The short answer
A complete electrical bid counts the circuits, outlets, switches and fixtures room by room, and spells out any panel work, including its size and whether the utility needs to be scheduled. It also covers GFCI and AFCI protection where code calls for it, the permit and inspection, who patches the walls and the labor warranty. With counts in hand, you can compare electricians on the same job.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Upgrade electrical panel”
Ask for this in writingAsk for the amperage, brand and model, number of spaces, and whether the meter, service cable and utility coordination are included.
“Add outlets as needed”
Ask for this in writingAsk for a count of outlets by room, and a set price for any added outlet you approve.
“Bring wiring up to code”
Ask for this in writingAsk exactly what work that means, such as which circuits, protection or grounding, with a count and a price for each part.
“Install EV charger circuit”
Ask for this in writingAsk for the breaker size, wire size, run length, charger location and whether the panel can carry it without an upgrade.
A payment plan tied to finished work
Electrical work has natural checkpoints, because an inspector usually looks at the wiring before walls close and again at the end. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), tie the rest to inspections, and hold the balance until the final inspection and patching are done. The payment schedule checker can test your plan.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Rough wiring done and rough inspection passed | 40% |
| Panel or service set and power restored by the utility | 25% |
| Devices and fixtures installed and working | 15% |
| Final inspection passed and walls patched | Balance |
Comparing two or three bids
- Line up the room-by-room counts across bids, since a lower price with fewer outlets or circuits is a different job.
- Compare panel amperage, number of spaces and whether the utility work is included, as that can be a big part of the price.
- Check that each bid treats GFCI and AFCI protection the same way, so you're not comparing a code-ready bid with one that isn't.
- See who patches walls in each bid, because leaving it out can make one bid look cheaper than it'll end up.
- Use the bid comparison spreadsheet to line them up, then run a free bid check on your favorite.
Questions to ask before you sign
- 1Can you give me a count of circuits, outlets, switches and fixtures for each room?
- 2Does my panel have room for this, or do I need an upgrade, and did you do a load calculation?
- 3If the service changes, who schedules the utility and how long will the power be off?
- 4Where will you add GFCI and AFCI protection?
- 5What's your price if you find old wiring that needs replacing, and will you ask me first?
- 6Who patches and paints the walls after?
- 7Who pulls the permit and schedules the inspections?
- 8Are you supplying the fixtures, or installing ones I buy?
Permits
New circuits, panel and service upgrades, EV chargers and most rewiring commonly need an electrical permit and inspections, so check with your city or county building department. The licensed electrician should pull it, as explained in who's responsible for permits.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should an electrical quote list every outlet?
For anything bigger than a small repair, yes, at least as a count per room. Counts let you compare bids and check the finished job. If your quote has one lump sum, ask for the counts before you sign.
What should a panel upgrade quote include?
The amperage, brand, model and number of spaces, plus the meter base, service cable, grounding, permit and utility coordination if they're part of it. It should also say how long the power will be off.
Do I need a panel upgrade for an EV charger?
Not always. A load calculation shows whether your panel and service can carry the charger as is. Ask for one before agreeing to an upgrade, and ask whether a smaller charger setting would avoid it.
Is it a problem if the electrician wants me to pull the permit?
It's worth a conversation. Pulling the permit is normally the licensed contractor's job, and whoever holds it is responsible for the work to the building department. Ask them to pull it, and see our page on a permit pulled in my name.