What a solar panel bid should include

The short answer

A complete solar bid gives the system size in kW, the panel and inverter models, and a production estimate with the assumptions behind it. It also shows the total price and, if financed or leased, the rate, term, fees and total you'll pay, plus who handles permits and the utility hookup and every warranty with its length. If a tax credit or rebate is part of the math, the bid should say what happens if you don't qualify.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 14 found in my bid

Vague lines worth a question

  • “Wipe out your electric bill”

    Ask for this in writingAsk for the production estimate, the utility rate and rate increases it assumes, and how savings change if those assumptions are off.

  • “Net cost after incentives”

    Ask for this in writingAsk for the full price before any credit or rebate, who qualifies for each one, and what you owe if you don't.

  • “Premium panels and inverter”

    Ask for this in writingAsk for the brand and model of each, written into the bid.

  • “25-year warranty”

    Ask for this in writingAsk which warranty that is (panels, inverter, workmanship or production), what it covers and who honors it if the installer closes.

  • “Low monthly payment”

    Ask for this in writingAsk for the interest rate, term, any dealer fee, the yearly increase if it's a lease, and the total you'll pay over the full term.

A payment plan tied to finished work

With a cash purchase, tie payments to steps you can see or an inspector or the utility approves. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance until the utility gives permission to turn the system on. If a lender pays the installer, ask for its release schedule in writing too, and check any plan with the payment schedule checker.

StageShare
Deposit at signing10%
Permit approved and equipment delivered30%
Panels, inverter and wiring installed30%
Building inspection passed20%
Utility permission to operate and system producingBalance
Check your own payment schedule →

Comparing two or three bids

  • Compare the price for the system size, not just the total, so a bigger system doesn't look like a worse deal.
  • Line up the production estimates and check that each uses similar assumptions about shading and utility rates.
  • If you're comparing a loan, a lease and a cash price, compare the total paid over time, not the monthly payment.
  • Check which bids include roof work, panel upgrades or a battery, since those can explain most of a gap.
  • Ask each installer what's driving their price, and run a free bid check on any solar contract before you sign.

Questions to ask before you sign

  1. 1What size system is this, and what panel and inverter models are you using?
  2. 2What does your production estimate assume about shading, roof angle and utility rates?
  3. 3What's the full cash price, and if I finance, what's the rate, term, fees and total paid?
  4. 4If I don't qualify for the tax credit or rebate, what does my payment become?
  5. 5Does my roof need work first, and what would it cost to remove and reinstall the panels later?
  6. 6Who warrants leaks around the roof mounts, and for how long?
  7. 7Who handles the permit and utility hookup, and when can the system turn on?
  8. 8How do I cancel, and do the loan or lease terms say something different?

Permits

Solar systems commonly need a building or electrical permit, an inspection and approval from your utility before they can be turned on, so check with your city or county building department. The licensed installer should pull the permits and handle the utility paperwork; see who's responsible for permits.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

What should a solar quote include?

At minimum, the system size, panel and inverter models, a production estimate with its assumptions, the full price, any financing terms, and every warranty with its length. It should also cover roof condition, permits and the utility hookup.

How do I check if a solar production estimate is realistic?

Ask what it assumes about shading, roof direction and angle, and compare it with the other bids for your same roof. If one bid estimates far more production for the same size system, ask that installer to explain why.

Should a solar bid count the tax credit in the price?

It can show it, but the full price should be there too. Tax credits and rebates depend on your situation and change over time. Ask what happens to your payment if you don't get it, and check with a tax professional.

Should I fix my roof before installing solar?

If your roof is near the end of its life, it's usually worth replacing first, because removing and reinstalling panels later costs extra. Ask the installer to note the roof's condition in the bid, and see our roof replacement bid guide.

Can I cancel a solar contract after signing?

It depends on where and how you signed and on the contract terms, and a loan or lease may have its own terms. Read the cancellation section before you sign. Our page on canceling a contract after signing explains what to look for.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.