Can I make my contractor pay my attorney fees?

The short answer

Your odds: Depends on the facts

Sometimes. In most states, each side pays its own lawyer unless a contract or a statute says otherwise, so the answer depends on your contract and the laws behind your claim. Many state consumer protection laws, some lien and bond laws, and federal warranty law can make the contractor pay your fees if you win, but some of those rules can also cut against you.

Steps to take
6
Laws and cases cited
23
Last checked

What to know

  • Check your contract first, because an attorney fee clause can decide who pays.
  • Consumer protection laws in states such as Massachusetts, Texas, Washington and New Jersey can let winning homeowners recover attorney fees.
  • Lien and bond laws in some states award fees, including to homeowners who defeat a bad lien.
  • Many state recovery funds do not pay attorney fees, so fees may have to come from the contractor.
On this page
  1. The starting rule
  2. Laws that can make the contractor pay
  3. Liens and bonds
  4. Where fees are not paid, and the risks
  5. Your state's rules, with sources
  6. What to gather
  7. What to do, step by step
  8. When to talk to a lawyer now
  9. Common follow-up questions
  10. Laws and cases on this page

The law, in detailTap a topic to open it.

The starting rule

In most states, each side pays its own lawyer, win or lose, unless a contract or a statute says otherwise. That is why the fee question has two parts: does your contract have a fee clause, and does a law behind your claim shift fees to the winner? The details vary by state, so treat this page as a map, not a promise.

Read your contract for words like attorney fees, prevailing party or costs of collection. A clause that gives fees to the winning side can help you if you win and hurt you if you lose. Some clauses are written to favor only the contractor, and whether a court will apply them both ways depends on your state's law.

Even when a fee rule applies, the court decides what is reasonable. Judges usually look at the hours worked, the hourly rate and how the result compares with what was at stake, and some laws give the judge room to cut or deny fees. A fee award can be smaller than your actual bill, so keep your lawyer focused on the claims that matter most.

  • A fee clause in your contract
  • A consumer protection or home improvement statute that awards fees
  • A lien, bond or warranty law that awards fees

Laws that can make the contractor pay

Consumer protection laws are the most common source. In Massachusetts, a homeowner who wins a consumer protection claim recovers reasonable attorney fees, after sending a written demand at least 30 days before suing[1]. The Massachusetts Supreme Judicial Court held that a roofer's material breach of warranty could support a claim under that law with an award of attorney fees (the owner there rented out the property, so it was treated as a business claim)[2], and in an appeals court case a homeowner whose renovation was left incomplete and poorly done recovered damages plus costs and attorney fees[3].

In Texas, a consumer who wins under the Deceptive Trade Practices Act is awarded court costs and reasonable attorney fees[4]. In New Jersey, the state's highest court held that a homeowner who proves a contractor broke home improvement regulations may recover reasonable attorney fees and costs even without a provable money loss[5]. Washington's Consumer Protection Act allows a reasonable attorney fee[6], but you must prove each element of the claim, including that the conduct affects the public interest[7]. In New York, a homeowner talked into a contract by false written statements can recover reasonable attorney fees[8], and under New York's general consumer protection law, a court may award reasonable attorney's fees to a winning plaintiff hurt by a deceptive business practice[9]. See how consumer protection laws work.

Federal warranty law can help with failed products. If a product with a written or implied warranty fails, such as windows, shingles or an appliance installed in your home, you can sue the warrantor, and if you win the court may award costs including attorney fees based on the time actually spent[10]. That law covers the product, not the contractor's labor by itself.

Being sued can also lead to a fee award. If a contractor sues you and a Texas court dismisses the suit under the Texas Citizens Participation Act, the court must order the contractor to pay your court costs and reasonable attorney's fees[11]. If the court finds your motion to dismiss frivolous or filed only to delay, though, it can make you pay the other side's fees instead. Florida's anti-SLAPP law requires the court to award the winning side reasonable attorney fees and costs[12], but it protects a narrow set of statements, and whether a typical online review qualifies is not settled. See what to do when a contractor sues you.

