The short answer
Your odds: Depends on the factsSometimes, yes. If your contractor lied about a fact to get your money or your signature, and you lost money because you believed it, you may have a fraud claim on top of a breach of contract claim. The hard part is proof: a broken promise alone is usually breach of contract, so you need evidence the contractor knew the statement was false when it was made.
What to know
- Fraud means a knowing lie about a fact that you relied on and that cost you money, not just a job that went badly.
- Many states have consumer protection laws that can be easier to prove than fraud and may add extra damages and attorney fees.
- A fraud debt can survive the contractor's personal bankruptcy, but only if you act inside a short federal deadline.
- Taking money and doing no work can also be a crime in some states, and a police report can run alongside your lawsuit.
On this page
- Do you have a fraud case?
- The legal claims that usually apply
- What courts have said
- When contractor fraud is also a crime
- Mistakes that hurt a fraud claim
- Your state's rules, with sources
- What to gather
- What to do, step by step
- When to talk to a lawyer now
- Common follow-up questions
- Laws and cases on this page
The law, in detailTap a topic to open it.
Do you have a fraud case?
Fraud is a specific claim, and courts take it seriously. In general, you need to show that the contractor made a false statement of fact, knew it was false (or did not care whether it was true), meant for you to rely on it, that you reasonably did rely on it, and that you lost money as a result. The exact elements and how much proof you need differ by state, so treat this as a general outline.
The line that matters most is between a lie and a broken promise. A contractor who said the job would take six weeks and took twelve has probably breached the contract. A contractor who claimed to be licensed when they were not, claimed to have ordered materials that were never ordered, or took a deposit for a job they never planned to start may have committed fraud. In many states, a promise made with no intention of keeping it can count as fraud, but you have to show what the contractor intended at the time, usually through a pattern of conduct.
Courts look for evidence, not suspicion. Texts that contradict each other, a fake license number, invoices for materials that never arrived, or other homeowners with the same story can all help show the contractor knew the truth.
- The contractor said something specific and false (license, insurance, materials, permits, or a start date they never meant to meet).
- The contractor knew it was false, or said it with reckless disregard for the truth.
- You relied on it when you signed or paid.
- You lost money you can measure.
The legal claims that usually apply
Most homeowners plead fraud alongside breach of contract, so they still have a path if the court decides there was no lie, only a failure to perform. The stronger addition is often your state's consumer protection law, because many of these laws do not require proof that the contractor meant to deceive you.
New Jersey's highest court held that breaking the state's home improvement regulations is an unlawful practice under its Consumer Fraud Act even without intent to deceive, and a homeowner who proves a money loss gets triple damages plus attorney fees[1]. In Texas, a consumer harmed by deceptive conduct can recover economic damages, up to three times those damages if the conduct was knowing, and attorney fees, generally after giving written notice at least 60 days before suing (for defects in a home, a separate Texas law with its own notice steps can control)[2]. In Massachusetts, you must send a written demand at least 30 days before suing under the consumer protection law, and willful or knowing violations can bring two to three times your damages plus attorney fees[3]. New York's general consumer protection law lets anyone hurt by a deceptive business practice sue for actual damages or $50, whichever is greater. For willful or knowing conduct, the court may raise the award to as much as three times actual damages, but that increase is capped at $1,000, and it may award reasonable attorney's fees to a winning plaintiff[4].
Some states have laws aimed squarely at contractor lies. In New York, a homeowner talked into a home improvement contract by a contractor's false or fraudulent written statements can recover damages, a $500 penalty and reasonable attorney fees[5]. In Illinois, a contractor's violation of the Home Repair and Remodeling Act lets you sue under the private remedy of the state's Consumer Fraud Act[6]. Other states have their own versions, covered on our consumer protection law page.
What courts have said
Fraud can reach the person, not just the company. The Texas Supreme Court held that a person who works for a company can be personally liable under the Texas Deceptive Trade Practices Act for misrepresentations he makes himself[7]. The Washington Supreme Court held a roofing company's president personally liable under that state's Consumer Protection Act because he took part in the company's unfair and deceptive conduct, even though the court did not pierce the corporate veil[8]. Both cases apply their own state's law, and the person must have taken part in the conduct.
