What a new home construction bid should include

The short answer

A good new home bid names the plans and specifications it's priced from, says who pays permits, impact fees, utility hookups and surveys, and spells out site work with terms for rock or bad soil. It also sets a draw schedule tied to inspections, lists every allowance with its amount, and includes lien releases with each draw and a written warranty. On a new house, those details decide what you're actually buying and when you pay for it.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 12 found in my bid

Vague lines worth a question

  • “Build home per plans, standard specifications”

    Ask for this in writingAsk for the plan set by name and date and a written spec sheet, so standard means something you can check.

  • “Site work allowance”

    Ask for this in writingAsk what the allowance covers, how it's measured, and the price for rock, water or extra fill if the site needs more.

  • “Draws per lender schedule”

    Ask for this in writingAsk to see the draw schedule now and make sure each draw ties to an inspection or a finished stage.

  • “One-year builder warranty”

    Ask for this in writingAsk what it covers, whether systems and structure have longer terms, and how you make a claim.

  • “Completion approximately 10 to 12 months”

    Ask for this in writingAsk for a completion date tied to the permit, a list of allowed delays and what happens if it runs past.

A payment plan tied to finished work

On a new home, payments usually come as draws, and each one should match an inspection or a stage you can see. Keep the deposit modest, or your state's limit, if lower, and ask for lien releases with every draw. Our payment schedule checker shows whether a draw schedule stays behind the work.

StageShare
Deposit at signing5%
Foundation inspected and poured15%
Framing, roof and windows done, framing inspection passed25%
Rough-ins and insulation pass inspection20%
Drywall, cabinets and interior finishes installed25%
Certificate of occupancy issued and punch list doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Make sure every builder is pricing the same plan set and spec sheet, by name and date.
  • Compare site work line by line, including grading, driveway, utility trenching and the terms for rock or bad soil.
  • Line up each allowance against what you'd actually pick, since low allowances can make a home bid look cheaper.
  • Check which bids include permits, impact fees, utility hookups and surveys, and which leave them to you.
  • Compare the draw schedules and warranties side by side, then run a free bid check on the one you're leaning toward.

Questions to ask before you sign

  1. 1Which plan set and spec sheet is this price based on?
  2. 2Which fees, surveys and hookups are in your price, and which aren't?
  3. 3What happens to the price if you hit rock or poor soil?
  4. 4Can I see the draw schedule, and does each draw follow an inspection?
  5. 5Who carries builder's risk insurance while the house is going up?
  6. 6Will I get lien releases from subs and suppliers with each draw?
  7. 7Can I do a walkthrough before drywall goes up?
  8. 8What does your warranty cover, for how long, and how do I file a claim?

Permits

A new home typically needs a building permit plus separate permits and inspections for electrical, plumbing, mechanical and sometimes grading, septic or well work. Check with your city or county building department, and have the licensed builder pull the permits and schedule each inspection.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

What's a draw schedule on a new home bid?

It's the list of payments, or draws, through the build. Each draw should match an inspection or a stage you can see, like foundation, framing or drywall. If draws are tied to dates instead, ask to change them.

Should a new home bid include site work?

It should say what's included, like clearing, grading, excavation, driveway and utility trenching, and what isn't. Ask for written terms if they hit rock or poor soil, since site work can move the total a lot.

How do allowances work in a new home bid?

Each allowance sets an amount for something you pick later, like flooring or lighting. If your pick costs more, you pay the overage. Price your real choices before signing so the allowances match.

What warranty should a home builder give?

Look for separate terms for workmanship, systems and structure, each with a length, plus how claims are made. If problems show up later, see our page on new home builder defects.

Should I get lien releases from my builder?

On a new home, yes, they're worth asking for with each draw. They show subcontractors and suppliers have been paid. Here's how lien waivers work.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.