Liens and bonds

Fighting a lien can come with fees. In a Texas suit to foreclose or remove a mechanic's lien, the court awards costs and reasonable attorney fees as are equitable and just[13]. In California, if the deadlines to record or foreclose a lien have passed and the claimant won't remove an invalid lien, you can petition a court to release your property, and under Civil Code section 8488 you can recover reasonable attorney's fees if you win[14]. In Florida, an owner can sue over a fraudulent lien for damages, attorney fees and possibly punitive damages[15]. In Oklahoma, homeowners who defeated a contractor's lien foreclosure were entitled to a reasonable attorney fee, even though they lost their own claim[16]. See fighting an inflated lien.

Bond claims can include fees too. In Washington, a homeowner who sues on a contractor's bond for breach of contract must start within two years after the work was substantially completed or abandoned, and the winning side can recover costs, interest and reasonable attorney fees[17]. A California appellate department upheld an award against a contractor's license bond that included attorney fees, because the homeowner had a right to fees from the contractor[18]. Bond amounts are limited and shared among claimants, so fees can eat into what is left. See how a bond claim works.

Where fees are not paid, and the risks

Recovery funds usually do not cover fees. Florida's fund does not pay attorney fees, court costs, interest or punitive damages[19], Maryland's does not pay attorney fees or court costs[20], and Minnesota's does not pay attorney fees or litigation costs[21]. Virginia's fund is an exception, since it can include court costs and attorney fees within its cap[22].

Fee rules can also run against you. Under Washington's bond law, the winning side recovers fees, and that can be the contractor. In New York, if a court finds a false-statements suit had no arguable merit, it can order the homeowner to pay the contractor's attorney fees. Before you sue, ask what happens to fees if you lose.

If you win a fraud judgment that includes fees and the contractor then files bankruptcy, the U.S. Supreme Court held that the whole fraud debt, including related attorney fees and costs, survives the bankruptcy[23]. That case involved a landlord, not a contractor, and you still must prove fraud and act in time in the bankruptcy case.

Your state's rules, with sources

Pick your state to see the rules that matter here, each linked to its official source.

What to gather

Tick things off as you collect them. Your list stays on this device only.

0 of 7 gathered

What to do, step by step

  1. 1

    Read the fee clause

    Find any attorney fee or prevailing party clause in your contract and note who it favors.

  2. 2

    Identify the law behind your claim

    Ask whether your state's consumer protection, home improvement, lien, bond or warranty law shifts fees to the winner, and what conditions apply.

  3. 3

    Meet the conditions before you sue

    Some fee laws require a written demand letter first, such as Massachusetts (30 days before suing) and Texas (generally 60 days). OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name.

  4. 4

    Track fees from day one

    Ask your lawyer for detailed, itemized time records, since courts often look at the time actually spent.

  5. 5

    Weigh settlement offers

    In some states, rejecting a reasonable offer can limit the fees you recover later. Compare every written offer with your likely result.

  6. 6

    Ask for fees in your filing

    Make sure your complaint or claim asks for attorney fees and names the statute or contract clause that allows them.

When to talk to a lawyer now

  • Your contract has a fee clause, or the contractor is threatening to make you pay its fees.
  • Your claim may fall under a consumer protection or lien law that awards fees.
  • A lien has been filed on your home and you want it removed.
  • The contractor filed bankruptcy after you won, or are about to win, a fee award.
Find a lawyer in your state

Turn this into a plan you can act on

We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.

Hiring someone new to finish the job? Check their bid for free before you sign.

Common follow-up questions

Can I get attorney fees in small claims court?

There are usually few fees to recover, since most people represent themselves. Court costs such as filing fees may be awarded to the winner, depending on your state.

Can the contractor make me pay its attorney fees?

It can happen if your contract has a fee clause, or if a statute awards fees to the winning side and the contractor wins. In New York, a homeowner whose false-statements suit had no arguable merit can be ordered to pay the contractor's fees.

