Skip to content
OwnersBack

Bid checklists

What a kitchen remodel bid should include

The short answer

A good kitchen remodel bid names the cabinets and countertops, lists the appliance hookups, electrical and plumbing work, and says who handles drywall, paint and trim after demolition. It also ties payments to finished stages and says what happens to the schedule while cabinets and counters are on order. With those pieces in writing, you can compare bids fairly and catch gaps before you sign.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 12 found in my bid

Vague lines worth a question

  • “Install new cabinets per customer selection”

    Ask for this in writingAsk for the cabinet line, box material, door style, finish and the number of boxes, plus whether crown molding, fillers and hardware are included.

  • “Electrical upgrades as needed”

    Ask for this in writingAsk for the count of new circuits, outlets and lights, and a written price per added circuit if more turn out to be needed.

  • “Quartz countertops with standard edge”

    Ask for this in writingAsk for the thickness, edge profile, square footage, which cutouts are included and whether the backsplash is part of the price.

  • “Patch and repair walls as required”

    Ask for this in writingAsk which walls are covered and whether drywall, texture, paint and trim are all included, or only the patch.

A payment plan tied to finished work

On a kitchen remodel, tie each payment to something you can see finished or an inspector signs off, not to dates. Keep the deposit modest, or your state's limit, if lower, and if part of it pays for special-order cabinets, ask to pay that part when the order is placed, with a receipt. Our payment schedule checker shows whether a schedule stays behind the work.

StageShare
Deposit at signing10%
Demolition done and rough plumbing and electrical pass inspection25%
Drywall finished and cabinets installed25%
Countertops installed and appliances hooked up25%
Final inspection passed and punch list doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Line up the cabinet line and box material side by side, since cabinets are often the biggest difference between kitchen bids.
  • Check that every bid includes the same appliance hookups, hood duct and new circuits, so one isn't lower just because it left work out.
  • Compare each allowance for lighting, tile and hardware against what the items you actually like cost.
  • Note which bids include drywall, paint and flooring patches and which leave them to you.
  • Ask each contractor for cabinet and counter lead times in writing, then put the bids in our bid comparison spreadsheet or run a free bid check.

Questions to ask before you sign

  1. 1Do I get a drawing with cabinet sizes and the layout before I sign?
  2. 2When will you order the cabinets and countertops, and how long do they take to arrive?
  3. 3Is the wall we're taking out load-bearing, and who confirms that?
  4. 4Does my electrical panel have room for the new circuits?
  5. 5Will the range hood vent outside, and where will the duct run?
  6. 6How long will we be without a working kitchen, and can you set up a temporary sink?
  7. 7Which work does your own crew do, and which goes to subcontractors?
  8. 8Which permits does this job need, and will you pull them?

Permits

Moving or adding plumbing, gas lines and new electrical circuits, and taking out walls, commonly need a permit, while swapping cabinets and counters in the same spot often doesn't. Check with your city or county building department, and have the licensed contractor pull the permit and schedule the inspections.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

Should a kitchen remodel bid include appliance installation?

Most do, but not always. The bid should say who buys the appliances and that install and hookups are included, like the gas line, fridge water line, dishwasher and disposal. If it doesn't say, ask before you sign so it isn't an extra later.

Should the countertop price include the backsplash and sink cutout?

It depends on the shop, which is why the bid should say. Ask whether the price covers the template, cutouts for the sink, cooktop and faucet, and the backsplash, or only the slab.

How do I know if a kitchen allowance is high enough?

An allowance is high enough if it covers what you'd actually pick. Price your lighting, hardware or tile before you sign and compare. Ask whether the allowance includes labor and how overages and credits are figured.

Why are my kitchen remodel bids so far apart?

Usually because they don't include the same things. One bid may have better cabinets, a vented hood or new circuits, and another may leave drywall and paint to you. Here's more on why contractor bids vary.

Is a kitchen bid the same as a contract?

Not always. A bid prices the work, and a contract adds the terms, like payments, changes and dates. Read about the difference between an estimate and a contract before you sign either.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.

Kitchen remodel bid checklist: what it should include | OwnersBack