Skip to content
OwnersBack

Free Bid Check · New home

Building a house? Read the draw schedule before the first check.

We built ours, and the payment terms mattered as much as the price. Upload your builder's bid or contract and see what it spells out in about a minute.

  • Free, no account
  • About a minute
  • Files deleted, never sold
How many bids do you have?

Bid 1

Add the bid as a PDF, or photos of each page

PDF or photos, up to 20 MB each. Photos are shrunk on your phone before they're sent.

Your files are read once for this check, then deleted. Never sold, never given to contractors or advertisers, no sales calls.

We keep anonymized prices from your bid (no names or addresses) to compare bids in your area. How we use them

What we look at in a new home bid

Plus the 37-item OwnersBack Checklist every bid gets: license, scope, payments, changes, schedule and warranty.

  1. Draws tied to progress

    Each payment linked to a finished stage or passed inspection, not a date.

  2. Allowances

    What's set aside for finishes and fixtures, and how overages are billed.

  3. Changes

    How change orders are priced and approved in writing before work starts.

  4. Lien releases and finish date

    Lien waivers with each payment, and what happens if the build runs late.

Our upstairs great room in rough framing

Why we built this

I stepped through the floor of the house we just bought.

The inspections missed the rot. Two contractors and $300,000 later, we moved in. OwnersBack is the second set of eyes we wish we'd had.

Read our story

Your bids stay yours

  • Never sold or sent to contractors
  • No sales calls
  • Not paid by contractors

How we protect your files

Why pay $99 when there are free bid tools?

Free tools are a good first look. Before you pay a deposit, the $99 Bid Review adds what software can't.

How OwnersBack compares with other free bid tools
What you getFree online toolsFree Bid CheckBid Review, $99
Finds what's missing or riskyYesTop 3Yes
Quotes the bid, with page numbersNot usuallyTop 3Yes
Full report in SpanishChat apps onlyYesYes
Not paid by contractorsSome doYesYes
Compares bids side by sideSome doPartlyYes
Money-back guaranteeFree, nothing to payFree, nothing to payYes
Checks the contract termsPartlyNoYes
Answers your follow-up in writingChat apps onlyNoYes
A person checks every finding firstNoNoYes
Your state's rules, with sourcesNoNoYes
How we checked

From what free bid checkers and chat apps say on their own sites, November 2026. One has experts review its comparisons, but none says a person checks every finding before you see it. One covers California deposit rules only.

Free New Home Build Bid Check | OwnersBack