Do I have to win everything to get fees?

Not always. In an Oklahoma case, homeowners lost their own claim but defeated the contractor's lien foreclosure, and were entitled to a fee for that. How partial wins are treated varies by state and statute.

Will a recovery fund pay for my lawyer?

Usually not. The Florida, Maryland and Minnesota funds do not pay attorney fees. Virginia's fund can include court costs and attorney fees within its cap.

Will a lawyer take my case if fees can be shifted?

A fee-shifting law can make a case more attractive to a lawyer, because the contractor may end up paying. Ask any lawyer you meet how they handle fees under the law that fits your claim.

Laws and cases on this page

Each one was read on its source and checked on November 19, 2026.

  1. 1

    Statute · MA

    Mass. Gen. Laws ch. 93A, § 9

    What it says

    Under the Massachusetts consumer protection law, you must send a written demand for relief at least 30 days before suing over an unfair or deceptive practice. If you win you get your actual damages or $25, whichever is more, the court can award two to three times that amount for willful or knowing violations or a bad-faith refusal to settle, and you recover reasonable attorney fees.

    Keep in mind: Massachusetts only. The 30-day demand is not required for a counterclaim or cross-claim, or if the contractor has no place of business and keeps no assets in Massachusetts. If the contractor makes a reasonable written settlement offer within 30 days and you reject it, your recovery can be limited to that offer and fees after the rejection may not be recovered.

  2. 2

    Court decision · MA · Massachusetts Supreme Judicial Court

    Linthicum v. Archambault, 379 Mass. 381 (1979)

    What it says

    An owner hired a roofer to reshingle a duplex, the roof proved defective, and the roofer offered only minor fixes. The Massachusetts Supreme Judicial Court held that relief under the state's consumer protection law, Chapter 93A, is available in addition to ordinary contract and warranty claims, and that a material breach of warranty could support a 93A claim with an award of attorney fees.

    Keep in mind: Massachusetts case. The owner rented out the property, so the court treated the owner as a business claimant under section 11 rather than a consumer under section 9. Because the breach was negligent, not willful, the owner did not get double or triple damages. Other states may differ.

  3. 3

    Court decision · MA · Massachusetts Appeals Court

    Simas v. House of Cabinets, Inc., 53 Mass. App. Ct. 131 (2001)

    What it says

    A homeowner's renovation was left incomplete and poorly done. The Massachusetts Appeals Court held that violations of the state's home improvement contractor law (Chapter 142A) count as unfair or deceptive acts under the consumer protection law (Chapter 93A), and that using the state arbitration program did not cost the homeowner the right to bring a 93A claim in court. A first demand letter with no dollar figure was enough because it described the harm in enough detail, and a later letter named a specific amount.

    Keep in mind: Massachusetts intermediate appellate case. The homeowner recovered $19,198 in damages plus costs and attorney fees; the opinion does not address multiple damages. Other states may differ.

  4. 4

    Statute · TX

    Tex. Bus. & Com. Code § 17.50 (Deceptive Trade Practices Act)

    What it says

    Under the Texas Deceptive Trade Practices Act, a consumer harmed by deceptive conduct can recover economic damages, and up to three times those damages plus mental anguish damages if the conduct was knowing. A consumer who wins is awarded court costs and reasonable attorney fees, and you generally must give written notice at least 60 days before suing.

    Keep in mind: Texas only. The 60-day notice rule is in § 17.505, not § 17.50. For residential construction defects, Texas Property Code chapter 27 controls wherever it conflicts with the DTPA (§ 17.44(b)), and it has its own notice and inspection steps. The Act has exemptions (§ 17.49), for example for professional advice, so check that your claim fits; the large-contract exemptions do not apply to claims about your own residence.

