Your account

AdminMy dashboardDashboard
Skip to content
OwnersBack

State rules

Minnesota contractor rules for homeowners

What Minnesota requires of contractors and what it gives you as a homeowner, in plain English. Every rule links to the state statute, licensing agency or court page it comes from.

Last verified against official sources on .

State license or registration

Minnesota requires residential building contractors, remodelers and roofers to be licensed by the Department of Labor and Industry, and homeowners who hire a licensee can reach the state's Contractor Recovery Fund.

State agency: Minnesota Department of Labor and Industry (DLI)

Look up a contractor's license

What to ask about in Minnesota

  • A license number starting with IR, or no BC, CR or RR license at all, which shuts you out of the Contractor Recovery Fund.
  • A contract with no pre-lien notice in bold type telling you that you can hold back payment until you get lien waivers.
  • Verbal change orders, or a contractor who will not give you signed copies of the contract and lien waivers.
  • A storm roofer offering to pay or waive your insurance deductible.
  1. Licensing

    Anyone working as a residential building contractor or residential remodeler must hold a DLI license (Minn. Stat. 326B.805). One exemption covers people whose gross annual receipts from this work do not exceed $15,000, but they must hold a certificate of exemption from DLI.

    Source: Minnesota Statutes 326B.805

    License numbers start with BC (building contractor), CR (remodeler) or RR (roofer). Numbers starting with IR are registrations, not licenses, and carry fewer consumer protections.

    Source: DLI, Tips for hiring a contractor
  2. Bond and insurance

    Licensed residential contractors must carry liability and property damage insurance. DLI says the Contractor Recovery Fund replaces bonding requirements; a contractor whose license is suspended after a Fund payout must repay the Fund and post a surety bond of at least $40,000 to be reinstated.

    Source: DLI, Residential contractor FAQs
  3. What the contract must include

    All agreements with a licensee, including change orders, must be in writing and contain a detailed summary of the work, a description of the specific materials (or list of standard features), and the total price or how it will be calculated. Both sides must sign and date them, the licensee must give you written performance guidelines before you sign, and you must get free signed copies of every agreement, the guidelines and any lien waivers (Minn. Stat. 326B.809).

    Source: Minnesota Statutes 326B.809
  4. Your right to cancel

    When the contractor initiated the contact, the contract must include a three-business-day right to cancel. Roofing contracts expected to be paid by insurance must let you cancel if the insurer denies the claim, and contractors may not pay your deductible or offer rewards for hiring them for storm repair.

    Source: DLI, Tips for hiring a contractor
  5. Required notices

    A contractor who uses subcontractors or suppliers must put a pre-lien notice in your written contract (or deliver it within ten days after the work is agreed on if there is no written contract), in at least 10-point bold type if printed. It must warn that unpaid subs and suppliers may file liens and tell you that you may pay them directly and deduct it, or hold back payment until 120 days after completion unless you get a signed lien waiver. A contractor who fails to give this notice loses its lien rights (Minn. Stat. 514.011).

    Source: Minnesota Statutes 514.011
  6. Change orders

    Change orders are agreements that must be in writing, signed and dated by you and the licensee, with a copy given to you (Minn. Stat. 326B.809).

    Source: Minnesota Statutes 326B.809
  7. Liens

    A subcontractor or supplier without a direct contract with you must give you its own pre-lien notice within 45 days after first furnishing labor or materials, and it cannot file a lien if you paid the contractor in full before receiving that notice (Minn. Stat. 514.011). A lien ends 120 days after the last work or materials unless the claimant files a lien statement with the county recorder and delivers a copy to you within those 120 days (Minn. Stat. 514.08).

    Source: Minnesota Statutes 514.08
  8. Where to complain

    File complaints about residential contractors with DLI (651-284-5069 or 800-342-5354, dli.contractor@state.mn.us). Home warranty disputes must first go through DLI's home warranty dispute resolution process.

    Source: DLI, Tips for hiring a contractor
  9. Recovery fund

    If you have a final court judgment against a licensed residential contractor or remodeler for fraud, deceptive practices, conversion of funds or failure of performance, the Contractor Recovery Fund can pay up to $100,000 per owner and $550,000 total per licensee. You must have contracted directly with the licensee for a one- to four-family home in Minnesota and apply within two years after the judgment becomes final (Minn. Stat. 326B.89). Hiring an unlicensed contractor means no access to the Fund.

    Source: Minnesota Statutes 326B.89
  10. Small claims court

    Minnesota conciliation court (small claims) hears claims up to $20,000, or $4,000 for claims involving a consumer credit transaction (Minn. Stat. 491A.01, subd. 3a).

    Source: Minnesota Statutes 491A.01
  11. Federal three-day cancellation rule

    Federal law also gives you until midnight of the third business day to cancel many sales made in your home, including home improvement work a door-to-door seller talked you into, when the sale is $25 or more. The seller must tell you about this right and give you cancellation forms. It doesn't cover emergency repairs, repairs you invited the seller over to do, or deals you finalized at the seller's place of business. Saturday counts as a business day.

    Source: Federal Trade Commission, Buyer's Remorse: The FTC's Cooling-Off Rule

Not confirmed yet

We haven't confirmed a statewide Minnesota rule in official sources on: deposit limit, payments. That doesn't mean nothing applies. Some states have no rule on these, and cities and counties can add their own, so ask your contractor and check with the Minnesota Department of Labor and Industry.

What to check in your Minnesota contract

These OwnersBack Checklist items are where Minnesota's rules show up in your paperwork.

  • #L1

    License or registration number is on the contract

    The contractor's state license or registration number appears in the document and matches the business name.

  • #L2

    Name, address and phone match the state record

    The legal business name and a street address (not only a P.O. box) are listed.

  • #L4

    Bond or recovery-fund coverage is known

    Whether the contractor holds a state bond, and whether your state has a recovery fund.

  • #P5

    Lien releases come with payments

    Whether the contract provides lien releases or waivers from the contractor, subcontractors and suppliers as you pay.

  • #C1

    Change orders must be written and signed

    The contract requires a written, signed change order before extra work starts.

  • #C2

    Change orders state price and schedule impact

    Each change order shows the added cost and any change to the completion date.

  • #R2

    Required state notices are included

    Your state's required notices, compared against what's attached to the contract.

  • #R3

    Right-to-cancel notice is present

    Whether your state gives you a cancellation window and whether the contract says so.

  • #D4

    Pre-complaint steps are known

    Whether your state requires written notice to the contractor before a complaint, and how it must be sent.

Want a second look at your Minnesota contract?

We check your contract, estimate or change orders against Minnesota's rules above and the full OwnersBack Checklist. A person reviews every finding before you see it.

Sources

This is not legal advice.

It's general information from public Minnesota sources, last checked November 17, 2026. Laws change and local rules can add to them, so the linked source is the authority. OwnersBack isn't a law firm. For advice about your situation, especially before you file a lien, a claim or a lawsuit, talk to a licensed attorney in Minnesota.

Minnesota Contractor Rules for Homeowners | OwnersBack