Fraud also matters if the contractor files bankruptcy. A debt for money obtained by false pretenses, a false representation or actual fraud may survive a contractor's personal bankruptcy[9]. The U.S. Supreme Court held that when a debt comes from fraud, the whole amount, including triple damages under a state consumer fraud law and related attorney fees, survives (that case involved a landlord, not a contractor)[10]. It has also held that a scheme to drain a company's money into other companies can count as actual fraud even without a lie told to the creditor[11].
There is a catch. For fraud debts, the debt is wiped out unless you ask the bankruptcy court to rule that it survives[12], and that request generally must be filed within 60 days after the first date set for the meeting of creditors[13]. See what to do if your contractor files bankruptcy.
When contractor fraud is also a crime
Some states make contractor fraud a crime. In Illinois, home repair fraud includes promising work the contractor does not intend to do, and intent is presumed if the contractor did little or no work, keeps your money and, for example, ignores your written demand to start or finish within 10 days[14]. In Florida, a contractor who takes more than 10 percent up front and does not apply for permits or start work on time can face criminal charges if the state proves intent, and failing to refund within 30 days of your written demand can be used to show intent[15]. In Virginia, a contractor who takes an advance with intent to defraud and neither does the work nor returns the money within 15 days of your certified-mail request can be found guilty of larceny if prosecutors prove that intent[16]. Pennsylvania makes home improvement fraud a crime, including lying to get you to sign or to justify a price increase, and taking an advance payment, then not doing the work by the contract date and not returning the money for work not done. It requires intent to defraud or knowledge of the fraud, so an honest dispute over quality is not enough[17].
A criminal case is run by prosecutors, who decide whether to charge, and it does not by itself put money back in your account. Many homeowners file a police report and a civil claim at the same time. You can also report the scam to the FTC, whose reports go into a national database that law enforcement can use[18]. Our page on when a contractor can face criminal charges goes deeper.
Mistakes that hurt a fraud claim
Calling everything fraud. Judges see many disputes where a job went badly and the homeowner calls it a scam. If your evidence shows poor work or delay but no lie, lead with breach of contract and consumer protection claims, and keep fraud for the facts that support it.
Waiting, and threatening. Deadlines to sue, to give pre-suit notice and to act in a bankruptcy can be short, and they vary by state. Missing the bankruptcy deadline can cost you the chance to keep a fraud debt alive. Messages that threaten criminal charges unless you get paid can backfire, so keep your demands factual, calm and in writing.
Your state's rules, with sources
Pick your state to see the rules that matter here, each linked to its official source.
What to gather
Tick things off as you collect them. Your list stays on this device only.
What to do, step by step
- 1
Write down every false statement
List each thing the contractor told you that turned out to be false, when it was said and how (text, email, in person). Match each one to a document or a witness.
- 2
Check the license and insurance
Look up the contractor on your state licensing board's site and save a dated copy. A false license or insurance claim is one of the clearest kinds of misrepresentation.
- 3
Send a written demand
Send a dated demand by certified mail stating the facts, the amount you want back and a deadline. Some states require written notice before a consumer protection suit, and in some a written demand starts a clock that can help prove intent. OwnersBack Dispute Prep can organize your records into a dated timeline, evidence index and a demand letter you send in your own name.
- 4
Report it
File complaints with your state licensing board and attorney general, and report the scam at ReportFraud.ftc.gov. If the contractor took money and did no work, file a police report too.
- 5
Choose where to sue
Smaller claims can go to small claims court, where you can tell the story yourself. Larger fraud claims, claims for triple damages and claims against an owner personally usually belong in regular civil court with a lawyer.
- 6
Watch for a bankruptcy notice
If you get a bankruptcy notice, put the deadline on your calendar right away and talk to a bankruptcy lawyer. A fraud claim survives only if you ask the bankruptcy court in time.
When to talk to a lawyer now
- Your loss is larger than your state's small claims limit, or you want extra damages under a consumer protection law.
- You want to hold the owner or an officer personally liable, not just the company.
- The contractor has filed bankruptcy or you received a bankruptcy notice.
- The contractor has sued you, filed a lien, or claims you owe more money.
Turn this into a plan you can act on
We turn your paperwork, photos and messages into a dated timeline, an evidence index, a step-by-step plan and a demand letter. A person on our team checks every one.
