Tom and Elena’s new AC worked fine. It just never had a permit.
Two months after the install, a service tech asked a simple question: had the job been inspected? It hadn’t. Here’s how Tom and Elena got the permit sorted out.
4 min read
This is a composite story, built from common situations homeowners describe. Names and details are illustrative.
On this page
A hot week and a quick replacement
Tom and Elena’s old air conditioner gave out during a heat wave. They called two companies and picked the one that could come that week. The price was $11,500 for a new outdoor unit, a new indoor coil and the line set between them.
The crew finished in one long day. The house was cool by dinner. Tom and Elena paid the balance when the crew left, as the contract asked.
A service call and one simple question
In August the indoor coil iced over. The installer was booked for two weeks, so Tom called a different company for a service visit.
The second technician fixed the problem and then asked whether the install had been inspected. In their area, the city usually inspects new air conditioning systems. Tom looked up the address on the city’s online permit search. There was no permit on file.
When Tom asked the installer, the answer was friendly but firm. Most people skip the permit on a replacement, it would cost extra, and the homeowner would need to pull it.
What the contract said about permits
- Permits
- “Permits and inspections by owner if required.”
- Warranty
- “1 year labor. Equipment per manufacturer.”
That one line moved the permit from the company that did the work to the people who didn’t. It’s easy to miss in a contract signed during a heat wave.
In many cities and counties, replacing a central air system needs a permit and an inspection. Your local building department decides that, and it can tell you what applies at your address. Our page on who is responsible for permits explains how it usually works.
There’s a second rule worth knowing. Under federal rules, technicians who maintain, service or repair equipment that could release refrigerant must be certified under the EPA’s Section 608 program. Asking who did that part of the job is a fair question, and it doesn’t accuse anyone of anything.
What to ask
What to ask about permits before and after an install
Ask the company in writing. If you’re not sure what your area needs, ask your building department too. They answer this question every day.
- Does this job need a permit here, and will you pull it in your company’s name?
- Is the permit fee included in the price?
- When is the inspection, and will someone from your company be there?
- Who handled the refrigerant, and is that technician EPA Section 608 certified?
- If the inspection finds something to fix, who pays for it?
Get it in writing
What to get in writing next time
- The contractor pulls the permit in its own name, and gives you the permit number before work starts.
- The last payment is due after the job passes final inspection.
- The model numbers of the new equipment and how the size was chosen for your house.
- How long the labor warranty lasts, and who registers the manufacturer’s warranty.
- Who fixes anything the inspector flags, at no added cost to you.
Next step
Tom and Elena’s next step, and yours
Tom and Elena sent one written request. They asked the company to pull the permit, schedule the inspection and fix anything the inspector flagged under the labor warranty, with a reply by a set date. They also called the building department to ask how after-the-fact permits work there. The company agreed, and the system passed on the second visit after a small fix.
If a contractor won’t help, our page on what to do when a contractor didn’t get a permit lays out the options. Before you pull a permit yourself, read what it means when a permit is in your name, because the building department may treat you as the one responsible for the work. If the inspection fails, see who pays after a failed inspection.
If you’re comparing quotes now, look for the permit line first. Our free check flags who pulls the permit and when the last payment is due.
Have a bid or contract in hand?
Our Free Bid Check reads it in about a minute and shows the biggest things to ask about, quoted from your own pages. No account needed.
Want a person to read every line?
Bid Review is $99. We check your bid against the 37-item OwnersBack Checklist and your state's rules, a real person on our team signs off, and it's back in two business days.
See Bid ReviewQuestions people ask
Do you need a permit to replace an air conditioner?
In many cities and counties, yes, and an inspection comes with it. The rules are local, so your building department has the final word. See who is responsible for permits.
What happens if my contractor didn’t pull a permit?
Often the work can be permitted after the fact, though the inspector may ask for changes. Unpermitted work can also come up when you sell. Our pages on work done without a permit and selling a house with unpermitted work cover both.
Should I pull the permit myself?
Ask your building department first. A permit in your name can make you responsible for the work passing inspection. Most homeowners are better off having the licensed contractor pull it. See permits in your name.
Sources
Rules change. We link to the official source for every rule we mention, so you can check what applies to you.