Can I sue the builder for defects in my new home?

The short answer

Your odds: Often a good claim

Often, yes. In many states a builder who sells you a newly built home is held to an implied promise that it was built in a workmanlike way and is fit to live in, on top of any written warranty. But new-home claims come with special rules: many states require written notice and a chance for the builder to inspect and repair first, and many builder contracts send disputes to arbitration.

Steps to take
7
Laws and cases cited
14
Last checked

What to know

  • Many states hold builders to an implied warranty that a new home was built in a workmanlike manner and is fit to live in.
  • Your written builder warranty matters, but it may not be your only protection.
  • Several states require written notice and a chance to repair before you can sue a builder.
  • Read your purchase contract for an arbitration clause and warranty claim deadlines right away.
On this page
  1. Do you have a case?
  2. The legal claims that usually apply
  3. Notice and repair laws come first
  4. How it works in your state
  5. Arbitration clauses and deadlines
  6. Your state's rules, with sources
  7. What to gather
  8. What to do, step by step
  9. When to talk to a lawyer now
  10. Common follow-up questions
  11. Laws and cases on this page

The law, in detailTap a topic to open it.

Do you have a case?

New-home defects range from cosmetic (nail pops, sticking doors) to serious (foundation movement, roof leaks, plumbing failures, poor drainage). You usually have a claim if the defect comes from how the house was designed or built, it breaks a written warranty, a contract term, the building code or the builder's implied promise of workmanlike construction, and it causes you a real loss, such as the cost to repair.

Builders often handle warranty requests through a customer service process for the first year or longer. Use it, but in writing. A ticket in a builder's online portal is a start; a dated letter or email that lists each defect is better. If the problem involves the frame or foundation, see structural or foundation defects.

  • A defect in the design, materials or construction
  • A warranty, contract term, code section or workmanship standard it breaks
  • Written notice to the builder that follows any warranty or state procedure
  • A repair estimate or an expert's report

Notice and repair laws come first

Many states require you to give the builder written notice and a chance to inspect and repair before you sue. In California, the state Supreme Court held that the Right to Repair Act is the main, nearly exclusive way to sue a builder over defects in a newly built home sold as a residence, and buyers must follow its pre-lawsuit steps even if they plead other claims[6]. That ruling also confirmed that the Act set aside, for the homes it covers, an older California rule that had blocked negligence claims for defects that had not yet caused damage[7].

In Colorado, you must send a written notice of claim at least 75 days before filing, by certified mail or personal service[8]. In Florida, the notice must be served at least 60 days before filing and describe each defect and where it is[9]. In Texas, notice goes by certified mail at least 60 days before suing, and rejecting a reasonable settlement offer can cap your recovery[10]. In New York, a claim under the state's new-home warranty requires written notice to the builder no later than 30 days after the warranty period ends, and the builder gets a chance to inspect and repair[3]. Read right to repair notice laws before you send anything.

How it works in your state

Some recovery funds cover new construction and some do not. North Carolina's Homeowners Recovery Fund can reimburse a homeowner who suffered a loss in building or altering a single-family home, generally after an unpaid judgment against the general contractor, and payment is at the board's discretion[11]. Connecticut's Home Improvement Guaranty Fund, by contrast, does not cover new home construction[12].

Complaint deadlines can be short. In Oregon, a complaint to the Construction Contractors Board about a new home must be filed within one year from first occupancy or two years from substantial completion, whichever is earlier[13]. Pick your state below to see your licensing board, any recovery fund, notice rules and your small claims limit. The panel also shows whether your state licenses home builders, which tells you where a complaint can go.

Arbitration clauses and deadlines

Many builder contracts include an arbitration clause. Under federal law, a written arbitration clause in a contract involving interstate commerce is generally valid and enforceable, so a court will usually send the dispute to arbitration, though you can challenge the clause on ordinary contract grounds such as fraud[14]. Read the clause for who pays the fees and whether small claims court is still allowed. See what an arbitration clause means for you.