Hiring someone new to finish the job? Check their bid for free before you sign.
Common follow-up questions
What is the difference between fraud and breach of contract?
Breach of contract means the contractor failed to do what the contract required. Fraud means the contractor lied about a fact to get you to sign or pay. Fraud is harder to prove, but it can open the door to extra damages and it can survive bankruptcy.
Can I sue the contractor personally if they have an LLC?
Sometimes. Courts in Texas and Washington have held that individuals can be personally liable under those states' consumer protection laws for deceptive conduct they took part in themselves. Holding an owner liable just because they own the company is much harder.
Will the police get my money back?
Not directly. Prosecutors decide whether to charge, and a criminal case may or may not end with an order to repay you. Most homeowners pursue a civil claim at the same time so they are not depending on the criminal case.
How long do I have to sue for fraud?
It depends on your state and the type of claim. Some states start the clock for fraud when you discovered, or should have discovered, the lie, but the length differs. Check your deadline to sue early, because a missed deadline usually ends the claim.
Can I get my attorney fees back in a fraud case?
Only if a statute or your contract allows it. Several state consumer protection laws let a winning homeowner recover attorney fees, which is one reason to bring those claims alongside fraud.
Laws and cases on this page
Each one was read on its source and checked on November 19, 2026.
- 1
Court decision · NJ · Supreme Court of New Jersey
Cox v. Sears Roebuck & Co., 138 N.J. 2, 647 A.2d 454 (1994)
What it says
An 82-year-old homeowner hired a large retailer to remodel the kitchen, and the work was poorly done and done without required permits. The New Jersey Supreme Court held that breaking the state's home improvement regulations is an unlawful practice under the Consumer Fraud Act even without intent to deceive, and a homeowner who proves a money loss gets triple damages plus attorney fees; even without a provable loss, the homeowner may recover reasonable attorney fees and costs.
Keep in mind: New Jersey case under the New Jersey Consumer Fraud Act and its home improvement regulations. Here the repair cost of $6,830 was trebled to $20,490. Other states' consumer laws differ, and many do not make triple damages automatic.
- 2
Statute · TX
Tex. Bus. & Com. Code § 17.50 (Deceptive Trade Practices Act)
What it says
Under the Texas Deceptive Trade Practices Act, a consumer harmed by deceptive conduct can recover economic damages, and up to three times those damages plus mental anguish damages if the conduct was knowing. A consumer who wins is awarded court costs and reasonable attorney fees, and you generally must give written notice at least 60 days before suing.
Keep in mind: Texas only. The 60-day notice rule is in § 17.505, not § 17.50. For residential construction defects, Texas Property Code chapter 27 controls wherever it conflicts with the DTPA (§ 17.44(b)), and it has its own notice and inspection steps. The Act has exemptions (§ 17.49), for example for professional advice, so check that your claim fits; the large-contract exemptions do not apply to claims about your own residence.
- 3
Statute · MA
Mass. Gen. Laws ch. 93A, § 9
What it says
Under the Massachusetts consumer protection law, you must send a written demand for relief at least 30 days before suing over an unfair or deceptive practice. If you win you get your actual damages or $25, whichever is more, the court can award two to three times that amount for willful or knowing violations or a bad-faith refusal to settle, and you recover reasonable attorney fees.
Keep in mind: Massachusetts only. The 30-day demand is not required for a counterclaim or cross-claim, or if the contractor has no place of business and keeps no assets in Massachusetts. If the contractor makes a reasonable written settlement offer within 30 days and you reject it, your recovery can be limited to that offer and fees after the rejection may not be recovered.
- 4
Statute · NY
N.Y. Gen. Bus. Law § 349
What it says
New York's consumer protection law lets anyone hurt by a deceptive business practice sue for actual damages or $50, whichever is greater. If the business acted willfully or knowingly, the court may raise the award up to three times actual damages, capped at $1,000, and may award reasonable attorney's fees to a winning plaintiff.
Keep in mind: The current text also bans "unfair" and "abusive" practices, but the private lawsuit in subdivision (h) is written for deceptive acts or practices. The treble increase is capped at $1,000, so it helps most with smaller losses; it is in addition to, not a replacement for, a breach of contract claim.
