For contractors
Win the job before the homeowner reads the fine print.
Homeowners are checking contractor bids with OwnersBack. BidReady runs your proposal through the same checklist first, shows what's missing, and hands you wording for your state to fix it.
- 1 free check a month. No card.
- All 50 states and DC
- English and Spanish
Built on the checklist homeowners already use
- items checked, the same list homeowners use
- 29
- items checked, the same list homeowners use
- states and DC with deposit and cancellation rules on file
- 51
- states and DC with deposit and cancellation rules on file
- typical check, start to finish
- 2 min
- typical check, start to finish
The homeowner's side of the table
Same proposal. Very different first impression.
Homeowners line up three bids and look for reasons to trust one. The badge answers their questions before they ask them.
A proposal without the badge
- Is this contractor licensed?
- Why half the money up front?
- What if we change something halfway?
- Will a supplier come after us if they don't pay?
“Let's get one more bid.”
The same proposal, BidReady Checked
- License number listed, with the state lookup
- Paid as each stage is finished
- Changes in writing, signed before work starts
- Lien waiver with every payment
“This one covers what we were worried about.”
Fix it in one paste
From a weak line to wording homeowners trust.
Every gap comes with suggested wording, with your state's limit filled in. Here is what that looks like for a job in California.
Before
Progress payments due every two weeks regardless of progress.
Homeowners read this as paying for time, not work.
After · Payments tied to finished work
California rulesPayment schedule: Each payment is due when the stage is complete:
1. Demolition complete: $amount.
2. Rough-in passed inspection: $amount.
3. Cabinets and counters installed: $amount.
4. Final (see completion): $amount.
If you bill progress every two weeks, bill only for work completed in that period.
Why it matters: Homeowners have been burned by payments on a clock that kept coming while no one was on site. Milestones show you get paid for work, not time.
Suggested wording is a starting point, not legal advice. Have your attorney review your contract.
Two minutes, start to finish
How it works
- 1
Upload or paste
Your PDF, photos of a paper proposal, or the text from your estimating software.
- 2
See what a homeowner will see
Each item marked as covered, weak or missing, with the line from your proposal.
- 3
Fix it with wording for your state
Suggested clauses with your state's deposit limit and cancellation rule filled in. Copy, paste, send.
- 4
Share the badge
When every key protection is there, add a BidReady Checked badge the homeowner can verify against the exact file you sent.
The checklist
What we check
The six items in bold are required for the badge. The rest raise your score and answer questions before the homeowner asks them.
Required for the badge
Who you are
4 items- License or registration number (Required for the badge)
- Legal name and street address
- Insurance stated
- Subcontractors disclosed
What's included
6 items- Specific scope
- Materials named
- Allowances explained
- Exclusions listed
- Hidden-condition terms
- Cleanup and debris
How the money moves
6 items- Deposit within the state's limit (Required for the badge)
- Payments tied to finished work (Required for the badge)
- Payments in step with the work
- Final payment held to completion
- Lien waivers with payments (Required for the badge)
- Total price and what changes it
When plans change
3 items- Written change orders (Required for the badge)
- Change orders show price and time
- Pricing for extras
Schedule
3 items- Start and finish dates
- Delays defined
- Point of contact and updates
Permits, notices and the owner's rights
4 items- Permits assigned
- State-required notices
- Right-to-cancel notice (Required for the badge)
- Fair dispute terms
Warranty and completion
3 items- Workmanship warranty
- Manufacturer warranties handed over
- "Complete" defined
Proof, not a promise
A badge homeowners can verify
Every badge links to a page on ownersback.com that says what it means and when it was issued. The homeowner can drop in the PDF you sent: if it isn't the exact file that was checked, the page says so.
- Tied to one exact file. Edit the file and the badge no longer matches.
- You can't buy a pass. Paid plans get more checks, never a different result.
- It says what's in the document, not how good the work is.
BidReady Checked: this bid includes the key protections a homeowner should expect, like license info, a payment schedule, change-order terms and lien waivers.
BR-7Q4M-2KXD · Nov 19, 2026
What the homeowner sees
This badge is valid
Issued
Nov 19, 2026
ownersback.com/v/BR-7Q4M-2KXD
Match. This is the exact file that was checked.
Pricing
Free tells you what's missing. Pro shows the homeowner you fixed it.
Free
$0
Included
- 1 check a month
- Every item and your state's rules
- Suggested wording for each fix
Not in Free
- BidReady Checked badge
- Verify link and QR code
- Unlimited checks
- Team seats
- Clause templates
- Stamped PDF
Pro
Recommended$39/month
Billed monthly. Cancel anytime.
Included
- BidReady Checked badge with a verify link and QR code
- Unlimited checks
- Up to 5 team seats
- Proposal history and side-by-side versions
- Clause templates you reuse on every proposal
- Stamped PDF with the badge and QR code
Every proposal you send goes out with proof a homeowner can check in seconds.
Go ProPaying never changes a result. A proposal earns the badge only when it includes the key protections.
- $39
- a month. Less than one hour of a crew's time.
- 1 job
- won from a stronger proposal pays for Pro for years.
- $0
- buys a better result. Every plan runs the same check.
Why we built it
We raise the bar on bids.
Bobby, our co-founder, once signed a contract with a payment every two weeks, whether or not anyone worked on the house. For four months he kept paying while the work crawled. OwnersBack helps homeowners catch that before they sign. BidReady lets the contractors who already do it right prove it.
Bobby and Kristi, co-founders of OwnersBack
Homeowners get protected. Contractors who meet the bar win more jobs and get into fewer disputes.
Questions contractors ask
Is this legal advice?
Do you keep my proposal?
What does the badge mean?
Can I pay to pass?
Does a homeowner see my check?
Which states?
Send the proposal homeowners are hoping for.
1 free check a month. No card.