What a concrete or driveway bid should include

The short answer

A complete concrete bid gives the area and thickness in inches, the concrete strength or mix, and the reinforcement, like rebar, wire mesh or fiber. It also covers the gravel base, control joints, slope, finish and removal of the old slab. Thickness, base and reinforcement are hard to check once the concrete is poured, so if your bid already spells out all three, you're in good shape.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Pour new driveway, standard thickness”

    Ask for this in writingAsk for the thickness in inches for each area, and the depth of the gravel base under it.

  • “Reinforced concrete”

    Ask for this in writingAsk whether it's rebar, mesh or fiber, the rebar size and spacing, and how it'll be held at the right height in the slab.

  • “Remove existing as needed”

    Ask for this in writingAsk for a clear yes on breaking out and hauling away the old slab, and whether the disposal fee is included.

  • “Standard finish”

    Ask for this in writingAsk which finish, like broom or exposed aggregate, and which way the broom lines will run.

  • “Cracks not covered”

    Ask for this in writingAsk what the warranty does cover, like sinking sections or cracks past a certain width, and for how long.

A payment plan tied to finished work

Concrete moves fast once the trucks arrive, so tie each payment to something you can see. Keep the deposit modest, or your state's limit, if lower (see deposit limits by state), and check the plan with our payment schedule checker. Try to look at the base and the forms before the pour, since you can't check them after.

StageShare
Deposit at signing10%
Old concrete or asphalt removed and hauled away20%
Base compacted, forms and reinforcement in place (inspected, if required)30%
Concrete poured, finished and joints cut30%
Cured, forms pulled, site cleaned and walkthrough doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Write down the thickness, base depth and reinforcement from each bid. Those three explain most price gaps between concrete bids.
  • Check that all the bids price the same square footage and the same finish.
  • See which bids include breaking out and hauling away the old slab.
  • Compare how each bid handles the apron, the curb cut and the permit.
  • Put the warranty wording side by side, especially what each one says about cracks. Our guide on whether a contractor quote is fair can help, or you can run a free bid check.

Questions to ask before you sign

  1. 1How thick will the slab be, and how deep is the gravel base?
  2. 2What strength mix are you ordering?
  3. 3Will you use rebar, mesh or fiber, and how will it be held up inside the slab?
  4. 4Where will the control joints go?
  5. 5Is breaking out and hauling away the old driveway included?
  6. 6Does the apron or curb cut need a permit, and will you get it?
  7. 7How long before I can walk on it, and how long before I can drive on it?
  8. 8What kind of cracking does your warranty cover?

Permits

A new or wider driveway often needs a permit, especially for the apron or curb cut at the street, and larger slabs sometimes need one too. Check with your city or county building department or public works office, and have your licensed contractor pull any permit (see who's responsible for permits).

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

How thick should a concrete driveway be?

It depends on what will drive on it and on your soil. Driveways are usually thicker than walkways, and heavier vehicles need more. For your bid, the key is that the thickness is written in inches, so you can compare bids and check it before the pour.

Should a driveway quote include rebar?

Many do, while others use wire mesh or fiber instead, or a mix. What matters is that the bid names what's going in and how it's placed. Ask each contractor why they chose it for your driveway.

Is it normal for new concrete to crack?

Some fine cracking is normal, and control joints are there to guide it. Wide cracks, raised edges or sinking sections are a different matter. Your warranty should say which is which, so ask for that wording before you sign.

How long before I can drive on new concrete?

It's usually days before you can walk on it and longer before cars, depending on the mix and the weather. Ask the contractor to write the wait times into the bid so nobody has to guess.

My new driveway is already sinking. What now?

Take photos, check your warranty and contact the contractor in writing. A bid that listed the base depth and thickness helps a lot here. Here's what to do when a contractor won't honor a warranty.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.