  5. 5

    Court decision · NJ · Supreme Court of New Jersey

    Cox v. Sears Roebuck & Co., 138 N.J. 2, 647 A.2d 454 (1994)

    What it says

    An 82-year-old homeowner hired a large retailer to remodel the kitchen, and the work was poorly done and done without required permits. The New Jersey Supreme Court held that breaking the state's home improvement regulations is an unlawful practice under the Consumer Fraud Act even without intent to deceive, and a homeowner who proves a money loss gets triple damages plus attorney fees; even without a provable loss, the homeowner may recover reasonable attorney fees and costs.

    Keep in mind: New Jersey case under the New Jersey Consumer Fraud Act and its home improvement regulations. Here the repair cost of $6,830 was trebled to $20,490. Other states' consumer laws differ, and many do not make triple damages automatic.

  6. 6

    Statute · WA

    Wash. Rev. Code § 19.86.090

    What it says

    Under Washington's Consumer Protection Act, a person hurt by an unfair or deceptive business practice can sue for actual damages plus court costs and a reasonable attorney fee. The court may also increase the damages up to three times the actual damages, with the extra amount capped at $25,000.

    Keep in mind: Washington law only. You must still prove all the CPA elements (see Hangman Ridge). Other states have their own consumer laws with different damage multipliers and fee rules.

  7. 7

    Court decision · WA · Washington Supreme Court

    Hangman Ridge Training Stables, Inc. v. Safeco Title Insurance Co., 105 Wn.2d 778, 719 P.2d 531 (1986)

    What it says

    This is the Washington Supreme Court case that sets out the five things a person must prove to win a private Consumer Protection Act claim and recover attorney fees: an unfair or deceptive act, in trade or commerce, that affects the public interest, that injured your business or property, and that caused the injury.

    Keep in mind: Washington Supreme Court case under Washington's CPA; the case involved a title company's escrow closing, not construction, and the plaintiffs lost because they proved none of the elements except trade or commerce. The court said the public interest element is harder to show in a private dispute between two parties than in a consumer transaction, which can matter in a dispute with one contractor. Washington later added a statute on the public interest element (RCW 19.86.093), so check current law. Other states' consumer protection laws have different elements.

  8. 8

    Statute · NY

    N.Y. Gen. Bus. Law § 772

    What it says

    In New York, a homeowner who was talked into a home improvement contract by a contractor's false or fraudulent written statements can recover their damages plus a $500 penalty and reasonable attorney fees.

    Keep in mind: New York only, and the false statements must be in writing. If the court finds the homeowner's suit had no arguable merit, it can order the homeowner to pay the contractor's attorney fees.

  9. 9

    Statute · NY

    N.Y. Gen. Bus. Law § 349

    What it says

    New York's consumer protection law lets anyone hurt by a deceptive business practice sue for actual damages or $50, whichever is greater. If the business acted willfully or knowingly, the court may raise the award up to three times actual damages, capped at $1,000, and may award reasonable attorney's fees to a winning plaintiff.

    Keep in mind: The current text also bans "unfair" and "abusive" practices, but the private lawsuit in subdivision (h) is written for deceptive acts or practices. The treble increase is capped at $1,000, so it helps most with smaller losses; it is in addition to, not a replacement for, a breach of contract claim.

  10. 10

    Statute · Federal

    Magnuson-Moss Warranty Act, 15 U.S.C. § 2310(d)

    What it says

    If a product with a written or implied warranty fails, such as windows, shingles or an appliance installed in your home, you can sue the warrantor for damages, and if you win the court may award your costs including attorney fees based on actual time spent.

    Keep in mind: The Act covers consumer products, including products installed in a home, not the contractor's labor or services by themselves. If the written warranty requires you to use the warrantor's informal dispute program first, you generally must use it before suing (15 U.S.C. § 2310(a)(3)). A case in federal court needs at least $50,000 in controversy across all claims (and each claim at least $25); smaller claims go to state court. The court can deny fees if it finds them inappropriate.

  11. 11

    Statute · TX

    Tex. Civ. Prac. & Rem. Code § 27.009

    What it says

    If a Texas court dismisses a lawsuit under the Texas Citizens Participation Act, it must order the party who sued you to pay your court costs and reasonable attorney's fees for defending the case.

