Skip to content
OwnersBack

Bid checklists

What a water or fire damage repair bid should include

The short answer

A complete damage repair bid follows the insurance estimate line by line, or lists every difference, and makes clear who receives the insurance money. It keeps drying and cleanup separate from rebuilding, with moisture readings before walls close, and covers matching materials, permits, a completion date and how your deductible is handled. After a loss it's easy to feel rushed, so taking a day to read the paperwork is a good call.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Repair per insurance scope”

    Ask for this in writingAsk for the contractor's own line-by-line scope next to the insurer's estimate, with any differences listed.

  • “Remediate affected areas”

    Ask for this in writingAsk which rooms and materials are being removed, how drying is measured and for the final moisture readings in writing.

  • “Replace flooring to match”

    Ask for this in writingAsk which rooms get new flooring, the product by name and what happens if the existing floor can't be matched.

  • “Additional damage billed to carrier”

    Ask for this in writingAsk how added work is documented, how you'll approve it before it starts and what you owe if the insurer doesn't cover it.

A payment plan tied to finished work

Insurance money often comes in more than one payment, and checks may be made out to you and your mortgage lender, so tie your payments to finished stages rather than to when checks arrive. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and hold the balance until the final walkthrough. You can test a plan with the payment schedule checker.

StageShare
Deposit at signing10%
Damaged materials removed and drying signed off with readings20%
Framing, wiring and plumbing repairs passed inspection25%
Drywall, cabinets and flooring installed25%
Final inspection, walkthrough and punch list doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Ask each contractor to work from the same insurance estimate, so the bids line up item by item.
  • Compare how each bid handles matching materials, since one may replace a whole floor and another only the damaged room.
  • Check whether each bid separates drying from rebuilding, so you're not comparing a full job to half of one.
  • Read each contract's insurance terms side by side, especially any assignment of benefits or direction to pay.
  • When you've narrowed it down, run a free bid check on the contract before you sign.

Questions to ask before you sign

  1. 1Does your scope follow my insurance estimate, and where does it differ?
  2. 2Does this paperwork include an assignment of benefits or direction to pay?
  3. 3Who's doing the drying, and will I get the final moisture readings?
  4. 4How will you match the flooring, cabinets or siding in the repaired areas?
  5. 5If you find more damage, how do you document it, and will you get my okay first?
  6. 6How is my deductible shown in this bid?
  7. 7Who pulls the permits, and when do you expect to finish?
  8. 8What warranty do you give on the repair work?

Permits

Rebuilding after water or fire damage commonly needs permits for framing, electrical and plumbing work, so check with your city or county building department. The licensed contractor should pull them and schedule the inspections; see who's responsible for permits.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

Should I sign an assignment of benefits for water damage repair?

Read it carefully before you sign, and ask your insurer how it would affect your claim. It can let the contractor deal with the insurer and receive payments directly. If you're unsure, ask whether a simple contract without it would work.

Do I have to use the contractor my insurance company recommends?

Many policies let you choose your own contractor, but check your policy and ask your insurer. Whoever you choose, ask them to work from the insurer's estimate and list any differences.

Should a water damage bid include mold?

It should at least say what happens if mold is found: who tests, who removes it and whether there's a clearance test. Ask for moisture readings before walls are closed either way.

What if the contractor's price is higher than my insurance estimate?

Ask for a line-by-line list of the differences and the reason for each. Your contractor or you can send it to the adjuster for review. Get your written okay on any amount you'll pay yourself before work starts.

What if the contractor asks for more money halfway through?

Ask for a written change order showing what changed and why, and check whether it's going to the insurer. Our page on a contractor asking for more money to finish has next steps.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.

Water and fire damage repair bid: what it should include | OwnersBack