Every state also limits how long you have to sue, and many have an outer limit for construction claims that runs from completion even if you find the defect later. These periods vary by state. Read defects found years later, and do not let a builder's repair promises run out your clock.

Your state's rules, with sources

Pick your state to see the rules that matter here, each linked to its official source.

What to gather

Tick things off as you collect them. Your list stays on this device only.

0 of 9 gathered

What to do, step by step

  1. 1

    Read your contract and warranty

    Find the warranty periods, how to make a claim, any notice requirements and any arbitration clause. Write down every deadline.

  2. 2

    Report each defect in writing

    Send the builder a dated list of defects through its warranty process and by email or letter. Keep a copy of everything.

  3. 3

    Track changes over time

    Photograph cracks, gaps and water stains on a schedule, with a ruler in frame, so you can show whether a problem is growing.

  4. 4

    Get an independent inspection

    Hire an inspector or engineer who does not work for the builder. Read whether you need an expert for what to ask for.

  5. 5

    Send any formal notice your state requires

    If your state has a notice-and-repair law, follow its content, timing and delivery rules exactly, and allow the inspection it provides for.

  6. 6

    Organize your claim

    OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name. In a notice-law state, make sure your letter also meets the statute's requirements.

  7. 7

    File complaints and pursue your claim

    File a complaint with the licensing board where builders are licensed, then pursue arbitration or court as your contract and state law allow.

When to talk to a lawyer now

  • The defect involves the foundation, structure, water intrusion or safety
  • Your contract has an arbitration clause or limits the builder's warranties
  • The builder made a settlement or repair offer under a notice law
  • A warranty period or deadline to sue is coming up soon
  • Other homes in your development have the same problem
Find a lawyer in your state

Turn this into a plan you can act on

We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.

Hiring someone new to finish the job? Check their bid for free before you sign.

Common follow-up questions

Does a one-year builder warranty mean I can't sue after a year?

Not necessarily. The written warranty may cover some systems or the structure for longer, and in some states implied warranties and other claims exist alongside it. In New York, for example, the warranty the law adds to a new-home sale runs six years for material defects, unless the builder replaced it with a written limited warranty that meets the statute's standards[3]. Deadlines to sue vary by state, so check them before the first year ends.

Can I sue the builder if I bought the house from the first owner?

It depends on your state and the type of claim. Some states let later buyers enforce implied warranties or statutory claims, and others limit them to the first buyer. A lawyer in your state can tell you.

Do I have to let the builder make the repairs?

In states with notice-and-repair laws, the builder gets a chance to inspect and offer a repair before you sue, as in California for new homes[6]. You usually do not have to accept a repair that does not fix the problem, but get advice before you reject a formal offer.

Can my homeowners association bring the claim instead?

For common areas, often yes, and associations can face longer notice periods. Florida, for example, gives larger condo or homeowner association claims 120 days[9]. Defects inside your own home are usually your claim.

What if the builder has gone out of business?

Check whether your warranty was backed by a separate warranty company, whether your state has a recovery fund that covers new homes, and whether subcontractors did the defective work. See when a contractor goes out of business.

Laws and cases on this page

Each one was read on its source and checked on November 19, 2026.

  1. 1

    Court decision · TX · Supreme Court of Texas

    Humber v. Morton, 426 S.W.2d 554 (Tex. 1968)

    What it says

    A buyer's new house partly burned the first time a fire was lit in its badly built fireplace and chimney. The Texas Supreme Court rejected 'buyer beware' for new homes and held that a builder who sells a new house gives an implied warranty that it was built in a workmanlike manner and is suitable to live in.

    Keep in mind: Texas case from 1968 about a builder selling a new house, not a remodel. Texas law has developed since then, so check current Texas law. Other states may differ.

  2. 2

    Court decision · IA · Supreme Court of Iowa

    Kirk v. Ridgway, 373 N.W.2d 491 (Iowa 1985)

    What it says

    A buyer sued the contractor who built and sold the house to the buyer after the exterior paint peeled because it was incompatible with the building materials. The Iowa Supreme Court, noting that construction contracts already carry an implied warranty of workmanlike work, held that a builder-vendor of a home impliedly warrants it was built in a reasonably good and workmanlike manner and is reasonably fit for its purpose, and the buyer won.

