The short answer
Your odds: Often a good claimUsually the contractor is responsible, and their liability insurance is often the first place to look. If careless work damaged other parts of your home, such as a nicked pipe flooding a floor or a dropped tool cracking a tub, you can usually hold the contractor responsible, and their liability insurer may handle the claim. Your own homeowners policy may also cover some sudden damage, but policies differ, so read yours before you decide which claim to file first.
What to know
- A contractor who damages your home through careless work is usually responsible for the repair cost.
- Contractor liability insurance often covers accidental damage to your property, but usually not the cost of redoing the contractor's own bad work.
- Your homeowners insurance may cover sudden damage, and your insurer may then seek repayment from the contractor.
- Report the damage to the contractor in writing right away and ask for their insurance information.
On this page
The law, in detailTap a topic to open it.
Do you have a case?
This page is about damage to your house beyond the work itself: water from a nicked pipe, a tub cracked by a dropped tool, gouged floors, a ceiling punched through from the attic, or scorch marks from a torch. That is different from the contractor's own work being poor, which is covered in suing for bad workmanship, although many jobs involve both.
You usually have a claim if the contractor or their crew caused the damage, they did not take reasonable care, and it costs money to repair. Many contracts also include a promise to protect your property or repair any damage the contractor causes. In many states, courts treat physical damage to other parts of your home differently from a defect alone. In California, for example, the state Supreme Court held that homeowners could not sue in negligence over new-home defects that had not yet caused damage, because the cost of fixing a defect that has not caused harm is purely economic loss[1]. That case was about new construction and a later statute changed the result for many new homes, but it shows why actual damage can matter.
- The contractor or someone working for them caused the damage
- It happened because of careless work, not normal wear or a problem that was already there
- You have photos or other proof of the condition before the work
- You have a repair estimate or invoice
Whose insurance pays?
The contractor's liability insurance. Many states require contractors to carry general liability insurance, and it is often the main source of payment for accidental damage to your home. Pennsylvania, for example, requires registered home improvement contractors to carry at least $50,000 of property damage insurance, and the state notes that this insurance does not cover poor workmanship. Washington requires contractors to carry at least $50,000 of property damage coverage. Ask the contractor in writing for the insurer's name and policy number, and ask them to report the claim.
Your homeowners insurance. Your own policy may cover sudden, accidental damage, like water pouring through a ceiling, even when a contractor caused it. If your insurer pays, it may try to recover what it paid from the contractor or their insurer. Policies often exclude faulty workmanship itself, and filing usually means paying your deductible. Read whether your homeowners insurance covers contractor damage.
Subcontractors. If a plumber or electrician hired by your general contractor caused the damage, both may be responsible, and each may have its own insurer. Put the general contractor on notice, since that is who you hired, and ask who was on site that day. Your contract may also say who must carry insurance for the subcontractors' work, so read it before you call anyone's insurer.
When the contractor has no insurance or won't cooperate
If the contractor has no insurance or refuses to report the claim, you still have a claim against the contractor directly. A bond may help where your state requires one. In Washington, a residential homeowner can sue on the contractor's bond for breach of contract, within two years from when the work was substantially completed or abandoned[2]. Oregon's Construction Contractors Board takes homeowner complaints for breach of contract or negligent or improper work against licensed contractors[3]. See what to do when your contractor had no insurance.
A credit card dispute may not help with this kind of claim. The federal rule that lets you raise a contractor's bad work against your card issuer does not cover tort claims, such as negligence[4]. Damage to your home is often a negligence claim, so plan on the contractor, their insurer or your own insurer instead.
Special cases
Lead dust in an older home. If your house was built before 1978, anyone paid to disturb painted surfaces generally must be certified and follow lead-safe work practices under the EPA's rule, and a contractor without that certification is a red flag and a possible violation[5]. You can ask the contractor for proof of its lead-safe firm certification[6]. If you think lead dust spread through your home, keep children and pets away from the area and ask your local health department about testing.
A worker hurt on your property raises different questions, covered in when a contractor's worker is hurt at your house. If it was your neighbor's contractor that damaged your home, see damage from a neighbor's contractor.
How it works in your state
Insurance and bond rules vary widely. Some states set specific liability limits for licensed contractors, some require a bond, and some require neither. Pick your state below to see your licensing board, the bond and insurance rules that apply, and your small claims limit. While you are on your licensing board's website, look up the contractor's license record, which in many states shows whether a bond or insurance is on file.
A licensing complaint can add pressure when a contractor ignores damage they caused. In California, the licensing board's discipline can include orders to make or pay for repairs, and it takes most complaints for up to four years from the act in question[7].
Your state's rules, with sources
Pick your state to see the rules that matter here, each linked to its official source.
What to gather
Tick things off as you collect them. Your list stays on this device only.
What to do, step by step
- 1
Stop further damage
Shut off water or power to the area if it is safe, and call for emergency drying or cleanup if needed. Keep every receipt.
- 2
Document it the same day
Photograph and video the damage from several angles, and write down when it happened, who was working and what they said.
- 3
Notify the contractor in writing
Describe the damage, ask them to report it to their liability insurer, and ask for the insurer's name, policy number and a certificate of insurance.
- 4
Read your homeowners policy
Check whether the damage is covered and what your deductible is. If the damage is serious, call your agent so a late report does not hurt your coverage.
- 5
Get independent repair estimates
Get written estimates from licensed contractors who did not cause the damage, itemized by room and type of repair.
- 6
Send a demand
Demand payment or repair by a firm date, with your photos and estimates attached. OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name.
- 7
Escalate if needed
File a licensing board complaint, look into a claim against the contractor's bond, and consider small claims court for smaller amounts.
