What is a construction change order?
What change orders are, why they matter, what a good one includes, and how to avoid surprise charges on your renovation.
Updated November 16, 2026 · 5 min read
A change order is a written amendment to your construction contract. It documents a change to the original scope of work, along with how that change affects the price and the schedule.
Changes are normal. You might choose a different tile, or the crew might find damage behind a wall that wasn't visible before. What causes problems is not the change itself, but changes that are agreed on verbally and priced later.
What a good change order includes
- A description of the change, specific enough that there's no doubt about what was added, removed or substituted
- The reason for the change (homeowner request, unforeseen condition, design change)
- The cost — or credit — of the change
- The effect on the schedule, if any
- The updated contract total
- Signatures and dates from both you and the contractor, before the changed work begins
Red flags in a contract's change language
Look at how your contract describes changes. Wording like “changes will be billed accordingly” or “extra work at our standard rates” doesn't require written approval or pricing in advance. Ask for a clause saying no extra work will be billed without a signed change order.
Unforeseen conditions
Renovations, especially in older homes, sometimes uncover hidden problems such as rot, outdated wiring or plumbing issues. Ask before you sign how these will be handled: Will work stop while you're notified? Will you see photos and a written price before repairs proceed? How will the price be calculated?
Before you approve a change order
- Ask whether the work was already included somewhere in the original scope
- Ask how the price was calculated, especially for labor
- Confirm whether the change affects any permit or inspection
- Keep a copy with your contract
The FTC recommends keeping copies of your contract, change orders and correspondence together. If you have a verbal conversation on site, it's good practice to send a short email the same day confirming what was discussed.
Sources
This guide is general educational information, not legal advice. Rules vary by state and locality. Check with the relevant official agency or a licensed professional.