    Keep in mind: Iowa case about the sale of a new house by the builder who built it. Other states may differ.

  3. 3

    Statute · NY

    N.Y. Gen. Bus. Law § 777-a

    What it says

    When a builder sells a new home in New York, the law adds a warranty to the sale: one year for poor workmanship, two years for plumbing, electrical, heating, cooling and ventilation systems, and six years for material defects. You must give the builder written notice of the claim no later than 30 days after the warranty period ends and let them inspect and repair.

    Keep in mind: This covers the sale of a new home by a builder, not ordinary remodeling. Under § 777-b a builder can replace this implied warranty with a written limited warranty that meets the statute's standards, so read your purchase contract.

  4. 4

    Statute · Federal

    Magnuson-Moss Warranty Act, 15 U.S.C. § 2310(d)

    What it says

    If a product with a written or implied warranty fails, such as windows, shingles or an appliance installed in your home, you can sue the warrantor for damages, and if you win the court may award your costs including attorney fees based on actual time spent.

    Keep in mind: The Act covers consumer products, including products installed in a home, not the contractor's labor or services by themselves. If the written warranty requires you to use the warrantor's informal dispute program first, you generally must use it before suing (15 U.S.C. § 2310(a)(3)). A case in federal court needs at least $50,000 in controversy across all claims (and each claim at least $25); smaller claims go to state court. The court can deny fees if it finds them inappropriate.

  5. 5

    Court decision · TX · Supreme Court of Texas

    Miller v. Keyser, 90 S.W.3d 712 (Tex. 2002)

    What it says

    A homebuilder's sales agent told buyers things about their lots that were not true. The Texas Supreme Court held that a person who works for a company can be personally liable under the Texas Deceptive Trade Practices Act for misrepresentations he makes himself, even when acting for the company.

    Keep in mind: Texas Supreme Court case under the Texas DTPA, involving new-home sales rather than a remodeling contract. The court only decided that the agent could be held liable and sent the case back for further proceedings. It also noted that an agent who passes along false company information may seek indemnity from the employer. Other states' consumer laws may treat individual liability differently.

  6. 6

    Court decision · CA · Supreme Court of California

    McMillin Albany LLC v. Superior Court, 4 Cal. 5th 241 (2018)

    What it says

    California's Supreme Court held that the Right to Repair Act (Civil Code section 895 and following) is the main, nearly exclusive way to sue a builder over defects in a newly built home sold as a residence. Buyers must follow the Act's pre-lawsuit steps, which start with written notice to the builder and give it a chance to inspect and offer a repair, even if they only plead other claims.

    Keep in mind: California only, and only for original construction of homes intended to be sold as individual dwellings, so it generally does not reach a remodel by a contractor you hired (the court did not address remodels directly). The Act does not apply to claims for fraud, personal injury or violation of a statute. Many other states have their own notice-and-repair laws with different steps; some have none.

  7. 7

    Court decision · CA · Supreme Court of California

    Aas v. Superior Court, 24 Cal. 4th 627 (2000)

    What it says

    Homeowners sued their builder in negligence for construction defects that had not yet caused property damage or injury. California's Supreme Court held they could not recover in negligence for those defects alone, because the cost of fixing a defect that has not caused harm is purely economic loss.

    Keep in mind: California case about new-home construction. It barred only negligence (tort) claims for defects that had not caused damage; the homeowners' contract and warranty claims were not affected. It was later changed by statute in California: in McMillin Albany LLC v. Superior Court (2018), the California Supreme Court said the Right to Repair Act (Civil Code section 895 and following) effectively abrogated Aas for the new homes that Act covers. Other states treat this issue differently.

  8. 8

    Statute · CO

    Colo. Rev. Stat. § 13-20-803.5

    What it says

    In Colorado, before you sue a contractor or builder over construction defects, you must send a written notice of claim at least 75 days before filing (90 days for commercial property), by certified mail with return receipt or by personal service. The law then sets a process for the contractor to inspect, and deadlines to respond (for example, a written offer within 30 days after the inspection ends, or 45 days for commercial property).

