The short answer
A good bathroom remodel bid names the shower waterproofing system and says it gets a flood test before tile goes on. It also lists the tile areas, fixtures, exhaust fan and plumbing work, and puts a price on rot or subfloor repair before demolition starts. Those details are what separate a bathroom that lasts from one that leaks behind the tile.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Tile shower walls and floor, waterproof per code”
Ask for this in writingAsk which waterproofing product or method they'll use, whether there's a flood test before tile, and how high the tile goes.
“Replace rotted subfloor as needed”
Ask for this in writingAsk for a price per square foot or per hour, a cap, and photos plus a written change order before going past it.
“Install customer-supplied fixtures”
Ask for this in writingAsk who supplies the shower valve, since it goes in the wall early, and whether the install price covers trim kits, drains and shutoff valves.
“New exhaust fan”
Ask for this in writingAsk where the fan will vent, whether the duct runs all the way outside, and what size fan fits the room.
A payment plan tied to finished work
On a bathroom remodel, tie payments to stages you can see, like the waterproofing passing a flood test, rather than dates. Keep the deposit modest, or your state's limit, if lower, and see our deposit limits by state page. Hold a real final payment until the glass, fixtures and punch list are done.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Demolition done and rough plumbing and electrical pass inspection | 25% |
| Shower waterproofing installed and flood test passed | 20% |
| Tile set and grouted | 25% |
| Fixtures, vanity and glass installed, punch list done | Balance |
Comparing two or three bids
- Check that every bid names a waterproofing method and a flood test, since that's the part most likely to differ and the hardest to fix later.
- Line up the tile areas and the tile allowance per square foot, so you're comparing the same amount of tile.
- See which bids include the glass door, the vanity top and the toilet, and which leave them as extras.
- Compare the price each bid sets for rot or subfloor repair, because that's where bathroom totals tend to grow.
- Put the bids side by side in our bid comparison spreadsheet, or run a free bid check to see what each one leaves out.
Questions to ask before you sign
- 1Which waterproofing system will you use, and will you do a flood test before tile?
- 2Where will the exhaust fan vent, and is the duct going all the way outside?
- 3What happens, and what does it cost, if you find rot when the old shower comes out?
- 4Are you replacing the supply and drain lines, or reconnecting the old ones?
- 5Who supplies the shower valve and fixtures, and when do you need them on site?
- 6Will you add blocking in the walls for grab bars or a shower door?
- 7How long will we be without this bathroom?
- 8Which permits does this need, and will you pull them?
Permits
Moving or replacing plumbing, adding circuits or a fan, and changing walls in a bathroom commonly need a permit, while a cosmetic refresh may not. Check with your city or county building department, and have the licensed contractor pull the permit and schedule the inspections.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should a bathroom remodel bid include a waterproofing membrane?
If there's a tiled shower, yes, the bid should name the waterproofing method. Tile and grout aren't waterproof by themselves. Ask for the product or method and a flood test before tile goes on.
Should a bathroom quote include fixing rot under the old shower?
Nobody can see it until demolition, so most quotes don't include it as a fixed amount. What the bid should include is a price per square foot or per hour, and a promise to show you photos and get your written okay first.
Is a tile allowance per square foot normal in a bathroom bid?
Yes, it's common when you haven't picked tile yet. Check that the allowance covers the tile you like, and ask whether labor changes for small mosaic or large-format tile.
What if my bathroom bid doesn't mention the exhaust fan?
Ask about it before you sign. The bid should say whether the fan is new or reused and where it vents. A fan ducted outside helps the new bathroom last.
How do I handle changes once the bathroom is torn out?
Get each change in writing with a price and any schedule change before the work happens. Here's how change orders work.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.