Skip to content
OwnersBack

Free Bid Check · Bathroom

A shower lasts or fails behind the tile.

We found rot under our own floor after the inspections. Upload your bathroom bid and see what it says about the work you can't see.

  • Free, no account
  • About a minute
  • Files deleted, never sold
How many bids do you have?

Bid 1

Add the bid as a PDF, or photos of each page

PDF or photos, up to 20 MB each. Photos are shrunk on your phone before they're sent.

Your files are read once for this check, then deleted. Never sold, never given to contractors or advertisers, no sales calls.

We keep anonymized prices from your bid (no names or addresses) to compare bids in your area. How we use them

What we look at in a bathroom bid

Plus the 37-item OwnersBack Checklist every bid gets: license, scope, payments, changes, schedule and warranty.

  1. Waterproofing

    The system or method named, not just “prep shower.”

  2. Hidden damage

    What happens, and what it costs, if they open the floor and find rot.

  3. Tile

    Square footage, the tile allowance, and labor for niches or patterns.

  4. Fan, outlets and permits

    Ventilation, GFCI outlets, and who pulls the permit.

Rotted subfloor we found under our new floor

Why we built this

I stepped through the floor of the house we just bought.

The inspections missed the rot. Two contractors and $300,000 later, we moved in. OwnersBack is the second set of eyes we wish we'd had.

Read our story

Your bids stay yours

  • Never sold or sent to contractors
  • No sales calls
  • Not paid by contractors

How we protect your files

Why pay $99 when there are free bid tools?

Free tools are a good first look. Before you pay a deposit, the $99 Bid Review adds what software can't.

How OwnersBack compares with other free bid tools
What you getFree online toolsFree Bid CheckBid Review, $99
Finds what's missing or riskyYesTop 3Yes
Quotes the bid, with page numbersNot usuallyTop 3Yes
Full report in SpanishChat apps onlyYesYes
Not paid by contractorsSome doYesYes
Compares bids side by sideSome doPartlyYes
Money-back guaranteeFree, nothing to payFree, nothing to payYes
Checks the contract termsPartlyNoYes
Answers your follow-up in writingChat apps onlyNoYes
A person checks every finding firstNoNoYes
Your state's rules, with sourcesNoNoYes
How we checked

From what free bid checkers and chat apps say on their own sites, November 2026. One has experts review its comparisons, but none says a person checks every finding before you see it. One covers California deposit rules only.

Free Bathroom Remodel Bid Check | OwnersBack