- 5
Statute · NY
N.Y. Gen. Bus. Law § 772
What it says
In New York, a homeowner who was talked into a home improvement contract by a contractor's false or fraudulent written statements can recover their damages plus a $500 penalty and reasonable attorney fees.
Keep in mind: New York only, and the false statements must be in writing. If the court finds the homeowner's suit had no arguable merit, it can order the homeowner to pay the contractor's attorney fees.
- 6
Statute · IL
815 ILCS 513/30 (Home Repair and Remodeling Act)
What it says
In Illinois, if you lose money because a contractor broke the Home Repair and Remodeling Act, you can sue using the private lawsuit remedy of the Illinois Consumer Fraud and Deceptive Business Practices Act (Section 10a).
Keep in mind: Illinois only. You must show actual damage caused by the violation.
- 7
Court decision · TX · Supreme Court of Texas
Miller v. Keyser, 90 S.W.3d 712 (Tex. 2002)
What it says
A homebuilder's sales agent told buyers things about their lots that were not true. The Texas Supreme Court held that a person who works for a company can be personally liable under the Texas Deceptive Trade Practices Act for misrepresentations he makes himself, even when acting for the company.
Keep in mind: Texas Supreme Court case under the Texas DTPA, involving new-home sales rather than a remodeling contract. The court only decided that the agent could be held liable and sent the case back for further proceedings. It also noted that an agent who passes along false company information may seek indemnity from the employer. Other states' consumer laws may treat individual liability differently.
- 8
Court decision · WA · Washington Supreme Court
Grayson v. Nordic Construction Co., 92 Wn.2d 548, 599 P.2d 1271 (1979)
What it says
A roofing company took a payment, tore off part of a house, never finished, and later went bankrupt. The Washington Supreme Court held the company's president personally liable because he took part in the company's unfair and deceptive conduct under the state Consumer Protection Act, even though the court did not pierce the corporate veil.
Keep in mind: Washington Supreme Court case under Washington's Consumer Protection Act. The officer must have personally participated in or knowingly approved the wrongful conduct. Other states have different rules on officer liability.
- 9
Statute · Federal
Bankruptcy Code, 11 U.S.C. § 523(a)(2)(A), (a)(4), (a)(6)
What it says
Some debts survive a contractor's personal bankruptcy. A debt for money obtained by false pretenses, a false representation or actual fraud, for fraud or defalcation while acting in a fiduciary capacity, embezzlement or larceny, or for willful and malicious injury to you or your property may not be wiped out.
Keep in mind: This covers individual debtors. You must prove the fraud or other ground, and for these three types the debt is discharged unless you ask the bankruptcy court and it rules in your favor (see 11 U.S.C. § 523(c)). Chapter 13 cases have different rules on which debts survive.
- 10
Court decision · Federal · Supreme Court of the United States
Cohen v. de la Cruz, 523 U.S. 213 (1998)
What it says
When a debt comes from fraud, bankruptcy does not wipe out any of it. The U.S. Supreme Court held that the whole amount, including triple damages awarded under a state consumer fraud law plus related attorney fees and costs, survives the debtor's bankruptcy.
Keep in mind: U.S. Supreme Court case under federal bankruptcy law. The facts involved a landlord's rent overcharges in New Jersey, not a contractor. The homeowner must prove fraud and usually must file a timely challenge in the bankruptcy case.
- 11
Court decision · Federal · Supreme Court of the United States
Husky International Electronics, Inc. v. Ritz, No. 15-145 (U.S. 2016)
What it says
A business owner drained his company's money into other companies he controlled so it could not pay a creditor. The U.S. Supreme Court held that this kind of asset-shifting scheme can count as "actual fraud," so the resulting debt may survive the owner's personal bankruptcy even if he never told the creditor a lie.
Keep in mind: U.S. Supreme Court case under federal bankruptcy law; it applies nationwide but only decides what counts as "actual fraud." The Court reversed and sent the case back to the lower court; it did not decide whether this particular debt was "obtained by" the scheme and so survived bankruptcy. The creditor still has to prove the fraud in bankruptcy court and meet bankruptcy deadlines. The facts involved an electronics supplier, not a homeowner. The page shows the citation as 578 U.S. ___.