    Keep in mind: Cited from the 2025 signed bill (H.B. 25-1272) that amended this section and shows the notice language unchanged; the amendment applies to defect claims brought on or after its effective date. It applies to construction defect claims under Colorado's Construction Defect Action Reform Act.

  9. 9

    Statute · FL

    Fla. Stat. § 558.004

    What it says

    Before suing a Florida contractor over construction defects, you must serve a written notice of claim at least 60 days before filing, describing each defect and where it is. The contractor then has 45 days to respond, for example with an offer to repair or pay.

    Keep in mind: Florida only, and only for construction defect claims. Larger condo or homeowner association claims have longer periods (120 days). If you sue without responding to a timely settlement offer, the court can pause your case.

  10. 10

    Statute · TX

    Tex. Prop. Code § 27.004

    What it says

    Under the Texas Residential Construction Liability Act, you must send the contractor written notice of the defects by certified mail, return receipt requested, at least 60 days before suing. The contractor gets a chance to inspect within 35 days and may make a written settlement offer within 60 days of your notice.

    Keep in mind: Texas only, for residential construction defects. If you skip the notice or inspection steps, the case can be abated (paused). Notice is excused if you must sue sooner to beat the statute of limitations or are raising the defect as a counterclaim. If you reject a reasonable settlement offer, your recovery is capped at the value of the contractor's last offer plus costs and attorney fees incurred before you rejected it. The damages you can recover are limited to the items the statute lists, such as reasonable repair costs.

  11. 11

    Statute · NC

    N.C. Gen. Stat. § 87-15.8 (Homeowners Recovery Fund)

    What it says

    North Carolina's Homeowners Recovery Fund, run by the general contractors licensing board, can reimburse a homeowner who suffered a loss in building or altering a single-family home they own or owned. You generally must first exhaust your legal remedies against the general contractor and hold an unpaid judgment, unless a bankruptcy stay prevents suing.

    Keep in mind: North Carolina only, for single-family homes. Payment is at the board's discretion, not a right, and the board does not pay attorney fees. If you pulled the permit in your own name you may not qualify unless you used a general contractor.

  12. 12

    Official guidance · CT

    Connecticut Home Improvement Guaranty Fund (Conn. Gen. Stat. ch. 400)

    What it says

    Connecticut's Home Improvement Guaranty Fund can pay a homeowner up to $25,000 toward an unpaid court judgment (or court-confirmed arbitration decision) against a home improvement contractor. The contractor must have been registered with the Department of Consumer Protection, and you must apply within two years after the judgment.

    Keep in mind: Connecticut only. The job must be on a residential property of six units or less, cost more than $200 and not be new home construction. For Superior or Federal Court judgments you must first try collecting with a marshal; small claims judgments skip that step.

  13. 13

    Official guidance · OR

    Oregon Construction Contractors Board, Resolving Disputes With Your Contractor

    What it says

    Oregon's Construction Contractors Board takes homeowner complaints for breach of contract or negligent or improper work against licensed contractors. For work on an existing home, the complaint must be filed within one year after the work was substantially completed, and for a residential bond you must first send the contractor a pre-complaint notice by certified mail and wait 30 days.

    Keep in mind: The board says there are no exceptions to its time limits. For a new home the deadline is one year from first occupancy or two years from substantial completion, whichever is earlier. Complaints can only be filed against licensed contractors.

  14. 14

    Statute · Federal

    Federal Arbitration Act, 9 U.S.C. § 2

    What it says

    A written arbitration clause in a contract involving interstate commerce is valid and enforceable, so if your contractor's agreement has one, a court will usually send the dispute to arbitration instead of a trial. You can still challenge the clause on the same grounds that would undo any contract, such as fraud.

    Keep in mind: Whether a particular clause can be avoided depends on its wording and on how courts in your state apply general contract defenses. Read the clause for who pays fees and whether small claims court is allowed.

Legal information, not legal advice

This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.