What a pool or spa bid should include

The short answer

A complete pool bid gives the size, depths and construction type, the plan the price is based on, and every piece of equipment by brand and model. It also covers digging and soil haul-off, the price if the crew hits rock, electrical and gas runs, the safety barrier, decking, permits and startup. Pools are big jobs with clear stages, so if your bid already ties payments to those stages, you're starting from a strong spot.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 14 found in my bid

Vague lines worth a question

  • “Pool per design, approx. 15x30”

    Ask for this in writingAsk for the depths, the shape and a drawing attached to the bid, so you're both pricing the same pool.

  • “Equipment package included”

    Ask for this in writingAsk for each piece by brand and model: pump, filter, heater, sanitizer and automation.

  • “Excavation, normal soil conditions”

    Ask for this in writingAsk what counts as normal, and get the price and a cap for rock or hard digging in writing.

  • “Electrical by others”

    Ask for this in writingAsk who the "others" are, who pays them and who pulls the electrical permit.

  • “Fencing per code by owner”

    Ask for this in writingAsk exactly what the barrier needs to include at your address, and get those requirements in writing if it's your job.

A payment plan tied to finished work

Pool jobs have clear stages and several inspections, so it's easy to pay as the work gets done. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and make sure no payment runs ahead of a finished stage. Our payment schedule checker can test the schedule you were given.

StageShare
Deposit at signing10%
Excavation done and soil hauled away15%
Steel, plumbing and electrical rough-in passed inspection20%
Shell in place (concrete shot, fiberglass set or liner walls up)20%
Decking, coping, tile and equipment installed25%
Final inspection passed, barrier in place and pool started upBalance
Check your own payment schedule →

Comparing two or three bids

  • Make sure every bid prices the same size, depths and construction type.
  • Compare the equipment model by model. A lower bid can mean a smaller filter or a different pump.
  • Check how each bid handles rock or hard digging, and whether there's a cap.
  • See who covers electrical, gas, the safety barrier, decking and startup in each bid, and add any missing ones to that bid.
  • Line up each payment schedule against the construction stages. Our guide to contractor payment schedules helps, and you can run a free bid check on each bid.

Questions to ask before you sign

  1. 1Can you attach the plan, with sizes and depths, to the bid?
  2. 2What happens to the price if you hit rock, and is there a cap?
  3. 3What's the brand and model of each piece of equipment?
  4. 4Who handles the electrical and gas work, and who pulls those permits?
  5. 5What safety barrier does code require here, and who's providing it?
  6. 6Which inspections will there be, and how do the payments line up with them?
  7. 7What do the structure, finish and equipment warranties cover, and for how long?
  8. 8Who pays for filling the pool and the first chemicals?

Permits

Pools and spas usually need a building permit, and the electrical, gas and safety barrier work is commonly inspected too. Check with your city or county building department, and have your licensed contractor pull the permits (see who's responsible for permits).

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

What should a pool construction contract include?

The plan with sizes and depths, construction type, equipment by model, digging and rock terms, electrical and gas, the safety barrier, decking, permits, startup and warranties. Payments should follow stages like excavation, passed inspections and the shell. Our contract guide covers the general terms too.

Should a pool quote include rock removal?

It should at least say how rock or hard digging is priced, per hour or per load, with a cap if possible. Nobody can see underground before digging, so a clear clause is the fair way to handle it for both sides. Ask for it in writing before you sign.

Is the pool fence included in a pool bid?

Not always. Many places require a barrier around a pool, and the bid should say who provides it. If it's your job, get the requirements in writing so the final inspection goes smoothly.

How should I pay a pool builder?

Tie each payment to a finished stage, like excavation, passed inspections, the shell and decking, with a solid share held until startup and final inspection. Keep the deposit modest. If the schedule lists dates instead of stages, ask to switch it to stages before you sign.

Does a spa need its own equipment?

It can share the pool's pump, filter and heater, or have its own. Sharing usually costs less up front, while separate equipment lets you heat the spa on its own. Ask the bid to say which one you're getting.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.