- 12
Statute · Federal
Bankruptcy Code, 11 U.S.C. § 523(c)(1)
What it says
For debts based on fraud, fiduciary defalcation, or willful and malicious injury, the debt is wiped out unless you, as the creditor, ask the bankruptcy court to rule that it is not dischargeable and the court agrees after notice and a hearing. If you do nothing, you can lose the claim.
Keep in mind: There is a short deadline to file this request; it is set by Fed. R. Bankr. P. 4007(c), not by this statute. Different rules apply if the debtor did not list you in the bankruptcy and you did not learn of the case in time to file (subsection (a)(3)(B)).
- 13
Regulation · Federal
Federal Rule of Bankruptcy Procedure 4007(c)
What it says
If your contractor files bankruptcy and you want the court to rule that your fraud-based or similar claim survives, you must file a complaint within 60 days after the first date set for the meeting of creditors. The court can extend that time only if a motion is filed before the deadline runs out.
Keep in mind: This is a strict federal court deadline. A bankruptcy lawyer can help, since this is filed as a separate case inside the bankruptcy.
- 14
Statute · IL
815 ILCS 515/3 (Home Repair Fraud Act)
What it says
In Illinois, home repair fraud includes promising work the contractor does not intend to do, using false promises to get you to sign, requiring an unconscionable price on a contract of $4,000 or more, or damaging your property to get you to hire them. Intent is presumed if the contractor did little or no work, keeps your money, and, for example, ignores your written demand to start or finish within 10 days.
Keep in mind: Illinois only. This is a criminal statute enforced by prosecutors, and the presumption of intent can be rebutted.
- 15
Statute · FL
Fla. Stat. § 489.126
What it says
In Florida, a contractor who takes more than 10 percent of the price up front on a home job must apply for permits within 30 days and start work within 90 days after the permits issue, and a contractor holding more money than the work is worth may not stop work for 90 days without just cause. Doing so with the required intent is a crime, from a misdemeanor under $1,000 up to a first-degree felony at $200,000 or more, and failing to refund within 30 days of your written demand can be used to show intent.
Keep in mind: Florida only. This is a criminal statute: prosecutors decide whether to charge, and the state must prove intent. Your written demand should go by certified mail as the statute describes.
- 16
Statute · VA
Va. Code § 18.2-200.1
What it says
In Virginia, a contractor who takes an advance with intent to defraud, promising to do construction or improvement work, and then neither does the work nor returns the money within 15 days of your certified-mail request, is guilty of larceny.
Keep in mind: Virginia only. This is a criminal statute: prosecutors decide whether to charge, and fraudulent intent must be proven. Send the request by certified mail, return receipt requested, to the address the statute describes.
- 17
Statute · PA
73 P.S. § 517.8 (Home Improvement Consumer Protection Act, section 8)
What it says
Pennsylvania makes home improvement fraud a crime. It includes lying to get someone to sign or to justify a price increase, and taking an advance payment, then failing to do the work by the date in the contract and failing to return the money for work not done.
Keep in mind: A crime requires intent to defraud or knowledge of the fraud; an honest dispute over quality or a delay caused by force majeure, an unforeseen labor strike or an agreed extension is not enough. Prosecutors decide whether to bring charges; report it to local police or the Attorney General.
- 18
Official guidance · Federal
FTC consumer alert: Did you spot a scam? Here's what to do next
What it says
You can report a scam, including a contractor scam, to the FTC at ReportFraud.ftc.gov. Reports go into the Consumer Sentinel Network, a secure national database available to local, state and federal law enforcement, and FTC staff review reports to spot patterns and build cases.
Keep in mind: This FTC page is about reporting; it does not say a report gets your money back.
Read next
- Can a contractor go to jail for taking my money and not doing the work?
- Can I use my state's consumer protection law against my contractor?
- My contractor took my deposit and disappeared. What can I do?
- Can I sue the contractor personally if they have an LLC?
- My contractor filed for bankruptcy. Can I still get my money back?
Legal information, not legal advice
This page explains the law in general terms so you can understand your options. It isn't legal advice for your situation, and reading it doesn't create an attorney-client relationship. Laws change and differ by state, and the facts of your case matter. OwnersBack isn't a law firm. Before you sue, sign a settlement, or miss a deadline, talk to a licensed attorney in your state.