Free Bid Check · HVAC
Is it sized for your house, or just like the last one?
A new system should be sized to your home, not the old unit's label. Upload your heating or cooling quote and see what it says in about a minute.
- Free, no account
- About a minute
- Files deleted, never sold
What we look at in an HVAC bid
Plus the 37-item OwnersBack Checklist every bid gets: license, scope, payments, changes, schedule and warranty.
Sizing
A load calculation for your house, not a match to the old unit.
Exact equipment
Model numbers and efficiency ratings, so you can compare bids fairly.
Ductwork
Whether ducts are checked, sealed, resized or left as they are.
Permit and warranty
Who pulls the permit, and who registers the equipment warranty.


Why we built this
I stepped through the floor of the house we just bought.
The inspections missed the rot. Two contractors and $300,000 later, we moved in. OwnersBack is the second set of eyes we wish we'd had.
Read our storyYour bids stay yours
- Never sold or sent to contractors
- No sales calls
- Not paid by contractors
Why pay $99 when there are free bid tools?
Free tools are a good first look. Before you pay a deposit, the $99 Bid Review adds what software can't.
| What you get | Free online tools | Free Bid Check | Bid Review, $99 |
|---|---|---|---|
| Finds what's missing or risky | Yes | Top 3 | Yes |
| Quotes the bid, with page numbers | Not usually | Top 3 | Yes |
| Full report in Spanish | Chat apps only | Yes | Yes |
| Not paid by contractors | Some do | Yes | Yes |
| Compares bids side by side | Some do | Partly | Yes |
| Money-back guarantee | Free, nothing to pay | Free, nothing to pay | Yes |
| Checks the contract terms | Partly | No | Yes |
| Answers your follow-up in writing | Chat apps only | No | Yes |
| A person checks every finding first | No | No | Yes |
| Your state's rules, with sources | No | No | Yes |
How we checked
From what free bid checkers and chat apps say on their own sites, November 2026. One has experts review its comparisons, but none says a person checks every finding before you see it. One covers California deposit rules only.