State rules
Virginia contractor rules for homeowners
What Virginia requires of contractors and what it gives you as a homeowner, in plain English. Every rule links to the state statute, licensing agency or court page it comes from.
Last verified against official sources on .
State license or registration
Virginia licenses contractors through the Board for Contractors at DPOR in three classes by job size, sets detailed residential contract rules, and runs a recovery fund for homeowners.
State agency: Virginia Department of Professional and Occupational Regulation, Board for Contractors (DPOR)
Look up a contractor's licenseWhat to ask about in Virginia
- A job over $1,000 from someone with no DPOR license, or a license class too small for the job size (for example, a Class C license on a $40,000 job).
- A contract with no license number, payment schedule, or Recovery Fund statement, or no signed copy given to you before work begins.
- Changes to price or scope agreed only verbally instead of in a signed written change order.
- Work stops for 30 days or more without a valid reason, which the Board treats as abandonment (18VAC50-22-260 B 14).
Licensing
Contractors need a state license for jobs over $1,000. A Class C license covers single jobs over $1,000 but under $30,000, Class B covers $30,000 to under $150,000, and Class A covers $150,000 or more; each class also has a 12-month total limit (Code of Va. § 54.1-1100).
Source: Code of Virginia § 54.1-1100, DefinitionsBond and insurance
There is no general bond requirement. A Class B firm must show a net worth of $15,000 or post a $50,000 surety bond, and a Class A firm must show a net worth of $45,000 or post a $50,000 surety bond (18VAC50-22-50, 18VAC50-22-60).
Source: 18VAC50-22-50, Qualifications for a Class B licenseWhat the contract must include
A residential contract must be written and signed by you and the contractor before work starts or payment is taken. It must include start and estimated finish dates, the total cost, the payment schedule and down payment amount, the materials and work, a statement of cancellation rights, the contractor's name, address, license number and class, and a statement about the Recovery Fund. You must get a signed copy before work begins (18VAC50-22-260 B 8 to B 10).
Source: 18VAC50-22-260, Filing of charges; prohibited actsDeposit limit
No legal cap on deposits was found. The Board for Contractors recommends a down payment of about 10% of the total contract cost, or about 30% when custom-made items are needed.
Source: Virginia Board for Contractors, Statement of Consumer Protections (effective 07/01/2025)Payments
The contract must list the amounts and schedule of progress payments. Keeping payments for work that was not done or only partly done is a prohibited act (18VAC50-22-260 B 9 c and B 16).
Source: 18VAC50-22-260, Filing of charges; prohibited actsYour right to cancel
If a seller came to your home without an invitation or appointment and you signed there, you can cancel in writing until midnight of the third business day after signing. Cash sales under $25 are not covered (Code of Va. §§ 59.1-21.2, 59.1-21.3).
Source: Code of Virginia § 59.1-21.3, Buyer's right to cancelRequired notices
You must sign an acknowledgment that you received and read the DPOR Statement of Consumer Protections, which explains license classes, complaints, the Recovery Fund and Attorney General contacts (18VAC50-22-260 B 9 h).
Source: 18VAC50-22-260, Filing of charges; prohibited actsChange orders
Any change to cost, materials, work or completion date must be in writing and signed by everyone, and failing to get a signed written change order is a prohibited act (18VAC50-22-260 B 9 j and B 31).
Source: 18VAC50-22-260, Filing of charges; prohibited actsLiens
A general contractor must record a lien within 90 days from the last day of the month it last worked or supplied materials, and no later than 90 days after the building is completed. It must mail you a copy, and the lien cannot cover work more than 150 days before its last work, plus retainage up to 10% of the contract price (Code of Va. § 43-4).
Source: Code of Virginia § 43-4, Perfection of lien by general contractorWhere to complain
File a complaint with DPOR's Complaint Analysis and Resolution section at (804) 367-8504 or online. The Board can discipline a contractor for things like abandonment or code violations but cannot order a refund; for money you go through the courts. The Attorney General's Consumer Protection Section is at (800) 552-9963.
Source: Virginia Board for Contractors, Statement of Consumer Protections (effective 07/01/2025)Recovery fund
If you win a Virginia court judgment against a licensed contractor for fraud, misrepresentation, gross negligence, incompetence or intentional building code violations on your home, you may claim from the Contractor Transaction Recovery Fund. A plain breach of contract does not qualify. The cap is $30,000 per claim and $100,000 per contractor per biennium, and you must file within 12 months after the judgment is final.
Source: DPOR, Contractor Transaction Recovery FundSmall claims court
Small claims court handles money claims up to $5,000.
Source: Virginia Courts, Small Claims Court Procedures (revised 10/2024)Federal three-day cancellation rule
Federal law also gives you until midnight of the third business day to cancel many sales made in your home, including home improvement work a door-to-door seller talked you into, when the sale is $25 or more. The seller must tell you about this right and give you cancellation forms. It doesn't cover emergency repairs, repairs you invited the seller over to do, or deals you finalized at the seller's place of business. Saturday counts as a business day.
Source: Federal Trade Commission, Buyer's Remorse: The FTC's Cooling-Off Rule
What to check in your Virginia contract
These OwnersBack Checklist items are where Virginia's rules show up in your paperwork.
- #L1
License or registration number is on the contract
The contractor's state license or registration number appears in the document and matches the business name.
- #L2
Name, address and phone match the state record
The legal business name and a street address (not only a P.O. box) are listed.
- #L4
Bond or recovery-fund coverage is known
Whether the contractor holds a state bond, and whether your state has a recovery fund.
- #P1
Deposit is within your state's limit
The deposit amount compared to your state's rule, if your state has one.
- #P2
Payments are tied to finished work
Each payment is due when a defined, checkable stage is complete, not on dates or "progress".
- #P3
Payments don't get ahead of the work
Total paid at each milestone compared with the share of work done at that point.
- #P5
Lien releases come with payments
Whether the contract provides lien releases or waivers from the contractor, subcontractors and suppliers as you pay.
- #C1
Change orders must be written and signed
The contract requires a written, signed change order before extra work starts.
- #C2
Change orders state price and schedule impact
Each change order shows the added cost and any change to the completion date.
- #R2
Required state notices are included
Your state's required notices, compared against what's attached to the contract.
- #R3
Right-to-cancel notice is present
Whether your state gives you a cancellation window and whether the contract says so.
- #D4
Pre-complaint steps are known
Whether your state requires written notice to the contractor before a complaint, and how it must be sent.
Want a second look at your Virginia contract?
We check your contract, estimate or change orders against Virginia's rules above and the full OwnersBack Checklist. A person reviews every finding before you see it.
Sources
- Code of Virginia § 54.1-1100, Definitions
- 18VAC50-22-50, Qualifications for a Class B license
- 18VAC50-22-260, Filing of charges; prohibited acts
- Virginia Board for Contractors, Statement of Consumer Protections (effective 07/01/2025)
- Code of Virginia § 59.1-21.3, Buyer's right to cancel
- Code of Virginia § 43-4, Perfection of lien by general contractor
- DPOR, Contractor Transaction Recovery Fund
- Virginia Courts, Small Claims Court Procedures (revised 10/2024)
- Federal Trade Commission, Buyer's Remorse: The FTC's Cooling-Off Rule
This is not legal advice.
It's general information from public Virginia sources, last checked November 17, 2026. Laws change and local rules can add to them, so the linked source is the authority. OwnersBack isn't a law firm. For advice about your situation, especially before you file a lien, a claim or a lawsuit, talk to a licensed attorney in Virginia.