    Keep in mind: Texas only, and only when the court actually dismisses the suit under this chapter. If the court finds your motion to dismiss frivolous or filed only to delay, it can make you pay the other side's costs and fees instead.

  12. 12

    Statute · FL

    Fla. Stat. § 768.295 (Strategic Lawsuits Against Public Participation (SLAPP) prohibited)

    What it says

    Florida bars lawsuits that lack merit and are filed mainly because someone exercised protected free speech on a public issue. A person sued that way can ask for a fast hearing to end the case, and the court must award the winning side reasonable attorney fees and costs.

    Keep in mind: Florida only. The statute defines protected speech narrowly: statements made before a government body on an issue it is reviewing, or made in or in connection with works like a book, news report, broadcast or similar work. Whether a typical online review qualifies is not settled by the text, so ask a Florida lawyer before relying on it.

  13. 13

    Statute · TX

    Tex. Prop. Code § 53.156

    What it says

    In a Texas lawsuit to foreclose or remove a mechanic's lien, the court awards court costs and reasonable attorney fees as are equitable and just. On a residential construction contract, the court is not required to order the property owner to pay the contractor's fees.

    Keep in mind: Texas only, and only in lien suits. Fees are up to the court and must be equitable and just, so they are not guaranteed.

  14. 14

    Official guidance · CA

    CSLB, A Homeowner's Guide to Preventing Mechanics Liens (Cal. Civ. Code §§ 8480 to 8488)

    What it says

    California's licensing board explains that if you recorded a notice of completion, the prime contractor has 60 days and a subcontractor or supplier has 30 days to record a lien. If the deadlines to record or foreclose have passed and the lien claimant will not remove an invalid lien, you can ask a court to release your property, and under Civil Code section 8488 you can recover reasonable attorney's fees if you win.

    Keep in mind: This is an older board guide (the form code suggests about 2016), not the statute text, and the official code site would not load to confirm the current wording. The court process is complicated and may require a lawyer; the guide also says an unlicensed person cannot foreclose a lien on work valued over $500.

  15. 15

    Statute · FL

    Fla. Stat. § 713.31

    What it says

    In Florida, a construction lien is fraudulent if the lienholder willfully exaggerated the amount, willfully claimed work or materials not provided, or was so grossly careless that it amounts to willful exaggeration. A fraudulent lien is unenforceable, the owner can sue for damages, attorney fees and possibly punitive damages, and willfully filing one is a third-degree felony.

    Keep in mind: Florida law only. A minor mistake or a good-faith dispute over the amount owed does not make a lien fraudulent. Other states handle false or inflated liens through their own statutes or through slander of title claims.

  16. 16

    Court decision · OK · Supreme Court of Oklahoma

    Sloan v. Owen, 1977 OK 239, 579 P.2d 812

    What it says

    Homeowners sued their remodeling contractor, and the contractor tried to foreclose a mechanic's lien on their home. The homeowners lost their own claim but beat the lien, and the Oklahoma Supreme Court held they were entitled to a reasonable attorney fee for defeating the lien foreclosure.

    Keep in mind: Oklahoma Supreme Court case applying an Oklahoma lien fee statute as it read in 1971. In most states each side pays its own lawyer unless a contract or statute says otherwise, and fee rules vary widely.

  17. 17

    Statute · WA

    Wash. Rev. Code § 18.27.040

    What it says

    Washington contractors must post a bond of $30,000 (general contractors) or $15,000 (specialty contractors). A residential homeowner can sue on the bond for breach of contract, but must start that action within two years from when the work was substantially completed or abandoned, and the winning side in such a case can recover costs, interest and reasonable attorneys' fees.

    Keep in mind: If claims exceed the bond, workers' wage claims are paid first, then breach of contract claims. Claimants other than residential homeowners are capped at half the bond.

