Skip to content
OwnersBack

Bid checklists

What a patio or paver bid should include

The short answer

A complete paver bid gives the square footage, the paver or stone by name, the pattern, and how many inches of compacted gravel go under it. It also says which way the patio slopes away from your house, what holds the edges in place and what fills the joints. The base is the part you can't see once it's done, so if your bid already lists its depth as a number, you're in good shape.

Updated November 19, 2026

On this page
  1. What a complete bid spells out
  2. Vague lines worth a question
  3. A payment plan tied to finished work
  4. Comparing two or three bids
  5. Questions to ask before you sign
  6. Permits
  7. Common questions

What a complete bid spells out

Tick these off against your bid. Anything missing is worth a quick question before you sign.

0 of 13 found in my bid

Vague lines worth a question

  • “Install pavers on proper base”

    Ask for this in writingAsk for the excavation depth and inches of compacted gravel, written as numbers.

  • “Paver patio approx. 300 sq ft, color TBD”

    Ask for this in writingAsk for the paver line and size now, or a written allowance, so the price can't change when you pick the color.

  • “Grade for drainage”

    Ask for this in writingAsk which direction the patio slopes and where the water goes once it leaves the patio.

  • “Sand joints”

    Ask for this in writingAsk whether it's polymeric sand or regular sand, and whether sealing is included.

A payment plan tied to finished work

Paver jobs often take days, not months, so the payments can stay simple. Keep the deposit modest, or your state's limit, if lower (here's how deposit limits work by state), and pay the rest as you see the base and the pavers go in. Hold the last share until the joints are filled and the yard is cleaned up, and test the plan with the payment schedule checker.

StageShare
Deposit at signing10%
Area dug out and gravel base compacted, before pavers go down30%
Pavers laid and cut, edge restraint installed40%
Joint sand in, cleanup and walkthrough doneBalance
Check your own payment schedule →

Comparing two or three bids

  • Write down each bid's base depth in inches. It's the biggest hidden difference between paver bids.
  • Make sure every bid prices the same paver line, size and pattern, or ask each contractor to price the same one.
  • Check that all the bids include edge restraint and polymeric sand.
  • Compare extras line by line: steps, seat walls, lighting and sealing.
  • See which bids include soil haul-off and lawn repair, and add those costs to the ones that don't. Our guide on how to compare two contractor estimates walks through it, or you can run a free bid check.

Questions to ask before you sign

  1. 1How deep will you dig, and how many inches of compacted base will go in?
  2. 2Is this base built for foot traffic only, or for a car too?
  3. 3Which way will the patio slope, and where will the water go?
  4. 4What will you use for edge restraint?
  5. 5Will you use polymeric sand, and is sealing included?
  6. 6Who calls 811 before you dig?
  7. 7What does your warranty cover if pavers sink or shift?

Permits

A paver patio at ground level often doesn't need a permit, but walls, steps, covered structures, gas fire features or work over a drainage easement sometimes do. Check with your city or county building department and your HOA, and have your licensed contractor pull any permit the work needs.

Want a second set of eyes on your bid?

Upload your bid, a PDF or phone photos, and see in about a minute what it leaves out or leaves vague, quoted from your own pages. Free, no account.

Common questions

How thick should the base be under pavers?

It depends on your soil and whether cars will drive on it. A driveway needs a deeper base than a patio or walkway. For your bid, what matters is that the depth is written as a number, so you can compare bids and hold everyone to it.

Should a paver quote include polymeric sand?

Most careful bids do, or they say plainly that regular sand is being used. Polymeric sand hardens in the joints and helps with weeds and washout. Ask which one you're getting.

Why do pavers need edge restraint?

Edge restraint holds the outer rows in place so the whole patio stays tight. Without it, the edges can spread and pavers can work loose. The bid should name the type of edging.

Is sealing pavers part of a typical bid?

Often not. Sealing is usually its own line, and some new pavers need time before they can be sealed. Ask whether it's included, which product and when it happens.

What if my new patio starts sinking?

Check the warranty first, then contact the contractor in writing with photos. A bid that lists the base depth and a settling warranty makes this conversation much easier. Here's what to do if a contractor won't honor a warranty.

These checklists describe common trade practice for a complete bid, not legal requirements. Rules vary by state and city.

Paver patio bid checklist: what it should include | OwnersBack