What should be in a remodeling contract? A checklist

What should be in a remodeling contract? A plain-English home improvement contract checklist: scope, price, payments, dates, changes, permits and warranty.

Updated November 19, 2026 · 8 min read

A remodeling contract doesn't need to be long or full of legal words. It needs to be clear. If you and your contractor each read it six months from now, you should both come away with the same answer to “what did we agree to?”

Use this checklist before you sign. Not every item fits every job, but each one is worth a quick look. If your contractor gave you an estimate to sign instead of a contract, the same checklist applies. Our guide on estimate vs contract explains why.

First: your state may require some of this

Many states require certain items in home improvement contracts. Two examples:

  • California. The Contractors State License Board says home improvement contracts over $500 must be in writing, and the contract needs a detailed payment schedule, who will get the permits, and a completion date. It also says a good contract includes notices about your right to cancel and about mechanics liens.
  • Maine. The Maine Attorney General explains that under the state's Home Construction Contracts Act (Title 10, section 1487 of the Maine Revised Statutes), contracts over $3,000 must include a warranty statement, a deposit limit of no more than one-third of the price, estimated start and completion dates, and a rule that change orders are written and signed by both sides.

Other states have different rules, or fewer. Look up yours on our contractor rules by state page and our deposit limits by state page, which both list their sources.

The checklist

1. Who's who

  • The contractor's legal business name, address and phone number
  • Their license number, in states that license contractors
  • Your name and the address where the work will happen
  • The date, and who is signing for the business

The FTC lists the contractor's name, address, phone number and license number as things your contract should include. Check that the business name matches the license record. Here's how to check a contractor's license.

2. A detailed scope of work

This is the heart of the contract. It should say what will be done, room by room or step by step, in enough detail that another contractor could price the same job. California's board suggests details like size, color, amounts of materials, model numbers and who will do which part of the work. Attach drawings or plans if you have them.

Watch for open-ended words like “as needed” or “as required.” Ask for a number, a limit or a unit price instead.

3. Materials and allowances

  • Brands, models, colors and finishes for anything you've already picked
  • An allowance (a set budget) for anything you haven't picked yet, like tile or light fixtures
  • What happens if you spend more or less than the allowance, and whether labor is included

4. Exclusions

A short list of what is not included. Common ones are permits, hauling debris, repairs to hidden damage, painting and moving appliances. If there's no exclusions section, ask what's left out.

5. Price

The total price, and how it's set: a fixed price, time-and-materials, or cost-plus. If it's not a fixed price, the contract should give the hourly rates, markups or fee, and ideally a cap.

6. Deposit

How much is due at signing, and what it covers, such as ordering materials. Some states cap deposits. The FTC advises not paying the full amount up front.

7. A payment schedule tied to the work

Each payment should match a stage of finished, visible work, like “drywall hung and taped,” not a date on the calendar. In California, the board says payments can't be more than the value of the work done. The FTC advises not making the final payment until the work is done and you're satisfied. See understanding contractor payment schedules.

8. Start and finish dates

An estimated start date and completion date. The FTC lists both as contract items. It also helps to say what counts as an allowed delay, like weather or back-ordered materials you chose, and how you'll be told about delays.

9. How changes work

A line saying changes will be written up, priced and signed by both of you before the extra work starts, and that the contractor won't bill for extra work without a signed change order. Read more about construction change orders.

10. Permits and inspections

Who gets the permits, who pays for them, and who schedules inspections. In most cases this should be the contractor. Ask that the final payment wait until any final inspection passes.

11. Site rules and cleanup

  • Working days and hours
  • How your floors, furniture and yard will be protected
  • Where materials and the dumpster will go
  • Daily cleanup and final cleanup, including hauling away debris

California's board specifically suggests putting cleanup and debris removal in the contract.

12. Warranty

How long the contractor stands behind their work, what's covered, and how you ask for a repair. Get it in writing. Manufacturer warranties on products are separate, so ask the contractor to hand over the paperwork when the job is done.

13. Lien releases

In many states, a subcontractor or supplier who isn't paid can file a lien on the property they worked on. To protect yourself, ask for lien releases (sometimes called lien waivers) as you pay. California's board, for example, suggests getting a signed conditional release from possible lien claimants before each payment, and mentions joint checks as a simple way to make sure subcontractors and suppliers get paid.

14. Insurance

A promise to carry liability insurance, and workers' compensation if the contractor has employees, with a current certificate given to you before work starts.

15. Your right to cancel

If you sign at home or somewhere other than the seller's permanent place of business, the FTC's Cooling-Off Rule may give you until midnight of the third business day to cancel. The seller must tell you about this right when you sign and give you cancellation forms. There are exceptions, such as emergency repairs, and some states add their own notice rules. The FTC also suggests your contract include a written statement of your right to cancel.

16. Disagreements and ending the contract

  • How disagreements get handled, such as talking first, then mediation or arbitration
  • When either side can end the contract, and what happens to money already paid
  • Whether there's a cancellation fee

If there's an arbitration clause, read it closely. It can change where and how a disagreement gets decided.

17. Signatures and copies

Every blank filled in or crossed out, every page and attachment listed, signatures and dates from both of you, and a full signed copy for your records.

How to use this checklist

You don't need to rewrite your contractor's paperwork. Just mark what's missing, then ask for those items to be added or put in a short signed addendum. Most good contractors are glad to clear things up before work starts.

A few tools can help:

If you'd rather have a person go through it, our $99 Bid Review checks your contract against this kind of checklist and your state's rules, with sources, and an experienced reviewer checks every finding.

Have a proposal in hand?

We'll read it line by line and give you a report checked by an experienced reviewer, with the specific questions to ask before you sign or pay.

What should be in a remodeling contract? A checklist | OwnersBack