When to talk to a lawyer now
- The damage is structural, involves fire, or is major water damage
- The contractor's insurer denied the claim, or the contractor has no insurance
- Your insurer and the contractor's insurer are pointing at each other
- Someone was injured, or you suspect lead or asbestos contamination
Turn this into a plan you can act on
We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.
Hiring someone new to finish the job? Check their bid for free before you sign.
Common follow-up questions
Should I claim on my homeowners insurance or the contractor's insurance?
Often the contractor's liability insurance first, since the contractor caused it. If the damage is serious and urgent, your own policy may pay faster, and your insurer may then pursue the contractor. Read your policy and ask about the deductible before you decide.
The contractor wants to just fix it themselves. Should I let them?
That can be fine for small, simple damage if you trust the work. For anything larger, get the plan in writing with a deadline, keep your photos, and do not sign a release until the repair is finished and checked.
Will the contractor's insurance pay to redo their bad work?
Usually not. Liability policies generally cover accidental damage to other property, not the cost of fixing the contractor's own work, and Pennsylvania's rules say its required coverage does not cover poor workmanship. Workmanship claims usually go against the contractor directly.
How do I get the contractor's insurance information?
Ask in writing for the insurer's name, the policy number and a certificate of insurance. Some states require insurance details on the contract or on file with the licensing board, so check those too.
What if a subcontractor caused the damage?
Notify both the general contractor and the subcontractor in writing. The general contractor you hired is usually your main target, and it can pursue its own subcontractor.
Laws and cases on this page
Each one was read on its source and checked on November 19, 2026.
- 1
Court decision · CA · Supreme Court of California
Aas v. Superior Court, 24 Cal. 4th 627 (2000)
What it says
Homeowners sued their builder in negligence for construction defects that had not yet caused property damage or injury. California's Supreme Court held they could not recover in negligence for those defects alone, because the cost of fixing a defect that has not caused harm is purely economic loss.
Keep in mind: California case about new-home construction. It barred only negligence (tort) claims for defects that had not caused damage; the homeowners' contract and warranty claims were not affected. It was later changed by statute in California: in McMillin Albany LLC v. Superior Court (2018), the California Supreme Court said the Right to Repair Act (Civil Code section 895 and following) effectively abrogated Aas for the new homes that Act covers. Other states treat this issue differently.
- 2
Statute · WA
Wash. Rev. Code § 18.27.040
What it says
Washington contractors must post a bond of $30,000 (general contractors) or $15,000 (specialty contractors). A residential homeowner can sue on the bond for breach of contract, but must start that action within two years from when the work was substantially completed or abandoned, and the winning side in such a case can recover costs, interest and reasonable attorneys' fees.
Keep in mind: If claims exceed the bond, workers' wage claims are paid first, then breach of contract claims. Claimants other than residential homeowners are capped at half the bond.
- 3
Official guidance · OR
Oregon Construction Contractors Board, Resolving Disputes With Your Contractor
What it says
Oregon's Construction Contractors Board takes homeowner complaints for breach of contract or negligent or improper work against licensed contractors. For work on an existing home, the complaint must be filed within one year after the work was substantially completed, and for a residential bond you must first send the contractor a pre-complaint notice by certified mail and wait 30 days.
Keep in mind: The board says there are no exceptions to its time limits. For a new home the deadline is one year from first occupancy or two years from substantial completion, whichever is earlier. Complaints can only be filed against licensed contractors.
- 4
Statute · Federal
Fair Credit Billing Act, 15 U.S.C. § 1666i (claims and defenses against card issuer)
What it says
If a contractor you paid by credit card does bad or unfinished work, you may be able to refuse to pay the card issuer for that charge, raising the same complaints you have against the contractor. You must first make a good faith attempt to resolve it with the contractor.
Keep in mind: The charge must be over $50 and made in your home state or within 100 miles of your mailing address (these two limits do not apply in some cases, such as when the card issuer itself sold or controls the seller). It does not cover tort claims, and you can only withhold up to the amount of that charge still unpaid when you first notify the issuer or contractor. It covers credit cards (open-end consumer credit), not debit cards.
- 5
Official guidance · Federal
EPA Lead Renovation, Repair and Painting Program
What it says
EPA's RRP Rule requires anyone paid to disturb painted surfaces in a home built before 1978 to be certified, with workers trained in lead-safe work practices. If your house is older than 1978 and the contractor is not EPA or state lead-safe certified, that is a red flag and a possible violation.
Keep in mind: Some states and tribes run their own EPA-authorized RRP programs instead of EPA, including Oregon and Washington. The rule generally does not apply to homeowners working on their own pre-1978 home, and after a disaster firms are exempt from certain requirements. The firm must be certified; workers can be certified renovators or be trained on the job by one.
- 6
Regulation · Federal
EPA RRP Rule, 40 C.F.R. § 745.89 (firm certification)
What it says
A company paid to do renovation covered by the lead rule must apply to EPA for firm certification. You can ask a contractor working on a pre-1978 home for proof of its lead-safe firm certification.
Keep in mind: Applies to renovations covered by the RRP rule in target housing (generally homes built before 1978) and child-occupied facilities. In some states the certification comes from the state program instead.
- 7
Official guidance · CA
CSLB, Construction Complaints consumer guide
What it says
California's Contractors State License Board takes complaints about violations generally for up to four years from the date of the suspected illegal act or omission. It runs a mandatory arbitration program for disputes with alleged damages of $25,000 or less and a voluntary one for $25,000 to $50,000, and discipline can include orders to make or pay for repairs.
Keep in mind: This is a board consumer guide, not a statute. The guide also notes it is illegal to contract for jobs of $1,000 or more without a license, and that with an unlicensed contractor it is up to the homeowner to seek restitution.
Read next
Legal information, not legal advice
This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.