Damage to the home · Solar
Three months after the solar panels went up, Omar found a stain on the bedroom ceiling
The installer’s first answer was that the roof was old. Omar’s own paperwork said otherwise. Here’s how he got the leak traced and the ceiling repaired.
4 min read
This is a composite story, built from common situations homeowners describe. Names and details are illustrative.
On this page
Panels on a roof that was in good shape
Omar signed for a 22 panel solar system at $27,400. Before the contract, someone from the installer climbed onto the roof, took photos and wrote a short report. The roof was 14 years old, and the report said it was in good condition with no repairs needed.
The crew mounted the panels in two days. The system passed inspection and turned on a few weeks later. For the first three months, the only thing Omar noticed was a smaller power bill.
A brown ring on the ceiling, and a quick answer
After a long, heavy rain, Omar noticed a brown ring on the bedroom ceiling. It was right under the part of the roof where the panels sat.
He called the installer and sent photos. The reply came the next day. The roof was older, the stain was likely from a problem the roof already had, and roof repairs weren’t the installer’s responsibility.
Omar went into the attic with a flashlight. Above the stain, the wood under the roof was wet in two spots, each one under a panel mount. He took photos and wrote down the date.
What the contract said about the roof
- Roof warranty
- “Installer warrants all roof penetrations against leaks for ten (10) years from installation.”
- Exclusions
- “Installer is not responsible for pre-existing roof conditions.”
Both lines were in the same contract. The exclusion sounded broad, but the installer’s own site report had called the roof sound. And the wet spots in the attic were under the mounts, which the ten year warranty covered.
The Federal Trade Commission’s guide to home solar says to get the workmanship warranty in writing, and to ask before you sign what happens if your roof needs repair after the system goes in. Omar had the first. He hadn’t asked the second, and it came up later.
None of this proves who caused the leak. It does give a clear reason to ask the installer to come look, and a record of what the roof looked like before.
What to ask
What to ask when a roof leaks after a solar install
Send these in writing with your photos, the attic photos and the dates. Ask for a reply by a set day.
- Can you inspect the mounts above the stain and send photos of what you find?
- Your site report said the roof needed no repairs. What changed?
- Does your roof penetration warranty cover the ceiling and drywall, or only the roof?
- If panels need to come off to fix this, who pays to remove and reinstall them?
- Will your repair affect the warranty on my shingles?
Get it in writing
What to get in writing next time
- A roof condition report with photos, before the install.
- A workmanship warranty that names roof penetrations, with how long it lasts.
- Who pays to remove and reinstall the panels if the roof needs work later.
- Whether the warranty covers damage inside the house, not only the roof.
- Proof that the installer carries liability insurance.
Next step
Omar’s next step, and yours
Omar sent one written claim under the roof penetration warranty. It included the site report, the ceiling photos, the attic photos and a request for an inspection within ten days. The installer sent a different crew. They found two mounts with failed sealant, resealed them and paid a drywall contractor to repair the ceiling.
If an installer won’t help, our page on what to do when a contractor damages your home walks through the options. Whether your homeowners insurance helps depends on your policy, and a contractor without insurance changes the picture. Keep everything in one place with our guide to documenting the problem.
If you’re comparing solar quotes now, look at what each one says about the roof. Our free check points out the warranty and roof lines worth asking about.
Have a bid or contract in hand?
Our Free Bid Check reads it in about a minute and shows the biggest things to ask about, quoted from your own pages. No account needed.
Want a person to read every line?
Bid Review is $99. We check your bid against the 37-item OwnersBack Checklist and your state's rules, a real person on our team signs off, and it's back in two business days.
See Bid ReviewQuestions people ask
Can solar panels cause a roof leak?
The mounts that hold the panels attach through the roof, and each one has to be sealed. A leak can start at a mount or somewhere else on an older roof. An inspection of the mounts above the leak is usually the quickest way to tell.
Who pays for water damage after a solar installation?
It depends on the installer’s warranty and your insurance. Some warranties cover only the roof, not the inside of the house. Read the warranty, then see insurance and contractor damage.
What should a solar workmanship warranty cover?
The FTC suggests getting the workmanship warranty in writing. Look for roof penetrations by name, how long the coverage lasts, whether interior damage is included, and who pays to remove and reinstall panels for roof repairs.
Sources
Rules change. We link to the official source for every rule we mention, so you can check what applies to you.
More stories
General information, not legal advice
These stories share general information to help you ask good questions. They aren't legal advice, and rules vary by state and city. For advice about your situation, talk with a licensed attorney or your state's contractor board.