The short answer
A complete HVAC replacement bid lists the model numbers of every piece of equipment, its size and efficiency ratings, and the load calculation that sized it. It also says what happens to the ductwork, line set, drain, wiring and thermostat, who pulls the permit, and how the warranties get registered. If your bid has model numbers and a load calculation, you're already ahead.
Updated November 19, 2026
On this page
What a complete bid spells out
Tick these off against your bid. Anything missing is worth a quick question before you sign.
Vague lines worth a question
“Install new 3-ton high-efficiency system”
Ask for this in writingAsk for the brand and full model numbers of each unit, the efficiency ratings and the load calculation behind the size.
“Modify ductwork as needed”
Ask for this in writingAsk which ducts are being changed, sealed or reused, and for a price on any added duct work before it starts.
“Reuse existing line set if possible”
Ask for this in writingAsk how the lines will be tested and cleaned, and for a set price if they need replacing.
“10-year warranty”
Ask for this in writingAsk whether that's parts, labor or both, who registers it and what happens if registration is missed.
“Price after rebates”
Ask for this in writingAsk for the full price before any rebate, who applies for it and what you owe if you don't qualify.
A payment plan tied to finished work
HVAC jobs often finish in a day or two, so the main thing is not paying the full price before the system is running and inspected. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance until the inspection passes and you have the startup report. You can check any plan with the payment schedule checker.
| Stage | Share |
|---|---|
| Deposit at signing | 10% |
| Equipment delivered, with model numbers matching the bid | 40% |
| System installed, started up and running | 40% |
| Permit inspection passed and startup report delivered | Balance |
Comparing two or three bids
- Look up each bid's model numbers so you know you're comparing the same size and efficiency, not just the same brand name.
- Check whether each bid did a load calculation; if two bids recommend different sizes, ask each one to show how they got there.
- Line up what each bid does with ducts, line set, drain, electrical and thermostat, since one bid may leave out work another includes.
- Compare the price before any rebates, then compare what each contractor says about who applies and what happens if you don't qualify.
- Lay them out in the bid comparison spreadsheet and run a free bid check on your top pick.
Questions to ask before you sign
- 1Did you do a load calculation for my house, and can I see it?
- 2What are the full model numbers for each piece of equipment?
- 3Which ducts are you changing, sealing or reusing?
- 4Are the line set, drain, disconnect and thermostat new or reused?
- 5Who pulls the permit and schedules the inspection?
- 6Will I get a startup report with the charge and airflow readings?
- 7Who registers the equipment warranty, and how long is your labor warranty?
- 8If this rebate doesn't come through, what's my price?
Permits
Replacing a furnace, air conditioner or heat pump commonly needs a mechanical permit, and gas or electrical changes may need their own, so check with your city or county building department. The licensed contractor should pull it and schedule the inspection, as covered in who's responsible for permits.
Want a second set of eyes on your bid?
Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.
Common questions
Should an HVAC quote include a load calculation?
A good one does, or at least explains how the size was chosen. Matching the old unit's size assumes the old one was right, and homes change with new windows and insulation. Ask for the load calculation in writing.
Why does one HVAC bid cost so much more than another?
Different efficiency ratings, ductwork, line sets and included parts can make a big difference. Line up the model numbers and the work list for each bid. Then ask each contractor what's driving their number.
Do I need new ductwork with a new AC or furnace?
Not always, but the bid should say what condition your ducts are in and whether they fit the new system. Leaky or undersized ducts can keep new equipment from performing as rated. Ask for a test or an inspection of the ducts if the bid is unclear.
What if my new HVAC system isn't working right after install?
Contact the installer in writing first, and ask for the startup readings. Most issues get fixed under the labor warranty. If it stalls, our page on a contractor who won't fix mistakes has next steps.
Related reading
These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.