Skip to content
OwnersBack

Free Bid Check · Windows

Two window quotes. Are they even for the same windows?

Upload your window or siding quote. In about a minute you'll see what it spells out and what it leaves open, so you can compare bids line for line.

  • Free, no account
  • About a minute
  • Files deleted, never sold
How many bids do you have?

Bid 1

Add the bid as a PDF, or photos of each page

PDF or photos, up to 20 MB each. Photos are shrunk on your phone before they're sent.

Your files are read once for this check, then deleted. Never sold, never given to contractors or advertisers, no sales calls.

We keep anonymized prices from your bid (no names or addresses) to compare bids in your area. How we use them

What we look at in a window bid

Plus the 37-item OwnersBack Checklist every bid gets: license, scope, payments, changes, schedule and warranty.

  1. The exact window

    Brand, series, frame material and glass package, not just “vinyl double-pane.”

  2. How they go in

    Full-frame or insert, and who repairs the stucco, siding or trim around each opening.

  3. Permits and haul-away

    Who pulls the permit, and whether removing the old windows is in the price.

  4. Two warranties

    The maker's warranty on the window and the installer's on the labor, and whether either transfers.

The front of our house after the build

Why we built this

I stepped through the floor of the house we just bought.

The inspections missed the rot. Two contractors and $300,000 later, we moved in. OwnersBack is the second set of eyes we wish we'd had.

Read our story

Your bids stay yours

  • Never sold or sent to contractors
  • No sales calls
  • Not paid by contractors

How we protect your files

Why pay $99 when there are free bid tools?

Free tools are a good first look. Before you pay a deposit, the $99 Bid Review adds what software can't.

How OwnersBack compares with other free bid tools
What you getFree online toolsFree Bid CheckBid Review, $99
Finds what's missing or riskyYesTop 3Yes
Quotes the bid, with page numbersNot usuallyTop 3Yes
Full report in SpanishChat apps onlyYesYes
Not paid by contractorsSome doYesYes
Compares bids side by sideSome doPartlyYes
Money-back guaranteeFree, nothing to payFree, nothing to payYes
Checks the contract termsPartlyNoYes
Answers your follow-up in writingChat apps onlyNoYes
A person checks every finding firstNoNoYes
Your state's rules, with sourcesNoNoYes
How we checked

From what free bid checkers and chat apps say on their own sites, November 2026. One has experts review its comparisons, but none says a person checks every finding before you see it. One covers California deposit rules only.

Free Window Bid Check | OwnersBack