Free Bid Check · Addition
That wall might be holding up your house.
Additions tie new work into an old house, and the bid should say who's responsible where they meet. Upload yours and see what it spells out.
- Free, no account
- About a minute
- Files deleted, never sold
What we look at in an addition bid
Plus the 37-item OwnersBack Checklist every bid gets: license, scope, payments, changes, schedule and warranty.
Engineering and plans
Who provides stamped plans, and who pays for a beam if a wall turns out to be load-bearing.
Foundation
Footings, soil, and what happens if digging finds something unexpected.
The tie-in
Joining the roof, siding and floors to the existing house.
Heating and cooling
Whether your system can handle the new space, or what's added.


Why we built this
I stepped through the floor of the house we just bought.
The inspections missed the rot. Two contractors and $300,000 later, we moved in. OwnersBack is the second set of eyes we wish we'd had.
Read our storyYour bids stay yours
- Never sold or sent to contractors
- No sales calls
- Not paid by contractors
Why pay $99 when there are free bid tools?
Free tools are a good first look. Before you pay a deposit, the $99 Bid Review adds what software can't.
| What you get | Free online tools | Free Bid Check | Bid Review, $99 |
|---|---|---|---|
| Finds what's missing or risky | Yes | Top 3 | Yes |
| Quotes the bid, with page numbers | Not usually | Top 3 | Yes |
| Full report in Spanish | Chat apps only | Yes | Yes |
| Not paid by contractors | Some do | Yes | Yes |
| Compares bids side by side | Some do | Partly | Yes |
| Money-back guarantee | Free, nothing to pay | Free, nothing to pay | Yes |
| Checks the contract terms | Partly | No | Yes |
| Answers your follow-up in writing | Chat apps only | No | Yes |
| A person checks every finding first | No | No | Yes |
| Your state's rules, with sources | No | No | Yes |
How we checked
From what free bid checkers and chat apps say on their own sites, November 2026. One has experts review its comparisons, but none says a person checks every finding before you see it. One covers California deposit rules only.