date. OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name.
- 7
Escalate if the roofer refuses
File a licensing complaint, look into the roofer's bond, and consider small claims or civil court. See what to do when a contractor won't fix mistakes.
When to talk to a lawyer now
- The leak has caused mold, rot in the roof structure or major interior damage
- The roofer and the manufacturer each blame the other
- The repair cost is more than your state's small claims limit
- Insurance money is involved, or your insurer has denied a claim tied to the roof
Turn this into a plan you can act on
We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.
Hiring someone new to finish the job? Check their bid for free before you sign.
Common follow-up questions
How long does a roofer's warranty last?
It depends entirely on the written warranty, which varies from roofer to roofer. Read it for the length, what it covers and how you must make a claim. The shingle maker's warranty is a separate document with its own terms.
Will my homeowners insurance pay for the interior damage?
Sometimes, depending on your policy and the cause of the leak. Policies often treat sudden water damage differently from faulty workmanship. See insurance and contractor damage.
The roofer says the leak is from a storm. How do I prove otherwise?
Get an independent roofer to identify the cause, and pull weather records for the dates the leaks started. Leaks at flashing, vents and valleys soon after installation often point to the work, but an expert opinion is what carries weight.
Can I make the roofer pay for my damaged ceiling too?
Often you can include interior damage caused by the leak, if it flows from the defective roofing work. Read when a contractor damages your house.
Do I have to let the same roofer fix it?
Your warranty may require it, and some states give the contractor a chance to inspect and offer a repair before you sue, as Texas does[6]. If repeated fixes fail, document each one and put your decision to use someone else in writing.
Laws and cases on this page
Each one was read on its source and checked on November 19, 2026.
- 1
Statute · Federal
Magnuson-Moss Warranty Act, 15 U.S.C. § 2310(d)
What it says
If a product with a written or implied warranty fails, such as windows, shingles or an appliance installed in your home, you can sue the warrantor for damages, and if you win the court may award your costs including attorney fees based on actual time spent.
Keep in mind: The Act covers consumer products, including products installed in a home, not the contractor's labor or services by themselves. If the written warranty requires you to use the warrantor's informal dispute program first, you generally must use it before suing (15 U.S.C. § 2310(a)(3)). A case in federal court needs at least $50,000 in controversy across all claims (and each claim at least $25); smaller claims go to state court. The court can deny fees if it finds them inappropriate.
- 2
Court decision · TX · Supreme Court of Texas
Gonzales v. Southwest Olshan Foundation Repair Co., 400 S.W.3d 52 (Tex. 2013)
What it says
A homeowner hired a company to repair the home's foundation under a contract with a written lifetime warranty. The Texas Supreme Court held that the implied warranty of good and workmanlike repair only fills gaps: when the contract itself describes how the work will be done or its quality, the written terms control instead.
Keep in mind: Texas case. The homeowner ended up recovering nothing because the jury found no breach of the express warranty and the remaining claim was filed too late. It shows why reading your written warranty and acting quickly matter. Other states may differ.
- 3
Court decision · TX · Supreme Court of Texas
Melody Home Manufacturing Co. v. Barnes, 741 S.W.2d 349 (Tex. 1987)
What it says
The Texas Supreme Court held that when someone is hired to repair or modify existing property, the law implies a promise that the work will be done in a 'good and workmanlike manner,' and consumers can sue for breach of it under the Texas Deceptive Trade Practices Act. It defined good and workmanlike as the quality of work of someone with the needed knowledge, training or experience, done in a way people able to judge such work would consider proficient.
Keep in mind: Texas case decided under the Texas Deceptive Trade Practices Act. The opinion said this warranty may not be waived or disclaimed, but in Gonzales v. Southwest Olshan Foundation Repair Co. (2013) the Texas Supreme Court held it can be superseded when the contract itself spells out how the work will be done or its quality. Other states may differ.
- 4
Court decision · MA · Massachusetts Supreme Judicial Court
Linthicum v. Archambault, 379 Mass. 381 (1979)
What it says
An owner hired a roofer to reshingle a duplex, the roof proved defective, and the roofer offered only minor fixes. The Massachusetts Supreme Judicial Court held that relief under the state's consumer protection law, Chapter 93A, is available in addition to ordinary contract and warranty claims, and that a material breach of warranty could support a 93A claim with an award of attorney fees.
Keep in mind: Massachusetts case. The owner rented out the property, so the court treated the owner as a business claimant under section 11 rather than a consumer under section 9. Because the breach was negligent, not willful, the owner did not get double or triple damages. Other states may differ.
- 5
Statute · Federal
Fair Credit Billing Act, 15 U.S.C. § 1666i (claims and defenses against card issuer)
What it says
If a contractor you paid by credit card does bad or unfinished work, you may be able to refuse to pay the card issuer for that charge, raising the same complaints you have against the contractor. You must first make a good faith attempt to resolve it with the contractor.
Keep in mind: The charge must be over $50 and made in your home state or within 100 miles of your mailing address (these two limits do not apply in some cases, such as when the card issuer itself sold or controls the seller). It does not cover tort claims, and you can only withhold up to the amount of that charge still unpaid when you first notify the issuer or contractor. It covers credit cards (open-end consumer credit), not debit cards.
- 6
Statute · TX
Tex. Prop. Code § 27.004
What it says
Under the Texas Residential Construction Liability Act, you must send the contractor written notice of the defects by certified mail, return receipt requested, at least 60 days before suing. The contractor gets a chance to inspect within 35 days and may make a written settlement offer within 60 days of your notice.
Keep in mind: Texas only, for residential construction defects. If you skip the notice or inspection steps, the case can be abated (paused). Notice is excused if you must sue sooner to beat the statute of limitations or are raising the defect as a counterclaim. If you reject a reasonable settlement offer, your recovery is capped at the value of the contractor's last offer plus costs and attorney fees incurred before you rejected it. The damages you can recover are limited to the items the statute lists, such as reasonable repair costs.
- 7
Statute · FL
Fla. Stat. § 558.004
What it says
Before suing a Florida contractor over construction defects, you must serve a written notice of claim at least 60 days before filing, describing each defect and where it is. The contractor then has 45 days to respond, for example with an offer to repair or pay.
Keep in mind: Florida only, and only for construction defect claims. Larger condo or homeowner association claims have longer periods (120 days). If you sue without responding to a timely settlement offer, the court can pause your case.
Read next
Legal information, not legal advice
This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.