State rules
Maine contractor rules for homeowners
What Maine requires of contractors and what it gives you as a homeowner, in plain English. Every rule links to the state statute, licensing agency or court page it comes from.
Last verified against official sources on .
Licensed by city or county
Maine does not license home contractors, but its Home Construction Contracts law requires a detailed written contract for jobs over $3,000, caps the down payment at one third of the price, and the Attorney General handles consumer complaints.
State agency: Office of the Maine Attorney General, Consumer Protection Division
What to ask about in Maine
- Asking for more than 1/3 of the total price as a down payment (10 M.R.S. § 1487)
- No written, signed contract for a job over $3,000, or one missing the warranty or the dispute resolution choice (10 M.R.S. § 1487)
- Price changes agreed verbally instead of by a written change order (10 M.R.S. § 1487)
- A door-to-door home repair seller who won't give a state license number, or who starts work before your 3 business day cancellation period ends
Licensing
According to the Maine Attorney General, "Maine does not license or regulate home contractors."
Source: Maine Attorney General, Home Construction ContractsOne exception: door-to-door home repair sellers must be licensed by the Maine Department of Professional and Financial Regulation's Office of Professional and Occupational Regulation and must give you their license number at the time of sale (32 M.R.S. §§ 14501-14513). Violations are unfair trade practices with civil penalties between $2,000 and $5,000.
Source: Maine Attorney General, Door-to-Door SalesWhat the contract must include
Any home construction or repair job over $3,000 in materials or labor needs a written contract signed by both you and the contractor, with a copy for each before work starts. It must include both parties' names, addresses and phone numbers, the property location, estimated start and substantial completion dates, the total price, the payment method, a general description of the work and materials, a written warranty that the work is free from faulty materials, built to the applicable building code and done in a skillful manner, and a copy of the Attorney General's consumer information on home construction (10 M.R.S. § 1487).
Source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)The contract must let you and the contractor pick one way to settle disputes, paid for jointly: binding arbitration, nonbinding arbitration, or mediation, and small claims court must remain an option (10 M.R.S. § 1487). The Attorney General says these requirements can be waived only if the contractor tells you your rights and you agree in writing.
Source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)Deposit limit
The initial down payment is limited to no more than 1/3 of the total contract price (10 M.R.S. § 1487(5)).
Source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)Your right to cancel
If you buy from a seller who comes to your home, you have 3 business days to cancel, and if the item will be attached to your home, work cannot begin until those 3 business days pass. After you cancel, you are entitled to a full refund within 15 days (32 M.R.S. §§ 4661-4671). Door-to-door home repair contracts must follow this law too.
Source: Maine Attorney General, Door-to-Door SalesRequired notices
The contract must include a clear and conspicuous notice strongly advising you to visit the Attorney General's website, with its web address and phone number, plus the Attorney General's home construction consumer information as an addendum. If the sale is door-to-door, it must describe your right to cancel, and if insulation is installed in an existing home, the required insulation disclosures (10 M.R.S. § 1487).
Source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)Change orders
Any change that revises the contract price can be made only by entering into a written change order (10 M.R.S. § 1487). The Attorney General describes these as written, mutually signed change orders.
Source: 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)Liens
A contractor, worker or supplier must file a lien statement in the registry of deeds within 90 days after they stop working or supplying materials, and mail you a copy, or the lien dissolves (10 M.R.S. § 3253). They must then file a lawsuit to enforce it within 120 days after the last work or materials (10 M.R.S. § 3255(1)).
Source: 10 M.R.S. § 3253, Dissolution unless claim filed (Maine Legislature)If you did not hire a subcontractor or supplier directly, their lien against your home is limited to the balance you still owe your own contractor, and money you paid your contractor before being sued or receiving their written warning counts in your favor. That warning must say at the top that failing to make sure they are paid before you pay your contractor "may result in your paying twice" (10 M.R.S. § 3255(3)).
Source: 10 M.R.S. § 3255, Liens preserved and enforced by action (Maine Legislature)Where to complain
Contact the Maine Attorney General's Consumer Protection Division by submitting an inquiry online or calling 1-800-436-2131; the office also runs a Consumer Mediation Program.
Source: Maine Attorney General, Home Construction ContractsSmall claims court
Maine small claims court hears cases seeking a money judgment of $10,000 or less (as of January 1, 2026).
Source: Maine Judicial Branch, Small ClaimsFederal three-day cancellation rule
Federal law also gives you until midnight of the third business day to cancel many sales made in your home, including home improvement work a door-to-door seller talked you into, when the sale is $25 or more. The seller must tell you about this right and give you cancellation forms. It doesn't cover emergency repairs, repairs you invited the seller over to do, or deals you finalized at the seller's place of business. Saturday counts as a business day.
Source: Federal Trade Commission, Buyer's Remorse: The FTC's Cooling-Off Rule
Not confirmed yet
We haven't confirmed a statewide Maine rule in official sources on: bond and insurance, payments, recovery fund. That doesn't mean nothing applies. Some states have no rule on these, and cities and counties can add their own, so ask your contractor and check with the Office of the Maine Attorney General, Consumer Protection Division.
What to check in your Maine contract
These OwnersBack Checklist items are where Maine's rules show up in your paperwork.
- #L1
License or registration number is on the contract
The contractor's state license or registration number appears in the document and matches the business name.
- #L2
Name, address and phone match the state record
The legal business name and a street address (not only a P.O. box) are listed.
- #P1
Deposit is within your state's limit
The deposit amount compared to your state's rule, if your state has one.
- #P5
Lien releases come with payments
Whether the contract provides lien releases or waivers from the contractor, subcontractors and suppliers as you pay.
- #C1
Change orders must be written and signed
The contract requires a written, signed change order before extra work starts.
- #C2
Change orders state price and schedule impact
Each change order shows the added cost and any change to the completion date.
- #R2
Required state notices are included
Your state's required notices, compared against what's attached to the contract.
- #R3
Right-to-cancel notice is present
Whether your state gives you a cancellation window and whether the contract says so.
- #D4
Pre-complaint steps are known
Whether your state requires written notice to the contractor before a complaint, and how it must be sent.
Want a second look at your Maine contract?
We check your contract, estimate or change orders against Maine's rules above and the full OwnersBack Checklist. A person reviews every finding before you see it.
Sources
- Maine Attorney General, Home Construction Contracts
- Maine Attorney General, Door-to-Door Sales
- 10 M.R.S. § 1487, Home construction contracts (Maine Legislature)
- 10 M.R.S. § 3253, Dissolution unless claim filed (Maine Legislature)
- 10 M.R.S. § 3255, Liens preserved and enforced by action (Maine Legislature)
- Maine Judicial Branch, Small Claims
- Federal Trade Commission, Buyer's Remorse: The FTC's Cooling-Off Rule
This is not legal advice.
It's general information from public Maine sources, last checked November 17, 2026. Laws change and local rules can add to them, so the linked source is the authority. OwnersBack isn't a law firm. For advice about your situation, especially before you file a lien, a claim or a lawsuit, talk to a licensed attorney in Maine.