What a landscaping or irrigation bid should include

The short answer

A complete landscaping bid lists every plant with its size and quantity, the soil prep and mulch, and how the yard will be graded so water drains away from the house. For irrigation, it names the number of zones, the controller, the heads or drip lines and any backflow preventer. It also says how long plants are guaranteed and what would void that, and if your bid covers most of this, you're in good shape.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 14 found in my bid

Vague lines worth a question

  • “Install shrubs and perennials in front beds”

    Ask for this in writingAsk for a plant list with names, sizes and quantities, plus a planting plan.

  • “Irrigation system complete”

    Ask for this in writingAsk for the number of zones, the controller, the head or drip type, and whether a backflow preventer and permit are included.

  • “Mulch all beds”

    Ask for this in writingAsk for the mulch type, its depth in inches and whether weed fabric goes under it.

  • “Grade yard as needed”

    Ask for this in writingAsk which areas will be regraded, which way water will flow and where it ends up.

  • “Plants guaranteed”

    Ask for this in writingAsk for how long, whether replacements include labor, and what would void the guarantee.

A payment plan tied to finished work

Landscaping usually runs in phases: clearing and grading, then irrigation, then planting. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and pay as each phase is done. Our payment schedule checker can test the plan you were given.

StageShare
Deposit at signing10%
Old plants removed and yard graded20%
Irrigation installed and run zone by zone (backflow inspected, if required)25%
Plants, sod and mulch installed30%
Controller set, walkthrough and punch list doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Compare plant sizes, not just counts. Ten small shrubs and ten large ones make very different bids.
  • Line up the irrigation: number of zones, the controller, heads or drip, and the backflow preventer.
  • Check the soil prep and mulch depth in each bid, since those are easy places to trim a price.
  • Compare the plant guarantees: how long, and what voids them.
  • Pull any hardscape out and compare it as its own job. Our bid comparison spreadsheet helps, and you can run a free bid check on each one.

Questions to ask before you sign

  1. 1Can I get a plant list with sizes and quantities?
  2. 2How many irrigation zones will there be, and what does each one water?
  3. 3Does my area require a backflow preventer, and is it included?
  4. 4How will you grade the yard so water drains away from the house?
  5. 5What soil prep and amendments are included?
  6. 6How long are the plants guaranteed, and what would void that?
  7. 7Will you set up the controller and give me a watering plan?

Permits

Backflow preventers, retaining walls, new drainage lines and some grading work can need a permit or inspection, while planting usually doesn't. Check with your city or county building department or your water provider, and have your licensed contractor pull any permit the work needs.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

What should a landscaping quote include?

A plant list with sizes and quantities, a planting plan, soil prep, mulch, grading, irrigation details and a plant guarantee. Hardscape like patios should be listed on its own with its own specs. If any of that is missing, ask for it before you compare prices.

What does 1-gallon or 5-gallon mean on a landscaping bid?

It's the size of the nursery pot the plant comes in, and it's a common way to describe plant size on a bid. Bigger pots mean bigger, more mature plants. Make sure each bid lists the same sizes when you compare.

Should a sprinkler system bid include a backflow preventer?

If your area or water provider requires one, yes. It keeps irrigation water from flowing back into your drinking water. Ask whether the test and any permit are included too.

Why do plant guarantees vary so much between bids?

Some cover a full season or a year, some cover a shorter time, and some depend on following a watering plan. Ask for the guarantee in writing, with what it covers and what voids it.

What if plants die right after they're installed?

Check the guarantee and contact the contractor in writing with photos. A bid with a clear watering plan makes it easier to sort out what happened. Here's what to do if a contractor won't honor a warranty.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.