  18. 18

    Court decision · CA · Appellate Department, Superior Court of California, San Luis Obispo County

    Boliver v. Surety Co. of the Pacific, 72 Cal. App. 3d Supp. 22 (1977)

    What it says

    A homeowner whose house was left unfinished and defective sued the contractor and the surety company that issued the contractor's license bond. The court upheld the award against the bond, including attorney fees, because the homeowner had a right to fees from the contractor.

    Keep in mind: California decision from a superior court appellate department, which carries less weight than a Court of Appeal opinion. License bond amounts are limited and shared among all claimants. Other states' bond laws differ.

  19. 19

    Statute · FL

    Fla. Stat. § 489.143

    What it says

    For Florida contracts signed on or after July 1, 2024, the recovery fund pays up to $100,000 per claim against a Division I contractor and up to $30,000 per claim against a Division II contractor. Payment is limited to actual damages, and attorney fees, court costs, interest and punitive damages are not paid by the fund.

    Keep in mind: The fund pays only after you have a judgment, arbitration award or restitution order against the contractor and meet the conditions in Fla. Stat. § 489.141, which is a separate section. Older contracts have lower caps (for example $50,000 per Division I claim for contracts from July 1, 2004 until the 2024 change), and subsection (2) still mentions a $25,000 figure, so confirm the cap for your contract date with the Construction Industry Licensing Board. There are also total caps per contractor ($2 million for a Division I contractor and $600,000 for a Division II contractor on newer contracts), so many victims of the same contractor may share a limited amount.

  20. 20

    Statute · MD

    Md. Code, Bus. Reg. § 8-405

    What it says

    Maryland's Home Improvement Guaranty Fund can pay a homeowner for an actual loss caused by a licensed contractor, up to $30,000 per claimant for one contractor and never more than you paid that contractor. You must file within 3 years after you discovered, or should have discovered, the loss.

    Keep in mind: Maryland only, for licensed contractors. You must live in the home or own no more than three residences, and certain relatives, employees, officers and partners of the contractor cannot claim. The fund does not pay attorney fees, court costs, interest, consequential, personal injury or punitive damages. Total awards for one contractor are capped at $250,000 across all claimants unless the contractor repays the fund, and you may have to arbitrate first if your contract requires it.

  21. 21

    Statute · MN

    Minn. Stat. § 326B.89

    What it says

    Minnesota's Contractor Recovery Fund can pay an owner or lessee of a one-to-four family home who contracted directly with a licensed residential contractor or remodeler and holds a final judgment for fraud, deception, dishonest practices, conversion of funds or failure of performance. Payment is up to $100,000 per licensee for an owner, limited to actual out-of-pocket loss, and you must apply within two years after the judgment becomes final.

    Keep in mind: Minnesota only, for licensed residential contractors. Attorney fees, litigation costs and interest are not paid, and all owners together are capped at $550,000 per licensee.

  22. 22

    Statute · VA

    Va. Code § 54.1-1123

    What it says

    Virginia's recovery fund can pay part of an unpaid court judgment against a licensed contractor, up to $30,000 for a single transaction, counting anything already paid from the contractor's bond. Court costs and attorney fees can be included, but interest and punitive damages cannot.

    Keep in mind: Virginia only. You need a final judgment first. Total payments for one contractor are capped at $100,000 per two-year period, so claims may be prorated if many people file against the same contractor, and the Board may hold payment for up to a year after your judgment if it expects more claims. Other eligibility rules are in § 54.1-1120.

  23. 23

    Court decision · Federal · Supreme Court of the United States

    Cohen v. de la Cruz, 523 U.S. 213 (1998)

    What it says

    When a debt comes from fraud, bankruptcy does not wipe out any of it. The U.S. Supreme Court held that the whole amount, including triple damages awarded under a state consumer fraud law plus related attorney fees and costs, survives the debtor's bankruptcy.

    Keep in mind: U.S. Supreme Court case under federal bankruptcy law. The facts involved a landlord's rent overcharges in New Jersey, not a contractor. The homeowner must prove fraud and usually must file a timely challenge in the bankruptcy case.

Legal information, not legal advice

This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.